Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹27.1 LAccepted-Finance | L1 | Accepted-Finance L1 | |
| 2 | L2₹27.3 L+₹20,599.42 (0.76%)Accepted-Finance | L2 | Accepted-Finance L2 |
| Sl No | Description | Qty | Unit | Pragya aqua and landscape L1 | Deepak Enterprises L2 |
|---|---|---|---|---|---|
| 1.00 | The main gate will be installed and upgraded using FRP-FR with a WR matte finish to ensure strength and durability. The process will begin with clay
modeling, followed by die preparation and FRP casting to achieve the desired design and detailing. A PU protective coating will be applied as the final layer to enhance weather resistance and long-lasting performance. The lower portions of
the gate wall on both sides will be cladded with natural-looking rock boulders, engraved with lettering as directed by the EIC. In addition, the railing will be
designed in a tree-trunk style cladding, resembling real wood, with sculpted Uttarakhand birds perched on it to highlight regional character. | 19.13 | sqm | 20,915 ₹4,00,103.95 Lowest | 20,950 ₹4,00,773.5 |
| 2.00 | Making and installation of leopard with MS frame in FRP FR with WR matte, it will be made in clay first by a molding artist after which pieces will be obtained, jointed, sanded and finished together afterwards paint and PU coating to be done at last to protect it from dust debris and other external factors | 1 | Nos | 54,813 ₹54,813 Lowest | 54,940 ₹54,940 |
| 3.00 | Making and installation of bear with MS frame in FRP FR with WR matte, it will be made in clay first by a molding artist after which pieces will be obtained, jointed, sanded and finished together afterwards paint and PU coating to be done at last to protect it from dust debris and other external factors. | 1 | Nos | 54,813 ₹54,813 Lowest | 54,940 ₹54,940 |
| 4.00 | Reception/Ticket Area: installation and development of a Reception-cum-Ticket Center, designed with functionality and durability in mind. The structure will be produced using FRP FR (Fire Retardant) and WR matte to ensure strength and a refined finish. The process will begin with clay molding, followed by the preparation of the die, after which the FRP fabrication will be carried out. The final stage will include a PU coating, ensuring long-lasting durability and resistance to weather conditions. | 12.5 | sqm | 9,400 ₹1,17,500 Lowest | 9,485 ₹1,18,562.5 |
| 5.00 | Pathal Roof: Fabrication and installation of a traditional Pathal-style roof in FRP FR (Fire Retardant) with WR matte, developed to replicate the authentic texture and detailing of natural stone. The design will first be sculpted by a skilled clay artist to achieve fine traditional patterns, from which moulds will be prepared for FRP casting. The structure will be internally supported with an MS framework for strength and stability. After assembly, the surface will undergo detailed painting and finishing to create a natural stone like appearance, ensuring durability, weather resistance, and long-lasting aesthetic value. | 12.96 | sqm | 5,795 ₹75,103.2 Lowest | 5,885 ₹76,269.6 |
| 6.00 | Wooden Plank Flooring: Installation of wooden plank flooring using premium seasoned planks, securely fixed with nailing for proper alignment and stability.
The surface will be polished and finished with multiple coats of lacquer to ensure enhanced shine, durability, and long-lasting resistance against wear, moisture, and weathering. | 7.6 | sqm | 6,435 ₹48,906 Lowest | 6,490 ₹49,324 |
| 7.00 | Biodiversity Depicting Panels sign board: It will be designed and installed to
enhance and beautify the surroundings while showcasing the natural theme in
birds, butterflies and insect shapes. The panels will be developed using a sturdy
MS framework combined with precision laser cutting, vinyl UV printing, and
detailed finishing. All elements, including grouting and fixing, will be executed
with care to ensure durability, aesthetic appeal, and seamless integration with the
environment, thereby ensuring the panel features remain long-lasting and
aesthetically appealing. (size 1.45x1.45=2.10sqm) | 15 | sqm | 25,100 ₹3,76,500 Lowest | 25,150 ₹3,77,250 |
| 8.00 | Waste Material Garbage: The installation and making of waste collection units,
designed for strength, functionality, and long-lasting use. The units will be
produced using FRP FR (Fire Retardant) and WR matte to ensure durability and
ease of maintenance. The process will begin with clay molding, followed by the
preparation of the die, after which the FRP fabrication will be carried out. To
further enhance longevity and provide weather resistance, the final step will
involve a PU coating, ensuring that the waste collection units remain durable and
efficient over time. | 10 | Nos | 6,482 ₹64,820 Lowest | 6,495 ₹64,950 |
| 9.00 | Birds Café Machaan: Installation and enhancement of a Bird’s Café Machaan, envisioned as a unique space that blends functionality with natural charm. The structure will be crafted in FRP FR (Fire Retardant) and WR matte to provide both durability and fine detailing with proper MS framing structure. The process will commence with clay molding, followed by the preparation of the die, after
which the fabrication will be executed. To ensure strength, longevity, and resilience against weather conditions, the final stage will include a PU coating,
thereby enhancing the overall durability and aesthetic appeal of the Machaan and making it an attractive addition to the environment. Size:
Hut: 2.15 x 2.15 x 2.35 Base: 2.40 x 3.65 x 2.40 | 57.6 | sqm | 11,150 ₹6,42,240 Lowest | 11,270 ₹6,49,152 |
| 10.00 | Prefabricated toilet: A prefabricated toilet unit will be constructed using an MS structure for grouting and framework support. The enclosure will be fitted with
FRP-FR panels in a WR matte finish, ensuring durability and ease of maintenance. The unit will be fully equipped with all necessary accessories,
including washbasin, tap, mirror, urinal, electrical fittings, lighting, and other essential fixtures to provide complete functionality. | 11.4 | sqm | 26,210 ₹2,98,794 Lowest | 26,280 ₹2,99,592 |
Tender Value
₹27.3 L
EMD Value
₹55,000
Closing Date
10 Nov 2025, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
EE RWD ALMORA
EE RWD VIKASH BHAWAN ALMORA
Development and beautification of the eco-cultural corridor for tourists at Suryakunj Kataramal
2025_RES_88490_1
973 Dated 30-10-2025
Open Tender
Civil Works - Buildings
Item Rate
270 days
Hawalbag almora
Development and beautification of the eco-cultural corridor for tourists at Suryakunj Kataramal
3 documents required · 3 mandatory
₹2,360
EE RWD ALMORA
₹55,000
11 Nov 2025
31 Oct 2025
10 Nov 2025
31 Oct 2025
10 Nov 2025
31 Oct 2025
Amount
The main gate will be installed and upgraded using FRP-FR with a WR matte finish to ensure strength and durability. The process will begin with clay modeling, followed by die preparation and FRP casting to achieve the desired design and detailing. A PU protective coating will be applied as the final layer to enhance weather resistance and long-lasting performance. The lower portions of the gate wall on both sides will be cladded with natural-looking rock boulders, engraved with lettering as directed by the EIC. In addition, the railing will be designed in a tree-trunk style cladding, resembling real wood, with sculpted Uttarakhand birds perched on it to highlight regional character.
Making and installation of leopard with MS frame in FRP FR with WR matte, it will be made in clay first by a molding artist after which pieces will be obtained, jointed, sanded and finished together afterwards paint and PU coating to be done at last to protect it from dust debris and other external factors
Making and installation of bear with MS frame in FRP FR with WR matte, it will be made in clay first by a molding artist after which pieces will be obtained, jointed, sanded and finished together afterwards paint and PU coating to be done at last to protect it from dust debris and other external factors.
Reception/Ticket Area: installation and development of a Reception-cum-Ticket Center, designed with functionality and durability in mind. The structure will be produced using FRP FR (Fire Retardant) and WR matte to ensure strength and a refined finish. The process will begin with clay molding, followed by the preparation of the die, after which the FRP fabrication will be carried out. The final stage will include a PU coating, ensuring long-lasting durability and resistance to weather conditions.
Pathal Roof: Fabrication and installation of a traditional Pathal-style roof in FRP FR (Fire Retardant) with WR matte, developed to replicate the authentic texture and detailing of natural stone. The design will first be sculpted by a skilled clay artist to achieve fine traditional patterns, from which moulds will be prepared for FRP casting. The structure will be internally supported with an MS framework for strength and stability. After assembly, the surface will undergo detailed painting and finishing to create a natural stone like appearance, ensuring durability, weather resistance, and long-lasting aesthetic value.
Wooden Plank Flooring: Installation of wooden plank flooring using premium seasoned planks, securely fixed with nailing for proper alignment and stability. The surface will be polished and finished with multiple coats of lacquer to ensure enhanced shine, durability, and long-lasting resistance against wear, moisture, and weathering.
Biodiversity Depicting Panels sign board: It will be designed and installed to enhance and beautify the surroundings while showcasing the natural theme in birds, butterflies and insect shapes. The panels will be developed using a sturdy MS framework combined with precision laser cutting, vinyl UV printing, and detailed finishing. All elements, including grouting and fixing, will be executed with care to ensure durability, aesthetic appeal, and seamless integration with the environment, thereby ensuring the panel features remain long-lasting and aesthetically appealing. (size 1.45x1.45=2.10sqm)
Waste Material Garbage: The installation and making of waste collection units, designed for strength, functionality, and long-lasting use. The units will be produced using FRP FR (Fire Retardant) and WR matte to ensure durability and ease of maintenance. The process will begin with clay molding, followed by the preparation of the die, after which the FRP fabrication will be carried out. To further enhance longevity and provide weather resistance, the final step will involve a PU coating, ensuring that the waste collection units remain durable and efficient over time.
Birds Café Machaan: Installation and enhancement of a Bird’s Café Machaan, envisioned as a unique space that blends functionality with natural charm. The structure will be crafted in FRP FR (Fire Retardant) and WR matte to provide both durability and fine detailing with proper MS framing structure. The process will commence with clay molding, followed by the preparation of the die, after which the fabrication will be executed. To ensure strength, longevity, and resilience against weather conditions, the final stage will include a PU coating, thereby enhancing the overall durability and aesthetic appeal of the Machaan and making it an attractive addition to the environment. Size: Hut: 2.15 x 2.15 x 2.35 Base: 2.40 x 3.65 x 2.40
Prefabricated toilet: A prefabricated toilet unit will be constructed using an MS structure for grouting and framework support. The enclosure will be fitted with FRP-FR panels in a WR matte finish, ensuring durability and ease of maintenance. The unit will be fully equipped with all necessary accessories, including washbasin, tap, mirror, urinal, electrical fittings, lighting, and other essential fixtures to provide complete functionality.
FRP shed for water pond: An FRP shed will be installed over the water pond with supporting FRP pillars for stability. A 15-inch-high FRP wall will be constructed around the perimeter of the pond, along with FRP stools placed around for seating (4Nos)
Rain Shelter: A rain shelter will be constructed in FRP with a traditional Pathal-style roof featuring a three-sided cone top. The structure will include four Pahadi-style FRP pillars and three side walls designed to resemble natural stone cladding. The entire shelter will be finished with detailed coloring and a PU protective coating to ensure durability, weather resistance, and an authentic appearance.
Steel work in built up tubular (round, square or rectangular hollow tubesetc.) trusses etc., including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer, including welding and bolted withspecial shaped washers etc. complete. Hot finished welded type tubes
Deepak Enterprises (BID ID -405473)
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
finance_104990.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 5.72 MB
BOQ_104990.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .