Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Tender Value
₹6.0 L
EMD Value
₹6,100
Closing Date
5 Dec 2026, 6:00 pm
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Executive Engineer, P. H. Works Division, GWSSB, Surat
Bid documents for Shifting of 250 mm DI Pipeline from Bharda Intake well to Chavda WTP under Umarpada RWSS. Ta: Umarpada, Dist. Surat. Work No. 01
368080
15 of 2026/27 Work No. 01
Open
Civil Works - Water Works
Works
Surat
8 documents required · 7 mandatory · 1 optional
₹900
Executive Engineer, P. H. Works Division, GWSSB, Surat
₹6,100
21 Nov 2026
21 Nov 2026
21 Nov 2026
5 Dec 2026
21 Nov 2026
120 days
2. Each item of Schedule-B has been divided into broad components. The Employer's
Representative shall assess the value of each component as indicated in paragraph 6 herein
3. Percentages are indicated against each component of each items specified in Schedule B, based
on the Employer's best appreciation of the value of the component as related to the total costs of
the concerned item as whole A head titled (any other item(s)) is included in each breakdown of
schedule and the tenderer shall at the time of tendering indicate any additional items which he
considers necessary but cannot be covered by any of the heads indicated in the breakup
4. The percentage breakup as indicated in the Schedule may differ from that corresponding to the
tenderer's scheme and design and he should take this into account while quoting his lump sum
prices for the items specified in Schedule-B
5. The contractor shall, after approval of his detailed designs and drawings furnish to the Employer's
Representative an initial bill of quantities to all major items, to be reviewed and updated
periodically with the Employer's Representative. This bill of quantities will be used for assessment
of percentage progress of the component at any stage By measurement jointly taken by the
Employer's Representative and the Contractor, mutually agreed and entered in the measurement
books in the form and by the method approved by the Employer's Representative and signed
jointly by both the parties.
PAYMENT SCHEDULE
GUJARAT WATER SUPPLY & SEWERAGE BOARD
PAYMENT-SCHEDULE
BREAKUPFOR INTERIM PAYMENTS
(CIVIL, MECHANICAL, INSTRUMENTATION & ELECTRICALWORKS)
Item Description of Items Percentage Payment to be
1.00 WATER TREATMENT PLANT
(I) Site survey and subsoil investigations 1.00%
Completion of field surveys and subsoil investigations 25.00%
and de-mobilization from site of survey team
Submission of surveys and soil investigation reports and 75.00%
acceptance by the Engineer.
(II) Detailed designs and construction documents 2.00%
Substantial completion, submission and approval by the 60.00%
Engineer of the designs,
drawings and construction documents for all major
Submission and approval by the Engineer of the final 40.00%
designs and construction documents for all remaining
and miscellaneous construction details and working
(III) Inlet chamber: 4.00%
Excavation 5.00%
Works up to Ground Level 10.00%
RCC works up to top including all supply and fixing of 60.00%
related materials
Finishing all surfaces including painting 15.00%
Hydraulic test 5.00%
Commissioning 5.00%
(IV) Raw water channel from inlet chamber to flash 2.00%
Excavation for supporting structure 5.00%
Works up to G.L. 15.00%
All RCC works including all supply and fixing of 30.00%
related materials up to floor level
Completion of all civil works including all supply and 35.00%
fixing of related materials
Hydraulic test 10.00%
Commissioning 5.00%
(V) Flash Mixer 4.00%
Excavation 5.00%
Works up to Ground Level 10.00%
R.C.C. works up to top including all supply and fixing 60.00%
of related materials
Finishing all surfaces including painting 15.00%
Hydraulic test 5.00%
Commissioning 5.00%
(VI) Clariflocculator Works: 20.00%
Excavation 5.00%
RCC wall up to flooring including all supply and fixing 30.00%
of related materials
RCC wall up to 1st lift (50% of the design height) 5.00%
RCC wall up to 2nd lift (100% of the design height) 10.00%
RCC wall up to top including all supply and fixing of 20.00%
related materials
Remaining all works including all supply and fixing of 15.00%
related materials
Hydraulic testing of water retaining structures 5.00%
Finishing of all surfaces and painting coating etc. 5.00%
Commissioning 5.00%
(VII) RCC Channel from Clariflocculator to Filter Bed 5.00%
RCC Works for floor slab including all supply and 40.00%
fixing of related materials
Completion of all works and finishing all surfaces 50.00%
including painting, supply and fixing of related materials
Hydraulic test 5.00%
Commissioning 5.00%
(VIII) Filtration Works 40.00%
Excavation 5.00%
RCC wall up to filter floor level including pure water 10.00%
channel floor slab
Up to operating platform 15.00%
RCC wall up to top slab including all laboratory and 30.00%
Completion of all the remaining works including back 30.00%
wash tank and related arrangements; all supply and
fixing of related materials
Hydraulic testing/liquid retaining structures 5.00%
Commissioning 5.00%
(IV) Chemical Works 15.00%
Excavation 5.00%
RCC/Masonry work below plinth 15.00%
RCC work up to 1st floor 30.00%
RCC works up to roof slab 20.00%
Completion of the remaining works including painting, 30.00%
finishing; supply and fixing of related materials
(X) Miscellaneous Works 5.00%
These works include
1 Bye pass M.S./CI pipeline from Inlet chamber to clear
2 M.S./CI pipeline from flash mixer to clariflocculator.
3 Pure water M.S./CI pipeline from filter beds to clear water
4 Bye pass M.S./CI pipeline from clariflocculator to clear
5 M.S./CI wash water pipeline from proposed wash water
tank to filter beds.
6 Wash water M.S./CI pipeline from filtration bed to Natural
(XI) All other related and required works as directed 2.00%
Submission of as built drawings and training to
GRAND TOTAL 100.00%
GRAND TOTAL 100.00%
2 GROUND (UNDERGROUND) LEVEL SERVICE
RESERVOIRS/SUMPS
a On approval of designs 2 % of Quoted rate
b On completion of excavation and base slab 18 % of Quoted rate
c On completion of vertical wall and braces 20 % of Quoted rate
d Full supporting structure including column, ring beam 15 % of Quoted rate
and completion of top slab / dome
e Plastering inside & outside with epoxy etc. complete 10 % of Quoted rate
f Procurement and fixing of inlet, outlet, washout, 15 % of Quoted rate
overflow pipes, valves, specials, chambers, lighting
arrester conductor and specials at site
g Water level indictor, painting of letters, M.S ladder, 10 % of Quoted rate
pipes, railing and all miscellaneous items such as
snowcem paint in three coats etc (Completed with all
respect) including water tightness test
h On hydraulic testing 10 % of Quoted rate
3 Elevated Storage Reservoir
a On submission of Designs 2.5% of Quoted rate
b On approval of Designs 2.5% of Quoted rate
c On Completion of excavation 5% of Quoted rate
d On completion of staging height up to reservoir 20 % of Quoted rate
e On Completion of Floor Reservoir 20 % of Quoted rate
f On Completion of walls of Reservoir 20 % of Quoted rate
g On Completion of Roof of reservoir with all related 20.0% of Quoted rate
h On hydraulic testing 10 % of Quoted rate
4 All Electro-mechanical works and Instrumentation
A Mechnical Equipment
A-1 Pump motor Assembly set Total 35% weightage(Amount)
of accepted LS KW based
A-2 Valve & Expansion bellows & Flow meter Total 10% weightage(Amount)
of accepted LS KW based
A-3 Pipes & Specials Total 5 % weightage(Amount)
of accepted LS KW based
B Electrical & Instrumentation Equipment
B-1 Transformer Total 20% weightage(Amount)
of accepted LS KW based
B-2 HV Switch Gear panels (VCB) Total 5 % weightage(Amount)
of accepted LS KW based
B-3 LV Distribution Board, MCC & APFC Panels ,Power & Total 10% weightage(Amount)
Control of accepted LS KW based
B-4 Switch yard ,Cable, Lighting & Earthing with accessories Total 5 % weightage(Amount)
of accepted LS KW based
B-5 PLC Scada Instrumentation panel system with associated Total 10% weightage(Amount)
accessories with DC battery, battery charger and of accepted LS KW based
distribution panel. quoted rate
All Mechanical-Electrical Equipment’s shall have following 3 stage of payment viz. on
completion of supply ,on completion of Erection /Installation and on Completion of testing &
commissioning as per weightage specified above.
1 On supply of equipment at site 75% of weightage (amount)
2 After Installation/Erection of equipment 15% of weightage (amount)
3 After Successful Testing & Commissioning of equipment 10% of weightage (amount)
(on completion of stipulated Trial Run)
a On receipt of materials at project site 65 % of Quoted rate
b On Excavation, Lowering, laying and jointing 20 % of Quoted rate
c On Hydraulic testing 5 % of Quoted rate
d On refilling and disposal of surplus stuff 5 % of Quoted rate
e After commissioning 5 % of Quoted rate
6 All types of Valves and Appurtenances
A On receipt of Material at Site 70.00% of Quoted rate
B On erection of valves 20.00% of Quoted rate
C On hydraulic testing 5.00% of Quoted rate
D Satisfactory running of system. 5.00% of Quoted rate
7 Valve chambers and Thrust block
A On completion works as per approved drawings 95.00% of Quoted rate
B After commission of system 5.00% of Quoted rate
8 Pump House/ Material safety room
A On approvals of Designs 2.00% of Quoted rate
B On completion of Excavation & base slab 18.00% of Quoted rate
C On completion of vertical wall up to plinth (incl. screen 20.00% of Quoted rate
D Full supporting structure incl. ring beam and top slab 15.00% of Quoted rate
E On completion of pump house incl. fixing doors Windows 10.00% of Quoted rate
F Plastering inside & outside with epoxy paint etc 10.00% of Quoted rate
(completed with all respects)
G Painting of letters, MS ladder pipe, railing, lighting arrestor 15.00% of Quoted rate
and all miscellaneous items such as snowcem paints in
three coats etc. (completed with all respects)
H After Completion 10.00% of Quoted rate
9 Compound wall
A On completion up to GL including excavation 25.00%
B On completion of wall up to 1 m 25.00%
C On completion of wall up to the desired level as per 25.00%
approved drawings
D On completion of the wall including plastering, paintings etc. 25.00%
10 Operation and Maintenance
A Every month in equal installment based on quoted prices
of O&M will be paid
Date: Signature of contractor Executive Engineer
P. H. Works Dn., G.W.S.S.B
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
1 Volume-IA Technical Bid_17.10.2026.pdf
2 Volume-IB GCC Final Line Shifting_17.10.2026.pdf
4 Vol IIB Tech Spec Civil Part-1 22.09.2026.pdf
4 Vol IIB Tech Spec Civil Part-2 23.09.2026.pdf
6 Vol_IV Drawings.pdf
Volume III Payment Schedule 22.09.2026.pdf
Volume III Price bid Preamble 22.09.2026.pdf
All Compressed GR - 1 compressed.pdf
All Compressed GR - 2 compressed.pdf
All Compressed GR - 3 compressed.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .