Loading…
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹14.5 LAccepted-AOC | L1 | Accepted-AOC Lowest | |
| 2 | L2₹15.0 L+₹49,875 (3.44%)Rejected-AOC | L2 | Rejected-AOC Higher | |
| 3 | Not Admitted-Finance | - | Not Admitted-Finance Others-Required documents not uploaded |
| Sl No | Description | Qty | Unit | shiv enterprises L1 | Arise New Energy L2 |
|---|---|---|---|---|---|
| 1.00Laying of foundations for erecting of tower of 66kv Line on Labour rates Lump-Sum basic as per PSPCL drawings including excavation, placement of steel reinforcement, concreting, stub setting, form work, centering shoring, shuttering back filling and other allied works required for setting stubs including the cost of sand and gravel complete in all respects as per PWD specifications crusher & sand to be arranged by the contractor. All other material i.e. Cement, Steel, Stub Setting templates etc. shall be provided by PSPCL from its stores at Bathinda,Verpal and Gobindgarh ) free of Cost. | |||||
| 1.10 | Labour Charges involved in Stubbing of W CW/DT 2104 type double circuit towers | 2 | No. | 86,892 ₹1,02,532.56 | 86,022 ₹1,01,505.96 Lowest |
| 1.20 | Labour Charges involved in Stubbing of Z- type CW/TT 2106 R1 type double circuit towers | 5 | No. | 6,02,675 ₹7,11,156.5 | 5,96,650 ₹7,04,047 Lowest |
| 2.00 | Transportation and erection of towers complete with all fittings including tack welding including all T&P (Welding Rods to be supplied by the contractor) & zinc rich paint touching wherever required (zinc paint to be supplied by the contractor) Installation of danger plates, No. plates, Phase Plates, Ckt Plates, Bird guard & Anti climbing devices etc on labour rate basis (66 KV) | 38.05 | MT | 3,93,647.5 ₹4,64,504.05 | 3,89,690.48 ₹4,59,834.77 Lowest |
| 3.00 | Transportation, Installation of Insulator Strings complete with all hardware fittings & Stringing & sagging of ACSR 0.4sq” including fixing of its all Accessories for the 66KV line on 66KV/220KV towers on labour rates basis | 0.64 | SC KM | 72,097.19 ₹85,074.68 | 71,376.25 ₹84,223.98 Lowest |
| 4.00 | Transportation, installation, Stringing & Sagging of Earth wire size 7/2.24mm at the top of tower including fixing of earth wire accessories as on labour rate basis | 0.64 | KM | 6,702.19 ₹7,908.58 | 6,635.2 ₹7,829.54 Lowest |
| 5.10 | Pit marking Straight Tower | 2 | No | 1,000 ₹1,180 | 990 ₹1,168.2 Lowest |
| 5.20 | Pit marking Angle Tower | 5 | No | 7,500 ₹8,850 | 7,425 ₹8,761.5 Lowest |
| 6.00 | Transportaion of Cement from Central store Patiala, Steel from S&T | 1 | Job | 58,000 ₹68,440 Lowest | 84,970 ₹1,00,264.6 |
| 7.00 | Difference of Material | 1 | Job | - | 27,022 ₹31,885.96 Lowest |
Tender Value
Refer Docs
EMD Value
₹29,005
Closing Date
4 Dec 2025, 12:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Dy Chif Engineer
310- 311 2nd Floor Shakti Sadan Near Khalsa College GT Road Jalandhar
66KV O/H line for 66KV S/S PAU and 66KV S/S Sarabha Nagar, Ludhiana
2025_POWER_152473_2
14/PT-551/TLCJAL/2025-26
Open Tender
Miscellaneous Works
Item Rate
PAU to Sarabha Nagar Ludhiana
Please refer Tender documents.
3 documents required · 3 mandatory
₹1,180
₹29,005
Yes
9 Jan 2026
27 Nov 2025
5 Dec 2025
27 Nov 2025
4 Dec 2025
27 Nov 2025
Laying of foundations for erecting of tower of 66kv Line on Labour rates Lump-Sum basic as per PSPCL drawings including excavation, placement of steel reinforcement, concreting, stub setting, form work, centering shoring, shuttering back filling and other allied works required for setting stubs including the cost of sand and gravel complete in all respects as per PWD specifications crusher & sand to be arranged by the contractor. All other material i.e. Cement, Steel, Stub Setting templates etc. shall be provided by PSPCL from its stores at Bathinda,Verpal and Gobindgarh ) free of Cost.
Labour Charges involved in Stubbing of W CW/DT 2104 type double circuit towers
Labour Charges involved in Stubbing of Z- type CW/TT 2106 R1 type double circuit towers
Transportation and erection of towers complete with all fittings including tack welding including all T&P (Welding Rods to be supplied by the contractor) & zinc rich paint touching wherever required (zinc paint to be supplied by the contractor) Installation of danger plates, No. plates, Phase Plates, Ckt Plates, Bird guard & Anti climbing devices etc on labour rate basis (66 KV)
Transportation, Installation of Insulator Strings complete with all hardware fittings & Stringing & sagging of ACSR 0.4sq” including fixing of its all Accessories for the 66KV line on 66KV/220KV towers on labour rates basis
Transportation, installation, Stringing & Sagging of Earth wire size 7/2.24mm at the top of tower including fixing of earth wire accessories as on labour rate basis
Pit marking Straight Tower
Pit marking Angle Tower
Transportaion of Cement from Central store Patiala, Steel from S&T
Difference of Material
Arise New Energy (BID ID -700737)
stage.html
html • 0.04 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.58 MB
DNITPT551.pdf
Tender Documents • 1.46 MB
BOQ_313522.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .