Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.0 CrAccepted-AOC C 691 PATEL NAGAR RAJENDRA NAGAR BAREILLY | ₹1.0 Cr | L1 | Accepted-AOC L1 |
| 2 | L2₹1.1 CrRejected-AOC | ₹1.1 Cr | L2 | Rejected-AOC L2 |
| 3 | L3₹1.1 CrRejected-Finance 417 SHAHPUR NIJ MORTA DISTT GHAZIABAD | GHAZIABAD | UTTAR PRADESH | 201001 | ₹1.1 Cr | L3 | Rejected-Finance L3 |
| 4 | L4₹1.1 CrRejected-Finance 121004 | ₹1.1 Cr | L4 | Rejected-Finance L4 |
| 5 | L5₹1.4 CrRejected-Finance NEAR S R PETROL PUMP SAORO GATE KASGANJ | KASGANJ | UTTAR PRADESH | ₹1.4 Cr | L5 | Rejected-Finance L5 |
| Sl No | Description | Qty | Unit | M/S KUMAR MANGLAM CONSTRUCTION L4 | M/S OM ENTERPRISES L3 | GSB DEVELOPERS PRIVATE LIMITED L5 | M/S MAHESHWARI TRADERS L2 | M/S OM BALA JEE CONSTRUCTION L1 |
|---|---|---|---|---|---|---|---|---|
| 1.00 | E/W in cutting for making slope in all type of soil including all leads & lifts, labour charges T&P etc. with including proper dressing, manual compaction but excluding mechanical compaction, required for proper completion of work. | 540 | M3 | 86 ₹46,440 | 52 ₹28,080 | 100 ₹54,000 | 70 ₹37,800 | 20 ₹10,800 |
| 2.00 | Supply , Filling and laying of New HDPE/PP woven bags confirming to IS 11652-2000 of Cement bag size 48 cmX 75 cm i/c cost of material carriage loading, unloading, stacking, all taxs etc. required for completion of work. | 2,12,911 | No | 12 ₹25,54,932 | 17.6 ₹37,47,233.6 | 18 ₹38,32,398 | 18 ₹38,32,398 | 18 ₹38,32,398 |
| 3.00 | Supplying and laying 20-40 kg weight boulder packing in 8 SWG G.I. wire crate size (3.00 x 1.00 x 1.00) M with 15.00 x 15.00 cm mesh, double knot including cost of boulder, wire crate, Labour charge and T&P etc. complete | 1,706.62 | Cum. | 4,620 ₹78,84,584.4 | 3,980 ₹67,92,347.6 | 5,200 ₹88,74,424 | 3,700 ₹63,14,494 | 3,500 ₹59,73,170 |
| 4.00 | Supplying & laying of Nylon crate size 1.00 x 1.00 x 1.00 M with mesh size 20.00 x 20.00 cm. And weight not less than 300 gram per no. including cost of all material, labour, T&P etc complete | 7,604 | No | 70 ₹5,32,280 | 54 ₹4,10,616 | 120 ₹9,12,480 | 60 ₹4,56,240 | 80 ₹6,08,320 |
Tender Value
₹1.5 Cr
EMD Value
₹3.1 L
Closing Date
12 Mar 2026, 2:00 pmClosed
S E FLOOD WORKS CIRCLE BAREILLY
S E FLOOD WORKS CIRCLE CANAL COLONY 117 CIVIL LINES BAREILLY
Anti erosion works on the right bank of the Eastern Bahgul river to protect villages Khata Kishanpur, Gauthia, and Tisua, in upstream of the previously constructed flood protection project in district Bareilly.
2026_UPIDC_1122095_4
01/SE/FWCB/2025-26
Open Tender
Civil Works
90 days
BAREILLY
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,895
₹3.1 L
S E FLOOD WORKS CIRCLE CANAL COLONY 117 CIVIL LINE
4 Apr 2026
6 Mar 2026
12 Mar 2026
6 Mar 2026
12 Mar 2026
6 Mar 2026
6 Mar 2026
E/W in cutting for making slope in all type of soil including all leads & lifts, labour charges T&P etc. with including proper dressing, manual compaction but excluding mechanical compaction, required for proper completion of work.
Supply , Filling and laying of New HDPE/PP woven bags confirming to IS 11652-2000 of Cement bag size 48 cmX 75 cm i/c cost of material carriage loading, unloading, stacking, all taxs etc. required for completion of work.
Supplying and laying 20-40 kg weight boulder packing in 8 SWG G.I. wire crate size (3.00 x 1.00 x 1.00) M with 15.00 x 15.00 cm mesh, double knot including cost of boulder, wire crate, Labour charge and T&P etc. complete
Supplying & laying of Nylon crate size 1.00 x 1.00 x 1.00 M with mesh size 20.00 x 20.00 cm. And weight not less than 300 gram per no. including cost of all material, labour, T&P etc complete
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 4.41 MB
BOQ_2089010.xls
BOQ • 0.28 MB
BIDDOCUMENTLOT04.pdf
Tender Documents • 8.97 MB
Download all tender documents and submit your bid