Loading…
Loading…
Tender Value
₹78.9 L
EMD Value
₹50,000
Closing Date
29 Jul 2026, 4:00 pmClosed
PROJECT ENGINEER I KLDC THRISSUR
Office of the project Engineer i, K L D C Ltd Thrissur Near Ramanilayam Guest House Thrissur-680020
App1Engine shed 2Kodannur kole farming society Ino, 1Karimpatta-1,Ramp1-Nelkathir padavu,Kadachal 30 mtr ar Chiyyaram Samajam,Retaining wall at Kizhakkan kole padavu
2026_KLDC_861480_1
KLDC/TSR/2026-27/2(1)(PE-I)
Open Tender
Civil Works - Others
Item Rate
360 days
KarimpataKizhakkankoleNelkathirkoleKodanurchiyaram
Please refer Tender documents.
4 documents required · 4 mandatory
₹2,950
₹50,000
7 Sept 2026
21 Jul 2026
1 Aug 2026
21 Jul 2026
29 Jul 2026
21 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1App. 1- Engine shed 2 no (Kodannur kole farming society 1no, Karimpatta 1 no), Ramp 1 no (Nelkathir padavu), Kadachal 30 mtr ar Chiyyaram Samajam, Retaining wall at Kizhakkan kole padavu | |||||
| 1.001 | 2.6.1
Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil | 0.6 | cum | - | - |
| - | 51.2.3
Filling with Quarry Muck Filling up low lying and water logged areas with local material/ quarry muck, spreading in layers, leveling the top at site and consolidation by ramming, etc complete for improving the CBR value of subgrade | 0.6 | cum | - | - |
| - | 4.1.6
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:3:6 (1 Cement : 3 coarse sand (zone-III) derived from natural sources : 6 graded stone aggregate 40 mm nominal size derived from natural sources) | - | cum | - | - |
| - | 4.3.1
Centering and shuttering including strutting, propping etc. and removal of form work for: Foundations, footings, bases for columns | 0.8 | sqm | - | - |
| - | 4.3.2
Centering and shuttering including strutting, propping etc. and removal of form work for:Retaining walls, return walls, (any thickness) including attached pilasters, buttresses, plinth and string courses fillets, kerbs and steps etc. | 0.2 | sqm | - | - |
| - | 5.1.3
Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:2:4 ( 1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size derived from natural sources) | 0.6 | cum | - | - |
| - | 5.22.6
Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more | - | kilogram | - | - |
| - | 5.9.5
Centering and shuttering including strutting, etc. and removal of form for:Lintels, beams, plinth beams, girders bressumers and cantilevers | - | sqm | - | - |
| - | 2.25
Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundation etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m. | - | cum | - | - |
stage.html
html • 0.02 MB
cancelled_1.pdf
pdf • 0.30 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.33 MB
BOQ_1456952.xls
BOQ • 0.27 MB
TenderDocKarimpatta.pdf
Tender Documents • 1.20 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .