Loading…
Loading…
Tender Value
₹14.2 L
EMD Value
₹15,000
Closing Date
12 Oct 2026, 6:00 pm
Executive Engineer
Consultancy Services for Design of Structures, Detailed Estimate and Preparation of Drawings take necessary approval for structures of Karjan Right Bank Main Canal & its Distributories Under the Jurisdiction of IPSD-29, Rajpipla
349110
22 of 202627
Open
Civil - All
Works
Narmada
9 documents required · 9 mandatory
₹900
Executive Engineer, Irrigation Project Division 4, Rajpipla
₹15,000
28 Sept 2026
28 Sept 2026
28 Sept 2026
12 Oct 2026
28 Sept 2026
1. The bill of Quantities shall be read in conjunction with the Instructions to Bidder,
Conditions of Contract, Technical Specifications and Drawings.
2. The quantities given in the Bill of Quantities are estimated and provisional, and
are given to provide a common basis for bidding. The basis of payment will be the
actual quantities of work ordered and carried out, as measured by the Contractor
and verified by the Engineer and valued at the rates and prices tendered in the
priced Bill of Quantities, where applicable, and otherwise at such rates and prices
as the Engineer may fix within the terms of the Contract.
3. The rates and prices tendered in the priced Bill of Quantities shall, except in so far
as it is otherwise provided under the Contract, include all constructional plant,
layout, supervision, materials, erection, maintenance, insurance, profit, taxes and
duties, together with all general risks, liabilities and obligations set out or implied
in the Contract.
4. The rates and prices shall be quoted entirely in Indian Currency.
5. A rate or prices shall be entered against each item in the Bill Quantities, whether
quantities are stated or not. The cost of Items against which Contractor has failed
to enter a rate or price shall be deemed to be covered by other rates and prices
entered in the Bill of Quantities (in case of Item rate contract).
6. The whole cost of complying with the provisions of the Contract shall be included
in the items provided in the priced Bill of Quantities, and where no Items are
provided the cost shall be deemed to be distributed among the rates and prices
entered for the related items of Work.
7. General direction and descriptions of work and materials are not necessarily
repeated or summarized in the Bill of Quantities. References to the relevant
sections of the contract documentation shall be made before entering rates or
prices against each item in the Bill of Quantities.
8. The method of completed work of payment shall be in accordance with the
specification for Road and Bridge works. For building works specifications for
building are to be followed.
9. Errors will be corrected by the Employer for any arithmetic errors pursuant to
Clause-29 of the Instructions to Bidder.
10. Rock is defined as all materials which, in the opinion of the Engineer, required
blasting, or the use of metal wedges and sledgehammers, or the use of
compressed air drilling for its removal, and which cannot be extracted by ripping
with a tractor of at least 150 kw with a single rear mounted heavy duty ripper.
BILLOFQUANTITIES
(A) PercentageRateTender(UptoINR50Cr.)
Item Description of Item(with brief Qua Unit RateIn Amount
No specification and reference to book of ntity figures
specifications)
Drilling 100 mm dia. bore hole in all types of
soil strata by machine drilling method
collecting undisturbed/disturbed soil samples
and performing SPT test, maximum up to
Mt. depth on ground surface including 120 3300 Rmt.
mobilization, conveyance, loading and
boarding, computation of SBC reporting
charges etc. complete. Including submission of
Soft Copy and 02 hard copy of result
Collecting, Sampling and Testing (in
Duplicate) in Soil, Soft Murrum, Hard
Murrum, Soft Rock and Hard Rock
including ascertaining Soil Bearing Capacity
/ Allowable bearing pressure and Silt
Factor including trial pit, transportation of
samples form Check dam/Causeway/ Any
irrigation Structure Site in Vadodara
district to Govt. Laboratory or Govt.
Approved Laboratory Etc Complete with
Submission of Soft Copy and 02 Hard Copy of
Preparing Hydraulics And Structure Design
,Drawing as per relevant codal provisions
And Preparing Estimate of Canal Escape,
Box V.R.B, Box Culvert, Canal Syphon,
Drainage Syphon, Aqueduct, Fall, H.R. and
3 C.R. Gate, Drain outlet, Pipe Drain Provided 1 780000 Job work
by Engineer in Charge Including
Transportation, Labour Charge etc Complete.
(Excluding Soil Test) with final submission of
Soft Copy and 04 Hard Copy for 24 nos. of
I/We/am/arewillingto carryoutthework at…..................... %above/belowpercent(Should
Bewritteninfiguresandwords)oftheestimatedratementionedabove.Amountofmy/our tender
works out as under.
Estimatedamountputtotender Estimatedamountputtotender
Deduct………%below Add………%Above
Inwords Inwords
(B) ForItemRateTender(ForaboveINR50Cr.):
Item Description of Item Quantity Unit Rate Amount
No (withbriefspecification
andreferencetobookof In In
specifications) figures Words
(A)TotalTenderedAmount
(B)Rebateonabovetenderedamount(ifany)%(infigure)………………………………
(C)NetTenderedAmount(A-B)(infigure)………………………………
1 The Contractor shall exhibit a board with brief details of work asdirected by the
Engineer-In-Charge for which no extra payment shall be made.
2 Thelabourcesswillbe deducted asperprevailingrulesi.e.1%oftheworkdone.
3 GSTandIncometaxTDSwillbededucted atasourcewhilemakingpaymentsofbills
4 In all R.C.C. Items in Rate Analysis Standard Cement Consumption has been taken as
per Govt.asstatedin
S.O.R.thereforeinR.C.C.itemswherethereisachangeasperactualmixdesignthecost of
difference of cement consumption have been deducted from the rate of original item at
the rate of input rate mentioned in all the tender.
Sign Of Contractor Deputy Executive Engineer, Executive Engineer
Irrigation Project Sub Division Irrigation Project Division No.4
No.29,Rajpipla Rajpipla
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
NIT 29.pdf
SBD 29.pdf
Techniucal spe. 29.pdf
BOQ 29.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .