Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | l1₹3.1 LAccepted-AOC HIMACHAL PRADESH HP | SOLAN | HIMACHAL PRADESH | 173202 | l1 | Accepted-AOC aoc | |
| 2 | l2₹3.3 L+₹18,591 (6.02%)Rejected-Finance VILLAGE BOUNAL P O RAJANA TEHSIL SANGRAH DISTT SIRMOUR H P | l2 | Rejected-Finance NOT THE LOWEST BIDDER | |
| 3 | l3₹3.5 L+₹36,751.40 (11.9%)Rejected-Finance MANDI HIMACHAL PRADESH | l3 | Rejected-Finance NOT THE LOWEST BIDDER | |
| 4 | l4₹3.6 L+₹50,512 (16.3%)Rejected-Finance MANDI DIVISION NO II HP PWD MANDI | MANDI | HIMACHAL PRADESH | 175001 | l4 | Rejected-Finance NOT THE LOWEST BIDDER | |
| 5 | l5₹4.2 L+₹1.1 L (35.0%)Rejected-Finance | l5 | Rejected-Finance NOT THE LOWEST BIDDER |
Tender Value
₹3.5 L
EMD Value
₹7,000
Closing Date
2 Jan 2020, 5:00 pmClosed
Executive Engineer, HPPWD Division Sangrah
Executive Engineer, HPPWD Division Sangrah
C/o Breast wall in PCC from km 1/840 to 1/880 and improvement of curve form km 1/240 to 1/310)
2019_PWD_33443_3
8645-95 DATED 10.12.19
Open Tender
Civil Works
Item Rate
90 days
Sangrah
Please refer Tender documents.
10 documents required · 10 mandatory
₹350
Executive Engineer, HPPWD Division Sangrah
₹7,000
27 Jan 2020
19 Dec 2019
3 Jan 2020
19 Dec 2019
2 Jan 2020
19 Dec 2019
Amount
Excavation in earth work in in hilly area all height and depths and in all kinds of soils including saturated soil comprising of mixed soil oridinary rock and hard rock. All works road rock cutting by blasting shall be carried out by taking all necessary precutions against soil erosion damage to hill side water pollution etc, and to protect stability of hill side.Rock shall be excavated with chieseling and wedging out rock( where blasting is prohibited).All earth work in cutting/ excavation, including rock excavation shall be carried out true to lines grades sides slopes,width, camber,super elevation and level as shown on the drawings or as directed by the Engineer-in-Charge in confirmity with the requirement of technical specification of Rural road August 2004 and clause 16.2 of general conditions for contract to achieve designed formation width including hauling and stacking of materials useful for construction at suitable sites and safe disposal of unserviceable cut material and specificed manner,including arrangement of dumping site trimming,filling of unvenness blindage and finishing of the road to specified diamensions including disposal of surplus materials with all leads, and lifts at the locatuion specified in the tender document or as directed by the Engineer-in-Charge for smooth riding.The recovery for stones where useful or not i.e. 44.55 (Forty four point five five)cubic metre @ 170/- (Rs. one hundred Seventy)only per cubic metre shall be effected on pro-rata basis.Any loss to the public and private property during the course of excavation shall be the absolute responsibility of the contractor,which shall have to be duly compensated by him at his on cost in all cases including haulaging/ carriage of all labours, equipments and materials to various locations through all mode of transportations in all leads, lifts to the entire satisfaction and direction of the Engineer- in - Charge.
Excatation in soil in hilly area in all depths using all means as per drawing and technical specification ministry of Rural Development for rural roads August 2004 (Two thousands four) clause 305.1 (three hundred five point one) including setting out, coustruction of shoring and bracing, removal of stumps and other deleterious materials including dressing of sides and bottom and back filling in trenches with excavated suitable materials and stacking of materials useful for construction at suitable sites and safe dispoal of unsuitable cut materials by all modes of transportations in all leads and lifts at specified places in specified manner, systematically with level consideration to avoiding adverse effects on environment, trimming filling of unevenness blind age and finishing of the road to specified dimension or as directed by the Engineer-in-charge. any loss to the public or private property during the course of excavation shall be the sole responsibility of the contractor which shall have to be duly compensated by him at his own cost in all cases.
Earth work in excavation for structures in all depths as per drawing and Technical specification of Ministery of Rural Development for rural roads August 2004 (Two thousand four) C-305-1(Clause-three hundred five point one) including setting out construction of shoring and bracing, removal of stumps and other deleterious materials including dressing of sides and bottom and back filling in tranches with excavated suitable materials all work of rock cutting by blasting shall be carried out by taking all necessry precaution against soil erosion damages to hill side water pollution etc. and to protect stability of hill side rock shall be excavated with chiesling and wedging out rock (where blasting is prohibited) all earth work in cutting.excavation including rock excavation shall be carried out true to lines grades,side slopes, width, camber super elevation and level as shown on the drawings or as directed by the Engineer-in-Charge hauling and stacking of materials useful for construction at suitable sites and safe disposal of unsuitable cut materials by all modes of transportations in all leads and lifts at specified places, in specified manner systemathically with due consideration to avoiding adverse effects on environment, trimming filling of unevenness blind age and finishing of the road to specified dimension to the entire satisfaction as directedby the Engineer-in-charge. If the foundatioin of the structure is in an area with stangnat water or water is met with in the excavation due to spring seepage rain and other courses it shall be remove by suitable diversion boilingout or pumping as directed and the area of foudation or embankment shall be kept dry any loss to the public or private property during the course of excavation shall be the sole responsibility of the contractor which shall have to be duly compensated by him at his own cost in all cases.
Providing and laying plain cement concrete 1:4:8 (One cement is to four sand is to eight graded hard crushed stone aggregate 25(twenty five) mm mechanically mixed and viberated in foudationor similar works complete works complete as per drawings and technical specification of ministery of rural Development for rural road August 2004(Two thousand four) clause 802-803, 1202 and 1203 (eight hundred two, Eight hundred three , One thousand two hundred two and one thousnad two hundred three) and curing complete including cost of form work and hauling/ carriage of all labour equipments and materials to various locations through all modes of transportations in all leads and lifts to the entire satisfaction as per direction of Engineer- in-Charge
Back filling behind abutment, Wing wall &Return wall complete as per drawing and technical sepecification clause 1204.3.8 including carriage of materials with in all leads,lifts and other incidentals complete as per entire satisfaction of the Engineer-in-charge.
Providing weep holes in brick masonry/stone masonery plain/reinforced concrete abutment wing wall ruturn wall with 100mm dia PVC pipe extending throught the full width of the structure with slopes of i(V):20(H) towards drawing face complete as per drawing and technical specification clause 614,709,1204.3.7 . including hauling of material in all leads, lifts as per the entire satisfaction and direction of Engineer-in-charge .
Som Prakash
Khajan Singh
DESH RAJ
Nikka Ram
VIJENDER SHARMA
Ashok Kumar
stage.html
html • 0.07 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .