Executive Engineer, Panchayat R&B Division Mehsana
Construction of Community Hall at Devpura, Ta. Vijapur, Dist. Mehsana
288698
32 of 2025-26 SN.1 Vijapur
Open
Civil - All
Works
Mehsana
5 documents required · 5 mandatory
₹900
Yes
Executive Engineer, Panchayat R&B Division, Mehsana
₹11,000
Yes
22 Mar 2026
22 Mar 2026
22 Mar 2026
4 Apr 2026
22 Mar 2026
Construction of Community Hall at Devpura, Ta. Vijapur, Dist. Mehsana
QUANTITY STATEMENT
It. Description of Item (with brief specification and Estimated rate
Quantity Unit Rate In Amount
No. reference to book of specifications) In words
1 Excavation for foundation upto 1.5 m depth including 159.00 Cum. 122.99 Rupees One
sorting out and stacking of useful materials and Hundred Twenty
disposing off the excavated stuff upto 50 Meter lead.(A) Two and Paise
Loose or soft soil Ninety Nine
2 Excavation for foundation for depth from 1.5 m to 3.0 m 32.00 Cum 170.40 Rupees One
including sorting out and stacking of useful materials Hundred
and disposing off the excavated stuff upto 50 Meter Seventy and
lead.(B) Dense or Hard soil Paise Forty Only
3 Filling available excavated earth excluding rock in trenches 124.20 Cum 136.92 Rupees One
plinth side of foundation etc. in layer not exceeding 20cm. Hundred Thirty
In depth consolidation each deposited layer by ramming Six and Paise
and watering. Ninety Two Only
4 Filling foundation and plinth with murrum or selected soil in 266.70 Cum 269.75 Rupees Two
layers of 20 cm. thickness includind watering, ramming and Hundred Sixty
consolidating etc. comp. Nine and Paise
5 Applying general insecticide pest control treatment to 421.50 Sqm 80.62 Rupees Eighty
floors, cupboards etc including labour material etc. and Paise Sixty
complete. Using Heptachloride 20 EC. As Per 6113_pests Two Only
Consentration Weight 0.50 percent is recommended one
litre chemical emulsion dillute with 39 liter of water will
give. Total dillute concrentration will be 40 litre inclusive of
one litre chemical emulsion appication 0.5 Litre chemical /
Sqm of surface is recommended as per I.S
6 Providing and laying cement concrete 1:2:4 (1- Cement : 2- 15.90 Cum 3587.13 Rupees Three
Coarse sand : 4- graded stone aggregates 20 mm nominal Thousand Five
size) and curing complete excluding cost of formwork in (A) Hundred Eighty
Foundation and Plinth Seven and Paise
7 Providing and laying nominal cement concrete M-200 in R. 38.40 Cum 4660.59 Rupees Four
C. C. 1:1 1/2 :3 (1 cement : 1 1/2 coarse sand : 3 graded Thousand Six
stone aggregate 20 mm. Nominal size) and curing complete Hundred Sixty
including the cost of form work but excluding the cost of and Paise Fifty
reinforcement for R.C.C. work in foundation footing base of Nine Only
column & mass concrete.
8 Providing and laying nominal cement concrete M-200 in 3.10 Cum 7415.49 Rupees Seven
R.C.C. 1:1 1/2 :3 (1 cement :1 1/2 coarse sand : 3 graded Thousand Four
stone agregate 20 mm. Nominal size) including finishing Hundred Fifteen
smooth with curing complete including the cost of form and Paise Forty
work but excluding the cost of reinforcement for R.C.C. Nine Only
work in column Upto ground level.
9 Providing & laying cement concrete 1: 3 : 6 ( 1 Cement : 3 35.60 Cum. 2870.72 Rupees Two
Coarse sand : 6 graded B.T stone aggregate 20mm Thousand Eight
nominal size) Curing comp. including cost of form work in Hundred
foundation and plinth. Seventy and
10 Providing and laying nominal cement concrete M-200 in 20.60 Cum. 8489.82 Rupees Eight
R.C.C. 1:1 1/2 :3 (1 cement :1 1/2 coarse sand : 3 graded Thousand Four
stone agregate 20 mm. Nominal size) including finishing Hundred Eighty
smooth with curing complete including the cost of form Nine and Paise
work but excluding the cost of reinforcement for R.C.C. Eighty Two Only
work in column for ground Floor
11 Providing and laying nominal cement concrete M-200 in 8.00 Cum. 6126.35 Rupees Six
R.C.C. 1:1 1/2 :3 (1 cement :1 1/2 coarse sand : 3 graded Thousand One
stone agregate 20 mm. Nominal size) including finishing Hundred Twenty
smooth with curing complete including the cost of form Six and Paise
work but excluding the cost of reinforcement for R.C.C. Thirty Five Only
work (c) PLINTH BEAM
12 Providing and laying nominal cement concrete M-200 in 39.80 Cum. 6582.40 Rupees Six
R.C.C. 1:1 1/2 :3 (1 cement :1 1/2 coarse sand : 3 graded Thousand Five
stone agregate 20 mm. Nominal size) including finishing Hundred Eighty
smooth with curing complete including the cost of form Two and Paise
work but excluding the cost of reinforcement for R.C.C. Forty Only
work for Beam Ground Floor.
13 Providing and laying nominal cement concrete M-200 in 5.70 Cum. 7494.62 Rupees Seven
R.C.C. 1:1 1/2 :3 (1 cement :1 1/2 coarse sand : 3 graded Thousand Four
stone agregate 20 mm. Nominal size) including finishing Hundred Ninety
smooth with curing complete including the cost of form Four and Paise
work but excluding the cost of reinforcement for R.C.C in Sixty Two Only
LINTELS Ground Floor.
14 Providing and laying nominal cement concrete M-200 in 7.10 Cum 6363.05 Rupees Six
R.C.C. 1:1 1/2 :3 (1 cement :1 1/2 coarse sand : 3 graded Thousand Three
stone agregate 20 mm. Nominal size) including finishing Hundred Sixty
smooth with curing complete including the cost of form Three and Paise
work but excluding the cost of reinforcement for R.C.C in Five Only
CHHAJJAS Ground Floor.
Rupees Ten Lakhs Eighty Two Thousand Nine Hundred Two and Paise Sixty One Only
I/We am/are willing to carry out the work at…% above/below percent(Should be wri en in figures and words) of the es mated
rate mentioned above. Amount of my /our tender works out as under.
Estimated amount put to tender Rs............... Estimated amount put to tender Rs...............
Signature of Contractor
Deputy Executive Engineer Executive Engineer
Panchayat R & B Sub Division Panchayat R & B Division
Vijapur Mehsana
Notes 1 - The Contractor shall exhibit a board with detailed specification and details of work as directed by the Engineer-In-Charge for
which no extra payment shall be made.
Notes 2 - The labour cess will be deducted as per prevailing rules i.e. 1% of the work done.
Notes 3 - GST and Income tax TDS will be deducted at a source while making payments of bills.
Note 4 - In all R.C.C. Items in Rate Analysis Standard Cement Consumption has been taken as per Govt. G.R.: PRC-10/2017 Cement
Consumption/16/C Date:11/05/2017 as stated in S.O.R. therefore in R.C.C. items where there is a change as per actual mix design the
cost of difference of cement consumption have been deducted from the rate of original item at the rate of input rate mentioned in all the
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
4.1.GR_to_be_attached_with_DTP_SBD_with_Index[1].pdf
9.5 MMGSY GR.pdf
5.1 Building Specifications _Booklet_.pdf
5.2 Electrical Specification Booklet.pdf
1.0 FP.pdf
4.0 SCHEDULE B.pdf
SBD Book.pdf
GR All SBD.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .