Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | lakshmi engineering & trade services L1₹6.6 L | L1 | - | |
| 2 | L2₹7 L+₹43,750 (6.67%)Qualified 8 A I R LANE NEAR COMMUNITY HALL DELANIPUR PORT BLAIR SOUTH ANDAMAN ANDAMAN NICOBAR 744102 | SOUTH ANDAMANS | ANDAMAN AND NICOBAR ISLANDS | 744102 | L2 | Qualified MSE, Category: OBC | |
| 3 | L3₹7.2 L+₹65,625 (10.0%)Qualified | L3 | Qualified MSE, Category: General | |
| 4 | L4₹8.5 L+₹2.0 L (30.0%)Qualified | L4 | Qualified MSE, Category: General | |
| 5 | L5₹9.2 L+₹2.6 L (40.0%)Qualified SEA SHORE ROAD HADDO HADDO SOUTH ANDAMAN ANDAMAN NICOBAR 744102 | SOUTH ANDAMANS | ANDAMAN AND NICOBAR ISLANDS | 744102 | L5 | Qualified MSE, Category: General |
Tender Value
Refer Docs
EMD Value
Exempted
Closing Date
17 Apr 2025, 9:00 amClosed
Repair
Maintenance
and Installation of Plant Systems/Equipments (Version 2) - ICGS C-416; L 095 WJ STBD exhausts blower motor getting tripped instantly after switching ON Suspect motor winding short circuited and bearing worn out Defect to be rect..
Repair
Maintenance
and Installation of Plant/Systems/Equipments (Version 2) - ICGS C-416; L 096 Hanging support of WJ port blower found deteriorated Same to be repaired and system to be proved Mat MS; Service Provider
Repair
Maintenance
and Installation of Plant/Systems/Equipments (Version 2) - ICGS C-416; E 123 ER Ventilation water drain trey deteriorated Same to be renewed fabricated as per sample Mat SS Qty 04 Nos Length 2 Meter Breadth 2 Meter; Service Prov..
Repair
Maintenance
and Installation of Plant Systems/Equipments (Version 2) - ICGS C-416; E 124 Wire- Mess gratings of ER ventilation are deteriorated Same to be renewed fabricated as per sample Mat MS Qty 04 Nos L-2 meter B-2 Meter; Service Provid..
Repair
Maintenance
and Installation of Plant/Systems/Equipments (Version 2) - ICGS C-416; E 125 Main engine exhaust Blower trunking at engine room found crack in various place due to thin down of exhaust trunking plate Exhaust blower trunking to ..
Repair
Maintenance
and Installation of Plant Systems/Equipments (Version 2) - ICGS C-416; L 097 PME dynamo was unable to provide charging voltage to the starting batteries suspected charging coil of dynamo defective Defect to be rectified and prov..
Repair
Maintenance
and Installation of Plant/Systems/Equipments (Version 2) - ICGS C-416; E 126 Chequered plates carpet area approx-12 mtrs in engine room and water Jet are highly rusted deteriorated All plates along with supporting base frame riv..
Repair
Maintenance
and Installation of Plant Systems/Equipments (Version 2) - ICGS C-416; L 098 10 in nos Bunk light at Officer SO Jr Sailor cabin found defective Bunk light to be repaired and system to be proved; Service Provider
7730467
GEM/2025/B/6131885
Two Packet Bid
Repair
South Andamans, Andaman And Nicobar Islands
Total value wise evaluation
SERVICE
4 documents required · 4 mandatory
3 yrs
₹3
Exempted
10 Apr 2025
10 Apr 2025
17 Apr 2025
and Installation of Plant Systems/Equipments (Version 2) - ICGS C-416; L 095 WJ STBD exhausts blower motor getting tripped instantly after switching ON Suspect motor winding short circuited and bearing worn out Defect to be rect..
and Installation of Plant/Systems/Equipments (Version 2) - ICGS C-416; L 096 Hanging support of WJ port blower found deteriorated Same to be repaired and system to be proved Mat MS; Service Provider
and Installation of Plant/Systems/Equipments (Version 2) - ICGS C-416; E 123 ER Ventilation water drain trey deteriorated Same to be renewed fabricated as per sample Mat SS Qty 04 Nos Length 2 Meter Breadth 2 Meter; Service Prov..
and Installation of Plant Systems/Equipments (Version 2) - ICGS C-416; E 124 Wire- Mess gratings of ER ventilation are deteriorated Same to be renewed fabricated as per sample Mat MS Qty 04 Nos L-2 meter B-2 Meter; Service Provid..
and Installation of Plant/Systems/Equipments (Version 2) - ICGS C-416; E 125 Main engine exhaust Blower trunking at engine room found crack in various place due to thin down of exhaust trunking plate Exhaust blower trunking to ..
and Installation of Plant Systems/Equipments (Version 2) - ICGS C-416; L 097 PME dynamo was unable to provide charging voltage to the starting batteries suspected charging coil of dynamo defective Defect to be rectified and prov..
and Installation of Plant/Systems/Equipments (Version 2) - ICGS C-416; E 126 Chequered plates carpet area approx-12 mtrs in engine room and water Jet are highly rusted deteriorated All plates along with supporting base frame riv..
and Installation of Plant Systems/Equipments (Version 2) - ICGS C-416; L 098 10 in nos Bunk light at Officer SO Jr Sailor cabin found defective Bunk light to be repaired and system to be proved; Service Provider
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
bid_7730467.pdf
GEM_BID
1744286816.pdf
OTHER
1744287254.pdf
OTHER
ATC_58944387-821c-4978-92021744287317462_DTO14.pdf
OTHER
list-of-categories-where-trials-are-allowed_1712126171.pdf
OTHER
gtc.pdf
OTHER
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .