Patch Repair Work at Various Locations in Zone-5 UnderMunicipal Corporation Kota. 7 nit 16
2026_DLB_585148_7
NNK/CIVIL/2026/1010-22 nit 16
Open Tender
Civil Works
Percentage
180 days
kota
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,500
commissioner
₹80,000
Yes
19 Aug 2026
10 Aug 2026
17 Aug 2026
10 Aug 2026
15 Aug 2026
10 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1WORK NAME | |||||
| 1.01 | Dismantling of existing structures like culverts, bridges, retaining walls, CC road and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 50 metres as directed by Engineer.Cement Concrete Grade M-15 and above and PCC blocks | 170 | cum | 678 | ₹1,15,260 |
| 1.02 | Earth work in excavation in foundation, trenches etc. including dressing of sides and ramming of bottoms, including getting out the excavated material, refilling after laying pipe/ foundation and disposal of surplus excavated material at a lead upto 50m suitable site as per direction of Engineer for following depths, below natural ground / Road top level. In all types soils/ saturated soil such as moorum, sand, sandy silt, clay, black cotton soil, kankar, etc. Depth upto 1.5 m | 410 | Cum | 229.5 | ₹94,095 |
| 1.03 | Carriage of Materials by mechanical transport including loading, unloading and stacking :Sand, bazri,
ballast, kankar up to 5 km | - | cum | 203.81 | - |
| 1.04 | Providing, laying, spreading (with paver finisher only) and compacting wet mix macadam (WMM) base course comprising of graded stone aggregate and granular material conforming to MORT&H specifications (Table 400-II) in layers of equal compacted thickness each consolidated, including pre-mixing the material with water at OMC in mechanical mixer (Pug Mill), carriage of mixed material by tippers to site, laying in uniform layers in base course on a well prepared sub-base/ base course and compacting with power vibratory-roller to achieve the desired density complete as per MoRT&H specification clause - 406 including all material, labour, machinery, lighting, guarding and maintenance of diversion. | 175 | Cum | 1,775 | ₹3,10,625 |
| 1.05 | Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering - All work upto plinth level : 1:5:10 (1 Cement : 5 fine/ coarse sand : 10 graded stone aggregate 40
mm nominal size) | 50 | Cum | 4,330 | ₹2,16,500 |
| 1.06 | Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering - All work upto plinth level :1:1½:3 (1 Cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) | 90 | cum | 5,910 | ₹5,31,900 |
| 1.07 | Providing and applying primer coat over prepared surface of granular base with bitumen emulsion as per IS : 8887 and approved quality @ 0.6 kg/sqm with the help of spray set fitted on bitumen Container (boiler) after cleaning the surface including removing of binding material and other foreign matter with wire brushes and small picks, sweeping with brooms or soft brushes and finally dusting with old gunny bags and compressed air to receive bituminous treatment complete as per clause 502 of MoRT&H specification including all material, labour, machinery, lighting, guarding and maintenance of diversion. | 1,250 | sqm | 33.7 | ₹42,125 |
| 1.08 | Providing and applying tack coat on the prepared surface with bitumen emulsion as per IS: 8887 and approved quality @ 0.2 kg/sqm with the help of spray set fitted on bitumen Container (boiler) after cleaning the surface with brooms or soft brushes and finally dusting with old gunny bags and compressed air to receive bituminous treatment complete as per clause 502 of MoRT&H specification including all material, labour, machinery, lighting, guarding and maintenance of diversion. | 2,075 | sqm | 12 | ₹24,900 |
| 1.09 | Providing and laying 20mm thick Mix Seal Surfacing on a prepared surface in a single course composed of specified graded crushed aggregates as per table (500-19) premixed with bituminous binder (including cost of anti-stripping compound, wherever required) with lead of mixed material up to 1 Km. [MoRTH Specification: Clause 508 & 112) in a hot mix plant 40-60 TPH with Front end loader, laying with paver finisher transporting the mixed material up to lead of 20 km by tipper and rolling with power roller 8-10 tonne to achieve density approved by the department with all lead, but excluding cost of track coat.Type "A" (22 Kg. binder per 10 Sqm) bitumen VG 30 | 8,570 | Sqm | 165 | ₹14,14,050 |
stage.html
html • 0.02 MB
tech_bid_open.pdf
tech_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.47 MB
007.pdf
Tender Documents • 0.82 MB
BOQ_1039692.xls
BOQ • 0.39 MB
1011.pdf
PDF • 0.32 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .