Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹14.4 LAdmitted-Fee/PreQual/Technical/Finance | -20.00% | ₹14.4 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹14.9 L+₹52,050.43 (3.61%)Admitted-Fee/PreQual/Technical/Finance | -17.11% | ₹14.9 L+₹52,050.43 (3.61%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L3₹18.0 L+₹3.6 L (24.9%)Admitted-Fee/PreQual/Technical/Finance | -0.10% | ₹18.0 L+₹3.6 L (24.9%) | L3 | Admitted-Fee/PreQual/Technical/Finance |
| 4 | L4₹18.0 L+₹3.6 L (25.0%)Admitted-Fee/PreQual/Technical/Finance | -0.01% | ₹18.0 L+₹3.6 L (25.0%) | L4 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹18 L
EMD Value
₹36,000
Closing Date
17 Aug 2026, 4:00 pmClosed
Executive Engineer
FBI Division Tangmarg
Chukar Khul-Construction of Cement Concrete wall of and its trifurcation near high school chuker for neesu dara, gam khul, dundara khul
2026_IFC_319369_2
Enit no 09 of 2026-27 of FBI Division Tangmarg
Open Tender
Civil Works
Percentage
30 days
Tangmarg
As per nit
3 documents required · 3 mandatory
₹800
Yes
Executive Engineer FBI Division Tangmarg
₹36,000
Yes
20 Aug 2026
4 Aug 2026
18 Aug 2026
4 Aug 2026
17 Aug 2026
5 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in bulk excavation by mechanical means (hydraulic excavator) over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge.
All kinds of soil : | 239.29 | Cum | 187.3 | ₹44,819.02 |
| 2 | Dumping stone including cost of stones.
in Horizontal on level | 55.45 | Cum | 937.9 | ₹52,006.56 |
| 3 | Providing and laying in position specified grade of reinforced cement concrete including curing but excluding the cost of centering, shuttering, finishing and reinforcement. All works upto plinth level 1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) . | 34.31 | Cum | 5,202.9 | ₹1,78,511.5 |
| 4 | Providing and laying in position specified grade of reinforced cement concrete including curing but excluding the cost of centering, shuttering, finishing and reinforcement. All works upto plinth level
1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size. | 34.72 | Cum | 7,104.35 | ₹2,46,663.03 |
| 5 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with:
1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) | 77.28 | Cum | 6,591.25 | ₹5,09,371.8 |
| 6 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. Mild steel and medium tensile steel bars. Thermo-Mechanically Treated bars of grade Fe-500D or more. | 2,430.54 | kg | 123.2 | ₹2,99,442.53 |
| 7 | Centering and shuttering including strutting, propping etc. and removal of form work for: Foundations, footings, bases for columns 4.6.2 Retaining walls, return walls, walls (any thickness) including attached pilasters buttresses, plinth and string course fillets, kerbs andsteps etc. | 514.02 | sqm | 628.95 | ₹3,23,292.88 |
| 7.01 | Centering and shuttering including strutting, propping etc. and removal of form for Foundations, footings, bases of columns etc. for mass concrete. | 36.72 | sqm | 286.35 | ₹10,514.77 |
| 8 | Carriage of Materials by Mechanical Transport
40 mm Aggregate (average lead 10km) | 30.88 | Cum | 303.34 | ₹9,367.14 |
| 8.01 | 20 mm Aggregate (average lead 10 km) | 95.4 | Cum | 279.04 | ₹26,620.42 |
stage.html
html • 0.02 MB
finance_1057664.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.81 MB
BOQ_1057664.xls
BOQ • 0.29 MB
CorriII.pdf
PDF • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .