Karnataka Forest Department
B T Haleesh
Construction of 4 Nos Nala Bunds at Doddachelluru RF (Doddachelluru Sy 49, 51, 44, 35) of Challakere Range in Chitradurga Territorial Forest Division during 2025-26. Vide This Office Tender Notification Unit No. 266/2025-26. Reserved for SC.
KFD/2026-27/OW/WORK_INDENT37162
KFD/2026-27/OW/WORK_INDENT37162
Reserved
Other Works
Two Tender Document System(Two Cover)
KFD DCF Territorial Division Office Chitradurga
₹500
₹16,420
24 Apr 2026
11 Apr 2026
25 Apr 2026
23 Apr 2026
Construction of 4 Nos Nala Bunds at Doddachelluru RF (Doddachelluru Sy 49, 51, 44, 35) of Challakere Range in Chitradurga Territorial Forest Division during 2025-26. Vide This Office Tender Notification Unit No. 266/2025-26.
Clearing and grubbing road land including uprooting rank vegitation, grass, bush, shrubs, saplings and trees of girth upto 300 mm, removal stumps of trees cut earlier and disp...
Excavation for seating the dam, tail channel, spillway, intake structure and appurtenant works including placing neatly or disposing off the excavated stuff as directed etc., complete with all leads a...
Providing casing embankment using semi-pervious / pervious approved soil from borrow areas in layers of 250 to 300 mm (before compaction ) including cost of all materials, machinery, labour, all other...
Construction of Embankment by excavating the available approved Gravel/Murrum deposited at a place or borrow pits during or prior excavation with all lifts and lead, transportation to site, spreading,...
Providing and constructing dry rubble stone pitching with pin headers at 2 per m2 using stones and stone chips from approved source including cost of all materials, labour, hand packing / wedging ston...
Clearing and grubbing road land including uprooting rank vegitation, grass, bush, shrubs, saplings and trees of girth upto 300 mm, removal stumps of trees cut earlier and disp...
Excavation for seating the dam, tail channel, spillway, intake structure and appurtenant works including placing neatly or disposing off the excavated stuff as directed etc., complete with all leads a...
Providing casing embankment using semi-pervious / pervious approved soil from borrow areas in layers of 250 to 300 mm (before compaction ) including cost of all materials, machinery, labour, all other...
Construction of Embankment by excavating the available approved Gravel/Murrum deposited at a place or borrow pits during or prior excavation with all lifts and lead, transportation to site, spreading,...
Providing and constructing dry rubble stone pitching with pin headers at 2 per m2 using stones and stone chips from approved source including cost of all materials, labour, hand packing / wedging ston...
Clearing and grubbing road land including uprooting rank vegitation, grass, bush, shrubs, saplings and trees of girth upto 300 mm, removal stumps of trees cut earlier and disp...
Excavation for seating the dam, tail channel, spillway, intake structure and appurtenant works including placing neatly or disposing off the excavated stuff as directed etc., complete with all leads a...
Providing casing embankment using semi-pervious / pervious approved soil from borrow areas in layers of 250 to 300 mm (before compaction ) including cost of all materials, machinery, labour, all other...
Construction of Embankment by excavating the available approved Gravel/Murrum deposited at a place or borrow pits during or prior excavation with all lifts and lead, transportation to site, spreading,...
Providing and constructing dry rubble stone pitching with pin headers at 2 per m2 using stones and stone chips from approved source including cost of all materials, labour, hand packing / wedging ston...
Clearing and grubbing road land including uprooting rank vegitation, grass, bush, shrubs, saplings and trees of girth upto 300 mm, removal stumps of trees cut earlier and disp...
Excavation for seating the dam, tail channel, spillway, intake structure and appurtenant works including placing neatly or disposing off the excavated stuff as directed etc., complete with all leads a...
Providing casing embankment using semi-pervious / pervious approved soil from borrow areas in layers of 250 to 300 mm (before compaction ) including cost of all materials, machinery, labour, all other...
Construction of Embankment by excavating the available approved Gravel/Murrum deposited at a place or borrow pits during or prior excavation with all lifts and lead, transportation to site, spreading,...
Providing and constructing dry rubble stone pitching with pin headers at 2 per m2 using stones and stone chips from approved source including cost of all materials, labour, hand packing / wedging ston...
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
Civil Works Tender New SMC.pdf
Instructions to Tenderers • 1.12 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .