Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
Tender Value
₹17.8 L
EMD Value
₹35,640
Closing Date
25 Oct 2022, 4:00 pmClosed
EE II, WRD, Rawanfond Goa
Aquem Baixo Rawanfond Goa
Upgradation of Lift Irrigation Scheme at Karmane (East) in Dharbandora Taluka. (4th Call)
2022_WRD_5364_1
WDII/TECH/F17/3e/2022-23/SrNo1
Open Tender
Miscellaneous Works
Item Rate
60 days
Rawanfond Salcete Goa
Please refer Tender documents.
3 documents required · 3 mandatory
₹3,000
₹35,640
28 Oct 2022
10 Oct 2022
26 Oct 2022
10 Oct 2022
25 Oct 2022
10 Oct 2022
Amount
Supply of Kirloskar make Horizontal end suction pump Capacity: 45Kw/60HP/III Phase, with Motor with Gland packing Flow: 120 LPS @ 25 Meter Head material of Construction: (Casting/casing cover/diffusers/inserts+impeller+wear rings (casing/Impeller)+Shaft+Shaft Sleeve-02-C1+BR+BR+40 C 8+SS 410. with Accesories (ISI make)
Installation, commissioning and testing of Pump along with accessories like suitable starter 4ML, main switch, capacitor etc (ISI make)
Supply of new control panel for 60HP pumps with all safety incomer main MCCB, Volt Meter, Ammeter single phasing Bushbar etc (ISI make).
Dismentling of existing 40HP motor / Pump along with the concrete base and foundation and also dismentling from the existing suction and delivery pipe line with gas cutting including electrical panel board etc as directed by the Engineer in Charge.
CK CONSTRUCTION
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .