Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.2 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹2.3 L+₹5,077.08 (2.30%)Rejected-Finance | L2 | Rejected-Finance L2 |
| Sl No | Description | Qty | Unit | AJITH KUMAR M L2 | SANTHOSHKUMAR V V L1 |
|---|---|---|---|---|---|
| 1.00Toilet construction | |||||
| 1.00 | 2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil | 3.51 | cum | 301.62 ₹1,058.69 | 294.86 ₹1,034.96 Lowest |
| 1.00 | 2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil | 10.8 | cum | 216.02 ₹2,333.02 | 211.17 ₹2,280.64 Lowest |
| 1.00 | OD15331/2025-2026:od1336470/2021_2022 :Laterate masonry with neatly dressed laterate stone of size 35x20x20 cm or nearest
size in cement mortar 1:6 for foundation and basement including all cost of materials, labour charges etc.
(Modified 50.6.7.1) | 10.5 | cum | 5,130.9 ₹53,874.45 | 5,015.77 ₹52,665.59 Lowest |
| 1.00 | OD15333/2025-2026:od1336471/2021_2022 :Laterite neatly dressed stones of size 35x20x20 cm or nearezt size in cement mortar
1:6 for superstructure above plinth level up to floor two level including cost of materials labour charges etc.
complete. (Modified 50.6.7.2 | 5.4 | cum | 5,870.79 ₹31,725.75 | 5,739.05 ₹31,013.83 Lowest |
| 1.00 | 2.25:Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundation etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m. | 1.34 | cum | 267.03 ₹358.89 | 261.04 ₹350.84 Lowest |
| 1.01 | 5.1.2:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size | 0.54 | cum | 8,794.65 ₹4,749.11 | 8,597.31 ₹4,642.55 Lowest |
| 1.01 | 5.3:Reinforced cement concrete work in beams, suspended floors, roofs, having slope up to 150 landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases up to floor five level excluding the cost of centering, shuttering, finishing and reinforcement, with1:1.5:3 (1 cement : 1.5 coarse sand (Zone III) : 3 graded stone aggregate 20 mm nominal size). | 1.37 | cum | 11,271 ₹15,418.73 | 11,018.09 ₹15,072.75 Lowest |
| 1.01 | 5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more | 147.24 | kilogram | 94.26 ₹13,878.84 | 92.15 ₹13,568.17 Lowest |
| 1.01 | 5.9.3:Centering and shuttering including strutting, etc. and removal of form for:Suspended floors, roofs, landings, balconies and access platform | 7.74 | sqm | 805.98 ₹6,238.29 | 787.9 ₹6,098.35 Lowest |
Tender Value
₹2.5 L
EMD Value
₹6,347
Closing Date
16 Aug 2025, 6:00 pmClosed
ASSISTANT ENGINEER
Office of Assistant Engineer LSGD Section Pullur Periya GP
PROJECT NO 191/25-26-CONSTRUCTION OF TOILET AT HARIPURAM AYURVEDA HOSPITAL IN PULLUR PERIYA GP
2025_LSGD_783064_15
AE/LIDEW/PP/02/25-26
Open Tender
Civil Works - Buildings
Item Rate
180 days
PULLUR PERIYA
Please refer tender documents
7 documents required · 7 mandatory
₹560
Yes
₹6,347
Yes
28 Oct 2025
7 Aug 2025
18 Aug 2025
7 Aug 2025
16 Aug 2025
7 Aug 2025
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1285850.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .