| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹17.0 LAccepted-Finance | ₹17.0 L | 1 | Accepted-Finance L1 |
| 2 | 2₹17.3 L+₹36,755.68 (2.17%)Rejected-Finance | ₹17.3 L+₹36,755.68 (2.17%) | 2 | Rejected-Finance L2 |
| 3 | 3₹18.2 L+₹1.3 L (7.43%)Rejected-Finance | ₹18.2 L+₹1.3 L (7.43%) | 3 | Rejected-Finance L3 |
| 4 | 4₹20.0 L+₹3.0 L (17.6%)Rejected-Finance ANDHRA POWER HOUSE DIVISION HPSEBL CHIRGAON 171208 | SHIMLA | HIMACHAL PRADESH | 171208 | ₹20.0 L+₹3.0 L (17.6%) | 4 | Rejected-Finance L4 |
| 5 | 5₹22.0 L+₹5.0 L (29.7%)Rejected-Finance | ₹22.0 L+₹5.0 L (29.7%) | 5 | Rejected-Finance L6 |
| Sl No | Description | Qty | Unit | Suman Kumar Chandel L5 | Rajesh Kumar L4 | kuiper tech private limited L3 | Rajni kumari L6 | VIKASH L1 | Shesh Raj Cont L2 |
|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Excavation in foundation trenches etc. in all kinds of soil such as pick work,jumper work blasting work in soft or hard rook or by cum chiselling soft/ hard rock where blasting is prchibited in all leads and lif-ts including trimming and dewatering where ever required dressing of sides and bed stacking the excavated soil clear from the edge of excavaton and then returning the excavated soil after completion of work in 15cm layers when required into plinths, side of foundation etc. Consolidating each deposited layers by remming and watering and then disposing of all surplus excavated soil complete in all respect as per direction and to the entire satisfaction of the Engineer-in-charge in all leads and lilfts. | 57.83 | P/Cum | 500 ₹28,915 | 400 ₹23,132 | 350 ₹20,240.5 | 500 ₹28,915 | 200 ₹11,566 Lowest | 280 ₹16,192.4 |
| 2.00 | Providing and laying cement concrete 1:4:8(1cement:4sand:8 graded crushed stone aggregate 40mm nominal size) and curing complete excluding cost of form work in foundation and plinth including carriage of materials in all leads and lifts. | 28.79 | P/Cum | 6,720 ₹1,93,468.8 | 6,400 ₹1,84,256 | 5,000 ₹1,43,950 | 7,000 ₹2,01,530 | 4,750 ₹1,36,752.5 Lowest | 5,800 ₹1,66,982 |
| 3.00Providing and laying cement concrete work 1:1½:3(1cement:1½sand: 3 crushed stone aggregate 20mm nominal size & curing complete excluding the cost of form work and reinforcement for reinforced concrete work in following items including carriage of material in all leads & lifts. | |||||||||
| 3.01 | Foundation footing, bases of columns etc. | 35.4 | P/Cum | 9,900 ₹3,50,460 | 9,500 ₹3,36,300 | 8,300 ₹2,93,820 | 12,000 ₹4,24,800 | 7,200 ₹2,54,880 Lowest | 7,600 ₹2,69,040 |
| 3.02 | Column, pillars, posts and struts upto floor two level | 7.56 | P/Cum | 11,500 ₹86,940 | 11,000 ₹83,160 | 8,300 ₹62,748 | 12,000 ₹90,720 | 9,550 ₹72,198 | 7,598.4 ₹57,443.9 Lowest |
| 3.03 | suspended floors,roofs,landing shelve and their supports balconies beams,girders bressumers and centilevers upto floor two level | 36.53 | P/Cum | 10,300 ₹3,76,259 | 9,600 ₹3,50,688 | 8,300 ₹3,03,199 | 12,000 ₹4,38,360 | 8,800 ₹3,21,464 | 7,580 ₹2,76,897.4 Lowest |
| 4.00Providing form work with steel plates 3.15 mm thick welded with angle iron in frame 30x30x5mm so as to give a fair finish including centring, shuttering, strutting and propping etc. with wooden battens and ballies, height of propping and centring blow supporting floor to ceiling not exceeding 4 mtrs. and removal of the same for insitu-reinforced concrete & plain concrete work in following item including carriage of material in all leads & lifts.. | |||||||||
| 4.01 | Foundation, footings basis of columns etc. and mass concrete. | 146.84 | P/Sqm | 320 ₹46,988.8 | 250 ₹36,710 | 250 ₹36,710 | 600 ₹88,104 | 140 ₹20,557.6 Lowest | 253 ₹37,150.52 |
| 4.02 | flat surface such as soffits of suspended floors, roofs, landings and like floors etc. upto 200mm in thickness | 170.93 | P/Sqm | 610 ₹1,04,267.3 | 450 ₹76,918.5 | 450 ₹76,918.5 | 600 ₹1,02,558 | 410 ₹70,081.3 | 351 ₹59,996.43 Lowest |
| 4.03 | Beams, cantilever, girders and lintels. | 135.64 | P/Sqm | 630 ₹85,453.2 | 500 ₹67,820 | 510 ₹69,176.4 | 600 ₹81,384 | 410 ₹55,612.4 | 350 ₹47,474 Lowest |
Tender Value
Refer Docs
EMD Value
₹43,000
Closing Date
11 Aug 2026, 11:00 amClosed
Executive Engineer Jal Shakti Division Ghumarwin
Executive Engineer Jal Shakti Division Ghumarwin
Construction of farmers interaction center for Animal Husbandry at Bharari in tehsil Bharari Distt. Bilaspur HP
2026_HPIPH_140445_1
GMR-BLP02-737(5196-5245)farmer
Open Tender
Civil Works
Item Rate
90 days
Bharari
Please refer Tender documents.
7 documents required · 7 mandatory
₹500
₹43,000
17 Sept 2026
3 Aug 2026
11 Aug 2026
3 Aug 2026
11 Aug 2026
3 Aug 2026
3 Aug 2026 - 11 Aug 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Excavation in foundation trenches etc. in all kinds of soil such as pick work,jumper work blasting work in soft or hard rook or by cum chiselling soft/ hard rock where blasting is prchibited in all leads and lif-ts including trimming and dewatering where ever required dressing of sides and bed stacking the excavated soil clear from the edge of excavaton and then returning the excavated soil after completion of work in 15cm layers when required into plinths, side of foundation etc. Consolidating each deposited layers by remming and watering and then disposing of all surplus excavated soil complete in all respect as per direction and to the entire satisfaction of the Engineer-in-charge in all leads and lilfts. | 57.83 | P/Cum | - | - |
| 2 | Providing and laying cement concrete 1:4:8(1cement:4sand:8 graded crushed stone aggregate 40mm nominal size) and curing complete excluding cost of form work in foundation and plinth including carriage of materials in all leads and lifts. | 28.79 | P/Cum | - | - |
| 3Providing and laying cement concrete work 1:1½:3(1cement:1½sand: 3 crushed stone aggregate 20mm nominal size & curing complete excluding the cost of form work and reinforcement for reinforced concrete work in following items including carriage of material in all leads & lifts. | |||||
| 3.01 | Foundation footing, bases of columns etc. | 35.4 | P/Cum | - | - |
| 3.02 | Column, pillars, posts and struts upto floor two level | 7.56 | P/Cum | - | - |
| 3.03 | suspended floors,roofs,landing shelve and their supports balconies beams,girders bressumers and centilevers upto floor two level | 36.53 | P/Cum | - | - |
| 4Providing form work with steel plates 3.15 mm thick welded with angle iron in frame 30x30x5mm so as to give a fair finish including centring, shuttering, strutting and propping etc. with wooden battens and ballies, height of propping and centring blow supporting floor to ceiling not exceeding 4 mtrs. and removal of the same for insitu-reinforced concrete & plain concrete work in following item including carriage of material in all leads & lifts.. | |||||
| 4.01 | Foundation, footings basis of columns etc. and mass concrete. | 146.84 | P/Sqm | - | - |
| 4.02 | flat surface such as soffits of suspended floors, roofs, landings and like floors etc. upto 200mm in thickness | 170.93 | P/Sqm | - | - |
| 4.03 | Beams, cantilever, girders and lintels. | 135.64 | P/Sqm | - | - |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.46 MB
BOQ_208316.xls
BOQ • 0.27 MB
PWD6NEW.pdf
Tender Documents • 0.31 MB
PWD8NEW.pdf
Tender Documents • 1.47 MB
condt.pdf
Additional Documents • 0.33 MB
140445.pdf
PDF • 0.26 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .