Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹55.8 LAccepted-Finance | ₹55.8 L | L1 | Accepted-Finance L1 |
| 2 | L2₹58.4 L+₹2.6 L (4.68%)Accepted-Finance | ₹58.4 L+₹2.6 L (4.68%) | L2 | Accepted-Finance L2 |
| 3 | L3₹63.0 L+₹7.2 L (13.0%)Accepted-Finance | ₹63.0 L+₹7.2 L (13.0%) | L3 | Accepted-Finance L3 |
| 4 | L4₹65.6 L+₹9.8 L (17.6%)Rejected-Finance | ₹65.6 L+₹9.8 L (17.6%) | L4 | Rejected-Finance L4 |
| 5 | L5₹66.2 L+₹10.4 L (18.7%)Rejected-Finance | ₹66.2 L+₹10.4 L (18.7%) | L5 | Rejected-Finance L5 |
| Sl No | Description | Qty | Unit | K R SURESH L7 | Horizia Construction(india)pvt ltd L8 | B.A AMOO L5 | NAJEEM ARSHAD K Z L3 | MUHAMMED AFREED C H L1 | MUHAMMED SHAHEED PT L4 | C MOHAMMED MUSTHAFA L2 | SAHAD L9 | HANEEFA K L6 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00Working charges for Pipe Line Works | ||||||||||||
| 1.00 | 100.1.1:Excavating trenches of required width for pipes, cables, etc., including excavation for sockets, and dressing of sides, ramming of bottoms, depth up to 1.5m, including getting out the excavated soil, and then returning the soil as required, in layers not exceeding 20cm in depth, including consolidating each deposited layer by ramming, watering, etc., and disposing of surplus excavated soil as directed, within a lead of 50m, in all kinds of soil. | 1,744.2 | cum | 600 ₹10,46,520 | 557 ₹9,71,519.4 | 373.76 ₹6,51,912.19 Lowest | 400 ₹6,97,680 | 450.32 ₹7,85,448.14 | 529.66 ₹9,23,832.97 | 471.34 ₹8,22,111.23 | 584.74 ₹10,19,903.51 | 562.22 ₹9,80,624.12 |
| 1.00 | 100.1.5:Excavating trenches of required width for pipes, cables, etc., including excavation for sockets, and dressing of sides, ramming of bottoms, depth up to 1.5m, including getting out the excavated soil, and then returning the soil as required, in layers not exceeding 20cm in depth, including consolidating each deposited layer by ramming, watering, etc., and disposing of surplus excavated soil as directed, within a lead of 50 m, in Ordinary Rock. | 193.8 | cum | 750 ₹1,45,350 | 821 ₹1,59,109.8 | 551.31 ₹1,06,843.88 | 500 ₹96,900 Lowest | 664.24 ₹1,28,729.71 | 781.28 ₹1,51,412.06 | 695.25 ₹1,34,739.45 | 862.51 ₹1,67,154.44 | 829.3 ₹1,60,718.34 |
| 1.00 | 100.8.1:Fencing one side of trenches, 1.50m height with two rows of 10cm plastic caution tape in vertical casuarina pole (girth 15cm to 24cm) fixed at 2m intervals. | 210 | metre | 20 ₹4,200 | 27 ₹5,670 | 18.23 ₹3,828.3 Lowest | 20 ₹4,200 | 21.4 ₹4,494 | 25.17 ₹5,285.7 | 22.4 ₹4,704 | 27.79 ₹5,835.9 | 26.72 ₹5,611.2 |
| 1.00 | OD57569/2025-2026:Demolishing cement concrete manually / by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in-Charge. Concrete road | 15 | cum | 650 ₹9,750 | 773 ₹11,595 | 518.86 ₹7,782.9 Lowest | 1,750 ₹26,250 | 625.14 ₹9,377.1 | 735.29 ₹11,029.35 | 654.33 ₹9,814.95 | 811.74 ₹12,176.1 | 780.49 ₹11,707.35 |
| 1.00 | OD57562/2025-2026:Dismantling manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer -in-Charge: Bituminous road | 325 | sqm | 70 ₹22,750 Lowest | 89 ₹28,925 | 244.42 ₹79,436.5 | 255 ₹82,875 | 71.86 ₹23,354.5 | 84.51 ₹27,465.75 | 75.21 ₹24,443.25 | 93.31 ₹30,325.75 | 89.71 ₹29,155.75 |
| 1.01 | 100.59.1:Cutting the bituminous / concrete roads with cutting machine for a minimum depth of 200mm along the sides of proposed alignment of the pipe to be laid without causing any damage to other utilities, including the charges for hire and conveyance of tools and plant, cost of consumables and charges for lighting, watching, ribbon fencing, caution boards, traffic diversion, and as per the direction of departmental officers etc. complete, before carrying out the demolition of bituminous / concrete road by mechanical means and carrying out the excavation. | 850 | metre | 20 ₹17,000 | 23 ₹19,550 | 14.94 ₹12,699 Lowest | 25 ₹21,250 | 18 ₹15,300 | 21.17 ₹17,994.5 | 18.84 ₹16,014 | 23.37 ₹19,864.5 | 22.47 ₹19,099.5 |
| 1.01 | 100.9.11:Laying uPVC pipes of class 2 to class 6 and specials, lowering to the trenches already made, placing in position aligning the pipeline to the lines and levels and jointing the pipes and specials with solvent cement and testing the pipeline with water to the required test pressure (excluding cost of pipes and specials): 160 mm nominal outside diameter pipes. | 840 | metre | 130 ₹1,09,200 Lowest | 200 ₹1,68,000 | 133.89 ₹1,12,467.6 | 150 ₹1,26,000 | 161.32 ₹1,35,508.8 | 189.74 ₹1,59,381.6 | 168.85 ₹1,41,834 | 209.47 ₹1,75,954.8 | 201.41 ₹1,69,184.4 |
| 1.01 | 100.9.10:Laying uPVC pipes of class 2 to class 6 and specials, lowering to the trenches already made, placing in position aligning the pipeline to the lines and levels and jointing the pipes and specials with solvent cement and testing the pipeline with water to the required test pressure (excluding cost of pipes and specials): 140 mm nominal outside diameter pipes. | 250 | metre | 130 ₹32,500 | 166 ₹41,500 | 104.12 ₹26,030 Lowest | 140 ₹35,000 | 133.9 ₹33,475 | 157.48 ₹39,370 | 140.15 ₹35,037.5 | 173.86 ₹43,465 | 167.17 ₹41,792.5 |
| 1.01 | 100.9.9:Laying uPVC pipes of class 2 to class 6 and specials, lowering to the trenches already made, placing in position aligning the pipeline to the lines and levels and jointing the pipes and specials with solvent cement and testing the pipeline with water to the required test pressure (excluding cost of pipes and specials): 110 mm nominal outside diameter pipes. | 1,908 | metre | 80 ₹1,52,640 Lowest | 126 ₹2,40,408 | 84.67 ₹1,61,550.36 | 110 ₹2,09,880 | 102.02 ₹1,94,654.16 | 119.99 ₹2,28,940.92 | 106.78 ₹2,03,736.24 | 132.47 ₹2,52,752.76 | 127.37 ₹2,43,021.96 |
Tender Value
Refer Docs
EMD Value
₹50,000
Closing Date
21 Oct 2025, 3:00 pmClosed
Executive Engineer
Office of Executive Engineer KWA, PH Division, Shoranur
AMRUT 2.0- SWAP-3 UWSS to Ottapalam Municipality - Package -3 - Supplying, laying and commissioning of Balance Distribution network in Ward 16 to 36 and providing 80 Nos FHTCs at various places -Ottapalam Municipality-General Civil Work
2025_KWA_808158_1
WRD/KWA-CE(NR)/TR/8921/2025
Open Tender
Civil Works - Water Works
Item Rate
180 days
KWA, PH Division, Shoranur
Please refer Tender documents.
5 documents required · 5 mandatory
₹2,760
₹50,000
14 Jan 2026
10 Oct 2025
22 Oct 2025
10 Oct 2025
21 Oct 2025
10 Oct 2025
stage.html
html • 0.06 MB
techsummary_1347491.pdf
finsummary_1347491.pdf
finance_1347491.pdf
boq_comp_chart.xlsx
xlsx
cancelled_1.pdf
pdf • 0.11 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
KWAGeneralConditionsforeTenderingV5.pdf
PDF • 0.69 MB
Tendernotice_1.pdf
PDF • 0.09 MB
SBD1.pdf
Tender Documents • 0.61 MB
PA.pdf
Other Document • 0.03 MB
BOQ_1347491.xls
BOQ • 0.35 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .