Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹69.1 LAccepted-AOC | L1 | Accepted-AOC L1 |
Tender Value
₹62.8 L
EMD Value
₹50,000
Closing Date
10 May 2022, 2:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Executive Engineer
Office of Exe. Engineer,road maint divin kottayam
GENERAL-RM-2021-22-CLUSTER 1-ONE YEAR RUNNING CONTRACT FOR VARIOUS PWD ROADS UNDER ROADS SECTION ERATTUPETTA IN KOTTAYAM DISTRICT, 9 ROAD STRETCHES FOR A TOTAL LENGTH OF 31.25 KM-General Civil Work
2022_PWD_486994_2
D1/PWD/RM// TR/104242/2021_5_4_4 dtd 19/04/20221
Open Tender
Civil Works - Roads
Item Rate
365 days
ERATTUPETTA
Please refer Tender documents.
12 documents required · 12 mandatory
₹2,760
Yes
₹50,000
Yes
8 Jul 2022
3 May 2022
12 May 2022
3 May 2022
10 May 2022
3 May 2022
60 days
Amount
Part A Reactive Maintenance
55.4:Supplying and stacking 36mm size hard broken stone in standard heaps for measurement.
55.8.a:Filling up pot holes (cut and formed to regular shapes and all loose and defective materials removed) after supplying a prime coat of hot bitumen using 36mm departmental broken stone and compacting with power roller to get a compact surface.
3.15:Scarifying the existing bituminous road surface to a depth of 50 mm and disposal of scarified material with in all lifts and lead upto 1000 metres by Mechanical Means <br>
4.12:Providing, laying, spreading and compacting graded stone aggregate to Wet Mix Macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density.
5.1.a:Providing and applying primer coat with bitumen emulsion ( SS) on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 0.70 - 1.0 kg/sqm using mechanical means.
5.2.a:Providing and applying tack coat with bitumen emulsion( RS) using emulsion pressure distributor at the rate of 0.20 - 0.30 kg per sqm on the prepared bituminous surface cleaned with mechanical broom.
OD77414/2021-2022:MORD - Providing, laying and rolling of close-graded premix surfacing material of 20 mm thickness composed of 11.2 mm to 0.09 mm (Type-A) OR 13.2mm to 0.9 mm (Type - B) aggregates using penetration grade bitumen using VG 30 to the required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheeled roller 8-10 KN static roller and finishing to required level and grade as per Technical specification clause 509 of MORD - Bitumen @22 kg / 10 m2....
12.8.1.C.1:Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications RCC Grade M20 - Using Concrete Mixer
12.40:Supply, Fitting and Placing un- coated HYSD bar Reinforcement in Foundation complete as per Drawing and Technical Specifications
10.3:Maintenance of Earth Shoulder (stripping excess soil) from the shoulder surface to achieve the approved level and compacting with plate compactor
OD77412/2021-2022: Arranging Man mazdoor for cutting earthen drain, diverting blocked water, and other various work
2.2:Clearing grass and removal of rubbish up to a distance of 50 metres outside the periphery of the area
55.15:Refurbishment of existing signboardsRefurbishment of existing signboards of all size except gantry mounted ones to their original reflectivity & position by removing obstructions like overgrowth vegitation etc ,if any,washing the signboards with water & soap solution to remove all dirt, oil etc. , correcting any dislocations including minor repairs, replacement of lost nut and bolts etc complete.
OD77410/2021-2022:Hire and running charges for Tipper
OD77413/2021-2022:Hydraulic Excavator of 1 cum bucker
Part B Preventive Maintenance
55.4:Supplying and stacking 36mm size hard broken stone in standard heaps for measurement.
55.8.a:Filling up pot holes (cut and formed to regular shapes and all loose and defective materials removed) after supplying a prime coat of hot bitumen using 36mm departmental broken stone and compacting with power roller to get a compact surface.
5.2.a:Providing and applying tack coat with bitumen emulsion( RS) using emulsion pressure distributor at the rate of 0.20 - 0.30 kg per sqm on the prepared bituminous surface cleaned with mechanical broom.
OD139841/2021-2022:Close Graded Premix Surfacing/Mixed Seal Surfacing :- Case I, Type - A -By Manual means Providing, laying and rolling of close-graded premix surfacing material of 20 mm thickness composed of 11.2 mm to 0.09 mm (Type-A) aggregates using penetration grade bitumen using VG 30 to the required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a Smooth wheeled roller 8-10 tonne capacity, and finishing to required level and grade.
2.2:Clearing grass and removal of rubbish up to a distance of 50 metres outside the periphery of the area
OD140015/2021-2022:Fill ing up potholes with bituminous ready mix compound (25kg bag) and compacting by ramming to get a compact surface including of cost of material,laying charges, transportation to site etc. complete rate is arrived for a bag of 25kg Assuming a average of 30 bags of 25 kg ready mix compound will be laid in potholes in a day
OD140016/2021-2022:After Spraying Emulsion to the surface of pot holes ,laying 36mm Brocken Stone ,Spraying Emulsion over the 36mm and compacting manually to get a compact surface
Routine Inspection
OD141763/2021-2022:Conducting and reporting routine inspections for the entire length of project Road at a frequency of 7 days through out the agreement period of the running contract as directed by the departmental officer at site Additional RI may be required in response to reports or complaints from the police, other authorities and the public as a result of major incidents, typhoon or flooding damages etc. and are not measurable/ payable. A proportion of the RI should be carried out either during or immediately following a period of wet weather.
Bidder Name
P. S. Sunil
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_701982.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .