| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹82.8 LAccepted-AOC NIL | PALWAL | HARYANA | 121004 | ₹82.8 L | L1 | Accepted-AOC Qualified in the Lottery |
| 2 | L2₹82.8 LSame as L1Rejected-AOC | ₹82.8 LSame as L1 | L2 | Rejected-AOC Not Qualified in the Lottery |
| 3 | L2₹82.8 LSame as L1Rejected-AOC | ₹82.8 LSame as L1 | L2 | Rejected-AOC Not Qualified in the Lottery |
| 4 | L2₹82.8 LSame as L1Rejected-AOC | ₹82.8 LSame as L1 | L2 | Rejected-AOC Not Qualified in the Lottery |
| 5 | L2₹82.8 LSame as L1Rejected-AOC AL NUAGAON GP BADAMBILA PO NAMAUZA PS AUL DIST KENDRAPARA PIN 754231 | KENDRAPARA | ODISHA | 754231 | ₹82.8 LSame as L1 | L2 | Rejected-AOC Not Qualified in the Lottery |
Tender Value
₹83.1 L
EMD Value
₹83,200
Closing Date
19 Mar 2026, 5:00 pmClosed
Superintending Engineer Rourkela R and B Division
Office of Superintending Engineer Rourkela R and B division
Construction of Dispensary Building cum ResidenceD Type quarter G plus 1 for Govt. Homeopathy Dispensary at Chhend Colony Rourkela for the year 2025 26
2026_EICCL_126979_5
Bid id 30 of 2025-26
Open Tender
Civil Works - Buildings
Percentage
180 days
Rourkela
Please refer tender document
5 documents required · 5 mandatory
₹10,000
₹83,200
Yes
4 Aug 2026
9 Mar 2026
20 Mar 2026
9 Mar 2026
19 Mar 2026
9 Mar 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Civil Work Part-I Earth work in excavation of foundation in hard soil or gravelly soil within 50 m initial loead and initieal lift, including dressing and levelling the bed etc. complete | 116.64 | Cubic Meters | 228.46 | ₹26,647.57 |
| 2 | Supplying and filling foundation and plinth with sand wall watered and rammed with cost conveyance and royality, taxes of all materials and labour (T&P) etc. complete. | 204.11 | Cubic Meters | 537.21 | ₹1,09,649.93 |
| 3 | Cement Concrete (1:3:6) in Foundation using 4 cm size bhg metal including watering, curing with cost, conveyance, royalty and taxes of all materials and cost of all labour (T&P) etc. complete as per the direction of Engineer-in-Charge. | 22.83 | Cubic Meters | 5,595.95 | ₹1,27,755.54 |
| 4 | A) Column Base R.C.C. M-25 using 20 mm & down size b.h.g.c.b chips including watering, curing with cost, conveyance, taxes and cost of all labour (T&P) etc. complete as per the direction of Engineer-in-Charge. | 24.84 | Cubic Meters | 6,072.28 | ₹1,50,835.44 |
| 5 | B) Plinth Beam R.C.C. M-25 using 20 mm & down size b.h.g.c.b chips including watering, curing with cost, conveyance, taxes and cost of all labour (T&P) etc. complete as per the direction of Engineer-in-Charge. | 7.71 | Cubic Meters | 15,335.16 | ₹1,18,234.08 |
| 6 | C) Column / Beam i) Ground Floor R.C.C. M-25 using 20 mm & down size b.h.g.c.b chips including watering, curing with cost, conveyance, taxes and cost of all labour (T&P) etc. complete as per the direction of Engineer-in-Charge. | 15.42 | Cubic Meters | 15,335.16 | ₹2,36,468.17 |
| 7 | C) Column / Beam ii) First Floor R.C.C. M-25 using 20 mm & down size b.h.g.c.b chips including watering, curing with cost, conveyance, taxes and cost of all labour (T&P) etc. complete as per the direction of Engineer-in-Charge. | 11.82 | Cubic Meters | 17,368.63 | ₹2,05,297.21 |
| 8 | C) Column / Beam iii) Second Floor R.C.C. M-25 using 20 mm & down size b.h.g.c.b chips including watering, curing with cost, conveyance, taxes and cost of all labour (T&P) etc. complete as per the direction of Engineer-in-Charge. | 2.36 | Cubic Meters | 19,803.46 | ₹46,736.17 |
| 9 | D) Lintel i) Ground Floor R.C.C. M-25 using 20 mm & down size b.h.g.c.b chips including watering, curing with cost, conveyance, taxes and cost of all labour (T&P) etc. complete as per the direction of Engineer-in-Charge. | 3.85 | Cubic Meters | 13,735.61 | ₹52,882.1 |
| 10 | D) Lintel ii) First Floor R.C.C. M-25 using 20 mm & down size b.h.g.c.b chips including watering, curing with cost, conveyance, taxes and cost of all labour (T&P) etc. complete as per the direction of Engineer-in-Charge. | 3.85 | Cubic Meters | 15,449.15 | ₹59,479.23 |
stage.html
html • 0.13 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.41 MB
Tendernotice_2.pdf
PDF • 0.24 MB
DTCN3005.pdf
Tender Documents • 6.91 MB
BOQ_584364.xls
BOQ • 1.02 MB
CorrigendumNew.pdf
PDF • 0.22 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .