| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.3 CrAdmitted-Finance 16 12A SWAMIJI ROAD NEAR SABUJ SANGHA KOLKATA WEST BENGAL 700060 | KOLKATA | WEST BENGAL | 700060 | ₹1.3 Cr | L1 | Admitted-Finance |
| 2 | L2₹1.4 Cr+₹6.3 L (4.81%)Admitted-Finance 17 6 FLAT NO 06 SAROJ MANSION BUILDING 6TH STREET NANDANAM EXTENSION NANDANAM CHENNAI TAMIL NADU 600035 | CHENNAI | TAMIL NADU | 600035 | ₹1.4 Cr+₹6.3 L (4.81%) | L2 | Admitted-Finance |
| 3 | Rejected-Technical 2239 1ST FLOOR GARIA STATION RD KALITALA VILLAGE TOWN GARIA CITY KOLKATA KOLKOTA WEST BENGAL 700084 INDIA | 24 PARAGANAS SOUTH | WEST BENGAL | 700084 | - | - | Rejected-Technical Disqualified after TEC evaluation |
| Sl No | Description | Qty | Unit | TECHNO ENGINEERING L1 | Brothers Engineering And Erectors Limited L2 |
|---|---|---|---|---|---|
| 1.00 | Overhauling of Boiler Drum for ABL
Boiler | 1 | Lot | - | - |
| 2.00 | Scaffolding & cleaning of FSH, PLSH
RPOB Panel. | 1 | Lot | - | - |
| 3.00 | Insertion of tube for FSH, PLSH, RPOB
Panel, per joint | 850 | Number | - | - |
| 4.00 | Replacement of RPOB support loop | 2 | pieces | - | - |
| 5.00 | Cleaning & inspection of PSH, PRH
Cage Front & Baffle Wall tubes | 1 | LOT | - | - |
| 6.00 | Lifting & refitting of PSH coil | 25 | Coils | - | - |
| 7.00 | Lifting & refitting of PRH coil | 40 | Coils | - | - |
| 8.00 | Fabrication of PSH/PRH bends, loop etc | 30 | Pieces | - | - |
| 9.00 | PRH/PSH Inlet Header Stub Joint
Rectification/Replacement, per joint | 3 | Number | - | - |
| 10.00 | Insertion of PSH/PRH, cage Wall,
Baffle wall tube, per joint | 350 | Number | - | - |
Tender Value
₹1.3 Cr
EMD Value
₹2.6 L
Closing Date
16 Nov 2019, 4:00 pmClosed
General Manager (KTPS)
GM bldg,KTPS,Mecheda,Purba Medinipur 721137
Overhauling of Boiler Pressure parts of Boiler of Unit 4 during overhauling.
2019_WBPDC_249057_1
GMOH-4(K)/CC/BM/3209
Open Tender
Support/Maintenance Service
Item Rate
45 days
KTPS, Mecheda, Purba Medinipur 721137
Please refer Tender documents.
4 documents required · 4 mandatory
₹5,000
The West Bengal Power Development Corporation Ltd.
₹2.6 L
Yes
Conference Hall,GM bldg,KTPS,Mecheda
5 Feb 2020
21 Oct 2019
20 Nov 2019
21 Oct 2019
16 Nov 2019
30 Oct 2019
28 Oct 2019
Amount
Overhauling of Boiler Drum for ABL Boiler
Scaffolding & cleaning of FSH, PLSH RPOB Panel.
Insertion of tube for FSH, PLSH, RPOB Panel, per joint
Replacement of RPOB support loop
Cleaning & inspection of PSH, PRH Cage Front & Baffle Wall tubes
Lifting & refitting of PSH coil
Lifting & refitting of PRH coil
Fabrication of PSH/PRH bends, loop etc
PRH/PSH Inlet Header Stub Joint Rectification/Replacement, per joint
Insertion of PSH/PRH, cage Wall, Baffle wall tube, per joint
Fabrication & erection of guard tube guard plate for PSH, PRH, Cage wall, Baffle wall
Erection of guard tube & guard plate for PSH, PRH, Cage wall, Baffle wall
Cleaning & resetting of slings of Q-3 & S-5 header
Repairing of cage casing- side, front & rear wall
Cleaning of boiler pr parts-Furnace, FSH & PLSH by HP water jet
Fabrication of FSH, PLSH & RPOB bends, loops etc.
Shortening of support lugs of PSH/PRH coils
Scaffolding & cleaning of Economiser Zone
Repairing of Economiser Hopper
Lifting of Economiser coil & refitting after repairing
Insertion of Economiser tube, per joint
Economiser side wall bolt-up with channel
Fabrication of Economiser bends, loop etc.
Economiser Inlet Header Stub Joint Rectification/Replacement, per joint
Fabrication & Fitting of guard tubes & guard plates for Economiser
Fitting of guard tube & guard plate for economiser
Scaffolding & cleaning of Furnace Zone
Insertion of furnace & division wall Tubes, per joint
Fabrication of furnace wall & division wall bends
Cutting, welding of inspection nipples of different headers
Deposition of weld metal on tubes/ stubs/ headers etc
Stress Relieving for Pressure Welding Joint
Welding of fins for boiler tubes
Servicing of Manholes & peep holes
Cleaning & Inspection of Pent House
Repairing of Pent House
Cleaning & resetting sling at Pent house
Reheater Leakage Test
Replacement of trough seal Dipper plates
D-Metering of pressure parts
Radiography of pressure welding joint
Overhauling & trivy test of Safety Valve for Boiler Drum & SH.
Overhauling of Safety valve for BAS
Replacement of HP Valve Size- upto 2" (50mm)
Replacement of HP Valve Sizeabove 2"(50mm) to 4"(102mm
Replacement of HP Valve upto Sizeabove 4"(102mm) to 8"(200mm)
Additional Support Fitting at RPOB panel
Hiring of Crane with Operator and fuel
Sealing at Top of Bottom Ash Hopper by wooden planks, GI sheet & Gunny bags
Support fitting at pendent reheater (pent house)
Man power assistance(4 nos of workmen) to M/S ABC service Engineer for checking & inspection of hanger & support of Boiler #4 as per requirement.
Scaffolding work(06 nos of workmen) for checking & inspection of hanger & support of Boiler # 4 and removal after completion of work.
Assistance for RLA work (Hot job,
Brothers Engineering And Erectors Limited
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.76 MB
BOQ_453618.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .