Loading…
Loading…
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Tender Value
₹50,000
EMD Value
₹1,000
Closing Date
16 Oct 2026, 4:00 pm6d left
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
EXECUTIVE ENGINEER REW RAJOURI
OFFICE OF THE EXECUTIVE ENGINEER REW DIV RAJOURI
Please refer BOQ
2026_RDPR_327628_1
e-NIT No. 116 REW Rajouri of 2026 Dated 09-10-2026(2nd Call)
Open Tender
Civil Works
Percentage
RAJOURI
Please refer Tender Documents
2 documents required · 2 mandatory
₹300
Treasury Challan MH-0515
₹1,000
Yes
9 Oct 2026
9 Oct 2026
17 Oct 2026
9 Oct 2026
16 Oct 2026
9 Oct 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in bulk excavation by manual means over areas (exceeding 30 cm in
depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth
lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge.
2.6.1 All kinds of soil : | 4.86 | Cum | 592.9 | ₹2,881.49 |
| 2 | Providing and laying in position M-5 cement concrete of specified grade including curing but excluding the cost of centring and shuttering. | 0.24 | Cum | 4,826.5 | ₹1,158.36 |
| 3 | Providing and laying in position M-20 Grade Reinforcement cement concrete of specified grade including curing but excluding the cost of centring and shuttering. | 0.32 | Cum | 7,788.4 | ₹2,492.29 |
| 4 | Providing and laying in position M-20 Grade | 0.32 | Cum | 9,395 | ₹3,006.4 |
| 5 | Steel Reinforcement for RCC work | 58.32 | Cum | 123.2 | ₹7,185.02 |
| 6 | Brick work with common burnt clay FPS in 1:6 | 2.33 | cum | 7,571.55 | ₹17,641.71 |
| 7 | Centering and shuttering inlcuding Starting properly and removal of form work slab | 1.8 | Sqm | 718.2 | ₹1,292.76 |
| 8 | Centering and shuttering inlcuding Starting properly and removal of form work Edges of slab | 7.2 | m | 262.2 | ₹1,887.84 |
| 9 | 12mm Cement plaster finished with a floating coat of neat cement of mix: | 20.22 | Sqm | 370.75 | ₹7,496.57 |
| 10 | Carriage of Sand Aggrigate | 2.25 | Cum | 741.2 | ₹1,667.7 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.38 MB
BOQ_1108417.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .