| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹47.4 LAdmitted-Finance | -51.93% | ₹47.4 L | L1 | Admitted-Finance |
| 2 | L2₹54.0 L+₹6.6 L (13.9%)Admitted-Finance WARD NO 09 L C H COLONY KHONGAPANI MANENDRAGARH DISTT KOREA C G 497447 | MANENDRAGARH | KOREA | CHHATTISGARH | 497447 | -45.23% | ₹54.0 L+₹6.6 L (13.9%) | L2 | Admitted-Finance |
| 3 | L3₹54.8 L+₹7.4 L (15.6%)Admitted-Finance NEAR SHIVAM CITY RAJKISHORE NAGAR BILASPUR CHHATTISGARH 496006 | BILASPUR | BILASPUR | CHHATTISGARH | 496006 | -44.44% | ₹54.8 L+₹7.4 L (15.6%) | L3 | Admitted-Finance |
| 4 | L4₹55.0 L+₹7.6 L (16.0%)Admitted-Finance | -44.25% | ₹55.0 L+₹7.6 L (16.0%) | L4 | Admitted-Finance |
| 5 | L5₹56.1 L+₹8.6 L (18.2%)Admitted-Finance PLOT NO 28 ICCR EXTN T P NAGAR KORBA CG 495677 | KORBA | KORBA | CHHATTISGARH | 495677 | -43.17% | ₹56.1 L+₹8.6 L (18.2%) | L5 | Admitted-Finance |
Tender Value
₹98.7 L
EMD Value
₹1.2 L
Closing Date
25 Apr 2026, 5:00 pmClosed
Town Administrator, SECL HQ, Bilaspur
Town Administrator, SECL HQ, Bilaspur
Renovation of Indira Vihar Health Centre, Indira VIhar Colony, SECL Hqrs., Bilaspur.
2026_SECL_358077_1
SECL/BSP/TA/e Tender/2026-27/02 dtd.06.04.2026
Open Tender
Civil Works - Buildings
Percentage
60 days
Indira VIhar Colony, SECL Hqrs.
Please refer Tender documents.
5 documents required · 5 mandatory
₹1.2 L
7 Aug 2026
7 Apr 2026
27 Apr 2026
7 Apr 2026
25 Apr 2026
8 Apr 2026
7 Apr 2026 - 18 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| - | Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and for all lift, as directed by Engineer-in-charge.: All kinds of soil | - | cum | - | - |
| - | Supplying and filling in plinth with sand under floors, including watering, ramming, consolidating and dressing complete. | - | cum | - | - |
| - | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:2:4 (1 cement : 2 coarse sand (zone-III) derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources) | - | cum | - | - |
| - | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:3:6 (1 Cement : 3 coarse sand (zone-III) derived from natural sources : 6 graded stone aggregate 20 mm nominal size derived from natural sources) | - | cum | - | - |
| - | Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fllets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement: : 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources) | - | cum | - | - |
| - | Reinforced cement concrete work in beams, suspended foors, roofs having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases above plinth level up to floor five level, excluding the cost of centering, shuttering, finishing and reinforcement with 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) derived from natural sources: 3 graded stone aggregate 20 mm nominal size derived from natural sources). | - | cum | - | - |
| - | Centering and shuttering including strutting, propping etc. and removal of form for : Suspended floors, roofs, landings, balconies and access platform | - | sqm | - | - |
| - | Centering and shuttering including strutting, propping etc. and removal of form for : Lintels, beams, plinth beams, girders, bressumers and cantilevers | - | sqm | - | - |
| - | Centering and shuttering including strutting, propping etc. and removal of form for : Columns, Pillars, Piers, Abutments, Posts and Struts | - | sqm | - | - |
| - | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. : Cold twisted bars | - | kg | - | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Tendernotice_1.pdf
PDF • 0.82 MB
Tendernotice_2.pdf
PDF • 1.43 MB
Tendernotice_3.pdf
PDF • 0.26 MB
BOQ_370965.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .