Tender Value
₹9.7 L
EMD Value
₹9,745
Closing Date
16 Jun 2026, 6:00 pm
Chief Officer Viramgam Nagar Seva Sadan, Viramgam.
Asphalt Road Work From Rotary Circle To Post Office And Near Golvad Gate at Viramgam Nagarpalika, Viramgam.(2nd Attempt)
312043
6 of 2026
Open
Miscellaneous Works
Ahmedabad
3 documents required · 3 mandatory
₹1,062
Chief Officer, Viramgam Nagarpalika
₹9,745
6 Jun 2026
6 Jun 2026
6 Jun 2026
16 Jun 2026
6 Jun 2026
Name of Work :- Asphalt Road Work From Rotary Circle To Post Office And Near Golvad
Gate at Viramgam Nagarpalika, Viramgam.
Memorandum showing items works to be carried out :
Item QuantitiesE Item Of Work Tendered Unit Total Amount
Item QuantitiesE Item Of Work Tendered Unit Total Amount
No. stimated Rate according to
Qty. In Figure estimated
Scarifying gravelled macadam or bitumen macadam surface 6 cm to
1 2070.00 10 cm.depth including stacking useful materials on road side and 39.62 Sq.mt
disposing off remaining stuff.
Preparing surface by Brushing with wire brushes for removing
caked mud etc. sweeping with brooms and finally fanning the
cleaned surface with gunney bags to remove all loose dirt etc.(ii)
Black top surface.
Providing and laying bituminous 50.00 mm thick Bitumen
macadam with asphalt 60/70 for tack coat @ 2.5 kg/10 smt in one
or two layers considering 0.66 cum. per M.T. mix materials with
machine crused stone aggregates and Asphalt grade VG-
{60/70} for mixing @ 34.00 Kg. / M.T. i.e. 3.4% by total weight of
the mix and, including heating the aggregates and asphalt by
continuous batching of drum mix plant and spreading the same by
paver finisher and consolidation with vibratory roller 80 to 100 KN
static weight including providing all materials, equipments, tools
and plant, oil, kerosene, firewood, labour charges etc. comp. using
contractor's own machineries, drum mix plant and paver finisher
Providing & Laying 25mm thick SDBC with B.T. Aggregate as per
M.O.R.T & H specification & asphalt grade VG30 mixing @
50kg/M.T. i.e. 5.0% by weight of total mix including heating the
aggregate & asphalt in contunious batching drum mix plant and
4 96.00 spreading the same by paver finisher & consolidation with 3560.68 MT
vibratory rollar including providing all materials equipment, tools
& plants, fire wood, oil, kerosene, labour charge etc. complete using
contractor's own machinary drum mix plant & paver finisher etc.
Providing and Laying Asphalt Painting on B.T surface with bitumen
grade(VG-30) at the rate of 5.00 kg/10 sqm by mechanical spreyer
5 2070.00 and spreading the stone dust on prepared surface at the rate of 0.03 30.55 Sq.Mt
cum/10 sqm and rolling with smooth wheeled and penumatic roller
and brushing etc.complete
Raising of I.C. Chamber av 0.180 mtrs Height with Brick Masonary
in C.M 1:6 at top including cost of excavation refiting of frame &
cover in C.C. 1:2:4, Plastring in C.M 1:3 curring % Disposal of
Dismentaling Material from site etc. Completed incl. all carting and
providing of materials which is required for the purpose (except
frame and Cover)
Renovation of manhole by increasing the height at top including
cost of excavation, refitting of C. I. manhole frame and cover curing
etc. complete incl. all carting and providing of materials which is
7 8.00 required for the purpose (except manhole frame and cover) For all 3407.74 Nos
type manhole by providing RCC 1:2:4 Partition walls with required
reinforcement 25 cm thick and circular opening with 500mm clear
dia and 0.40 mt. av.
TOTAL NET AMOUNT
Estimated amount Estimated amount
Put to tender Rs …974503.41 Put to tender Rs…974503.41
Deduct .............% below Rs………… Add............% above Rs……………
Total Rs………… Total Rs……………
(*Please strike out whichever is not applicable).
Note : 1 All work shall be carried out as per Public Works Department Handbook and other specifications of Division or as
GM\Wv! AW]\ H SFD AF\WSFD lJEFUGL 5]l:TSF VG[ l0JLhGGL ALHL BF; lJUT D]HA VYJF ;}RGF 5|DF6[ SZL VF5JFG]\ ZC[X[P
Note : 2 All the columns is Schedule should be filled in ink and the total of the entries in the last column should be struck by the
contractor under this signature.
GM\W o Z VG];}lRDF\ AWF BFGFGL lJUTM ;CLYL EZJL VG[ K[<,F BFGFGL GM\WMGM ;ZJF/M SZL SMg8=FS8Z[ 5MTFGL ;CL SZJLP
Note : 3 Rates quoted include clearance of site (prior commencement of work and at its close) in all respects and hold good for
work under all conditions, site, moisture, weather etc.
GM\Wv# o 8F\S[,F NZDF\4 :Y/GL sSFDGF VFZ\E[ VG[ 5}~ YFI T[ JBT[fNZ[S ZLT[ ;FO;}OL SZJFGM\ ;DFJ[X YFI K[4 VG[ T[ NZ TDFD 5lZl:YlT4 :Y/4 E[H4 CJFDFG JU[Z[
C[9/ SFD VD,DF\ ZC[X[P
Note : 4 To be continued on additional sheets, if found necessary.
GM\Wv$ o H~Z H6FI JWFZFGF SFU/M HM0L RF,]\ ZFBJ]\P
Viramgam Nagarpalika
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
1 Standard Bidding Document.pdf
2 .SCHEDUAL-B.pdf
3. General Nots condictions C.C Road W.D.pdf
4.General Techinacal Specification.pdf
5.BUILDINGSPECIFICATIONSBOOK.pdf
5.Standards for Cement Con. Dt.11-5-2017.pdf
6.Testing Schedule Dt.24-10-1994.pdf
7.DETAILED TECHNICAL SPECIFICATION.pdf
TENDER SARTO.pdf
Download all tender documents and submit your bid