Loading…
Loading…
Tender Value
₹20 L
EMD Value
₹20,000
Closing Date
12 Oct 2026, 6:00 pm4d left
CEO & SE (O&M), DGVCL, Circle Office Valsad
ARC for scraping previously painted all type of surfaces and applying new painting to all type of surfaces to various office buildings under jurisdiction of Valsad Circle Office
351014
DGVCLCVLS/NCW/E-FILE/4438/2026/2034/CIVIL
Open
Civil Works
Works
Valsad
11 documents required · 10 mandatory · 1 optional
₹1,180
DGVCL payable at Valsad
₹20,000
1 Oct 2026
1 Oct 2026
1 Oct 2026
12 Oct 2026
1 Oct 2026
NAME OF WORK:-“ARC for scraping previously painted all type of surfaces and
applying new painting to all type of surfaces to various office buildings under
jurisdiction of Valsad Circle Office.”
TIME LIMIT :- Twelve months
Name of Tenderer’s:-
1) TENDER FEE :- 1000/- +18% GST = Rs
Tender fee DD No. Rs. .
Receipt No-___________ Book No-____________
2) Earnest Money Deposit Rs. 20,000.00/-.
EMD DD No. Dtd. .
Receipt No-___________ Book No-____________
Special note for prequalification
Name of work: “ARC for scraping previously painted all type of surfaces and applying
new painting to all type of surfaces to various office buildings under jurisdiction of
Valsad Circle Office.”
Contractor should submit evidence as a registered civil works contractor in appropriate class
With Govt./ Semi. Govt. i. e. Class “E-1” or enlisted with DGVCL/MGVCL/UGVCL/PGVCL /GEB /
GSECL/ GETCO / DISCOM / Central / State Government / Semi Government in similar category.
1. Average Annual Financial turnover during the last 3 years, ending 31st March of the previous
financial year, should be at least 30% of the estimated cost (Turnover Certificate).
2. Experience of having successfully completed similar works during last 3 years ending last day
of month previous to the one in which applications are invited should be either of the
a. Three similar completed works costing not less than the amount equal to 40% of the
estimated cost.
b. Two similar completed works costing not less than the amount equal to 50% of the
estimated cost.
c. One similar completed work costing not less than the amount equal to 80% of the
estimated cost.
4. The bidder have to submit the copies of similar nature work completion certificate showing
name of owner, name of work, order amount, final completion amount, time limit
commencement date and completion date.
5. Latest Bank Solvency Certificate of minimum 20% amount of tender not older than one year
of opening of technical bid.
6. Separate provident fund code number towards registration of your firm with Regional P.F.
Commissioner if applicable.
7. EMD & Tender fee as described in the tender document.
8. The contractor who has been blacklisted with GUVNL/ DGVCL/ MGVCL/ UGVCL / PGVCL/ GSECL/
GETCO shall not be considered.
9. The bidder must have Goods and Service Tax (GST) Registration with “ACTIVE” status & PAN
NO and same shall be submitted along with the Tender only. The tender of the bidder without
GST Registration will not be considered.
10. Cancel checked
Bidder has to upload all the above documents by scanned copies of original
(Notarized/Self attested copies of original) documents with bid and no physical
documents to be called from bidder.
It shall be sole responsibility of the bidder that the uploaded scanned documents
(in PDF form) remain legible and should not be password protected.
The Bidders shall submit documentary evidences in support of all above Qualification criteria with
duly signed tender copy, failing which the bid will be rejected. The Bidder, who is newly registered
with the Govt./Semi Govt. will be considered with due exemption in experience and turnover
except that all the documents is to be submitted, failing which the bid will be rejected
No tender shall be accepted / opened in any case after due date and time of receipt of tender,
irrespective of delay due to postal services or any other reasons and the company shall not
assume any responsibility for late receipt of tender.
The above documents will be analyzed and after satisfaction, the price bid will be opened online
only. DGVCL may verify the documents, experience certificates with authority who have issued
such certificates / details.
Sign and seal of supplier
Tender Notice No. D G V C L C V L S / N C W / E - F I L E / 4 4 3 8 / 2 0 2 6 / 2 0 3 4 / C I V I L
Inviting Online Tender
Details about Tender:
Department Name Automatic System Generated
Circle/Division Automatic System Generated
IFB No / Tender Notice No. DGVCLCVLS/NCW/e-file/4438/2026/2034/Civil
“ARC for scraping previously painted all type of
Name of Project surfaces and applying new painting to all type of
surfaces to various office buildings under
jurisdiction of Valsad Circle Office.”
“ARC for scraping previously painted all type of
surfaces and applying new painting to all type of
surfaces to various office buildings under
jurisdiction of Valsad Circle Office.”
Estimated Contract Value (INR) Rs. 20,00,000.00/-
Period Of Completion(in Months) Twelve months
Mode of Tender Open
Tender Currency Type Single
Tender Currency Settings -----------
Joint Venture Not Applicable
Rebate Not Applicable
Sector Category Power and Energy
Form Of Contract Works
Product Category Civil Works
Amount Details:-
Bid Document Fee : Rs. 1180.00 /-
Bid Document Fee Payable To : DGVCL Payable @ Valsad
Bid Security/EMD (INR) : Rs. 20,000.00 /-
Bid Security/EMD In Favour Of : DGVCL Payable @ Valsad
Tender Dates :-
Bid Document Downloading Start Date Automatic System Generated
Bid Document Downloading End Date 12/10/2026; 18:00 Hrs.
Pre Bid Meeting (If require) NA
Last Date & Time for Receipt of Online
Bid Validity Period 180 Days
Submission of only Physical EMD and Tender Fee
document during office hours should be submitted on
or before 17/10/2026 in the Office of CEO & SE
(O&M), DGVCL, Circle Office Valsad. DAKSHIN
GUJARAT VIJ CO. LTD CIRCLE OFFICE VALSAD,
Remarks VASHIER ROAD, COUNTRY CLUB
VALSAD-396001 All the other required documents
mentioned in the special note for prequalification
are to be uploaded scanned in PDF format in n-
procurement only. No physical submission is
acceptable by DGVCL.
Bid Opening Date 19/10/2026; 11:00 am ( if possible )
Other Details:-
Officer Inviting Bids : The CEO & SE, DGVCL Circle Office, VALSAD.
Bid Opening Authority : The CEO & SE, DGVCL Circle Office, VALSAD.
DAKSHIN GUJARAT VIJ CO. LTD
Address : CIRCLE OFFICE VALSAD,
VASHIER ROAD, COUNTRY CLUB
Contact Details : 02632-253936/244410
GENERAL TERMS & CONDITION:
Payment of tender fees can be accepted by D.D/ RTGS/NEFT.
In case of cash payment (up to Rs. 10000/-), the scanned copy of cash receipt shall
have to be uploaded with the bid.
In case of payment through DD/Banker’s cheque of any local National Bank in favors of
DGVCL circle office situated at Valsad, the scanned copy of original document shall have
to be uploaded with the bid and original copy of the same will have to be submitted at
the office address specified in the tender document, within 5 days bid opening.
Payment of Earnest Money Deposit (EMD) can be accepted by RTGS/NEFT/DD. (Account
details as mentioned in the condition of tender fee)
In case of cash payment (up to Rs. 10000/-), the scanned copy of cash receipt shall
have to be uploaded with the bid.
In case of payment through DD/Banker’s cheque/Pay Order/Bank Guarantee of any local
National Bank in favors of DGVCL circle office situated at Valsad, the scanned copy of
original document shall have to be uploaded with the bid and original copy of the same
will have to be submitted at the office address specified in the tender document, within
days bid opening.
-: Performa of R.T.G.S. Details:-
Sr.No. Particulars Requisite Details
1 Name of Bank STATE BANK OF INDIA
2 Name of Branch STATION ROAD VALSAD
3 IFSC Code SBIN0001631(5TH character is “zero”)
4 Name of Account GUVNL A C DAKSHIN GUJ VIJ CO LTD
Account No (Cash Credit
6 Branch Address STATION ROAD VALSAD
SECURITY DEPOSIT:-
The successful tenders shall be required to further remit amount equivalent to 5% of the
order value towards security deposit. This amount will be payable to Circle Office, Valsad.
It will be refundable after completion of the contract & on production of no objection
The successful tendered shall also have to enter into agreement with the DGVCL towards
execution of the contract on non judicial stamp paper of appropriate value (cost of stamp
Rs.300/- shall be borne by the contractor). This agreement will be executed as per
standard format of the Circle Office, Valsad before commencement of the contract.
INDEMNITY BOND:-
The successful contractor shall have to indemnity to the DGVCL for the entire liability of
the employee engaged in the work by contractor. The indemnity should also cover liability
towards road accident done by vehicles of the contractor during the execution of the
work. For this purpose an indemnity bond shall have to be given in standard format on
non-judicial stamp paper of appropriate value as per rules (cost of stamp Rs.300/- shall
be born by the contractor)
TERMINATION OF CONTRACT:-
The contractor is found to be lacking in execution of the work in any manner the company
reserves the right.
1) To get work done through any other agency at the risk and cost of the contractor.
2) To cancel the unexecuted part of the contract without any notice and towards this
place the order for that to any other agency at the risk and cost of defaulter, default
by Circle Office, Valsad for non execution of contract, contract shall be terminated
and carry out the work as per condition of booklet of “tenders and contract for works”
and SD paid shall be forfeited and the contractor shall be blacklisted.
Sub : “ARC for scraping previously painted all type of surfaces and applying new
painting to all type of surfaces to various office buildings under jurisdiction of Valsad
Circle Office..”
1) Contract booklet of DGVCL for “Detailed specification of terms” and General terms
and conditions of work are available for reference in the office of The C.E.O. &
S.E. (O&M), DGVCL Circle Office, Valsad.The contractor quoting for this tender is
deemed to have gone through this book of contract booklet and same will be
treated as binding of him.
2) The rate should be quoted both in words and figure as per units specified in the
Tender, should there be any discrepancy between the rates quoted in words and
figure. The rates quoted and words should be prevailing. Further should there be
any discrepancy between rates and amount the rates will prevail.
3) For reinforced cement concreting, centering will have to be done and also mixture
machine and vibrators used, without which the work will not be allowed. Nothing
extra will be paid for excavation other than mentioned in drawings &
4) Quantities mentioned in scheduled-B are approximate and before ordering any
materials, prior permission from the Deputy Engineer in charge shall be taken and
nothing extra will be paid for the materials collected in excess.
5) Where company cannot provide water supply, the contractor will have to make
his own arrangement for the water required for construction and other purposes,
and the company does not take any responsibility for the same. Testing materials
should be required before using row materials by contractor at his own cost.
6) However, during the course of work, later on if company is in position to supply
water to the contractors, the contractor may obtain water from the company in
such case the charges for the water supplied will be recovered at the rate of
percent of the cost of items as executed in which the water supplied by the DGVCL
is used as certified by the Engineer in charge.
7) As mentioned above if the contractor make his own arrangement for the water
required for the water required for the construction & other purposes & if the
contractor is getting water by drilling bore wells or construction well in the
premises of the company or by providing his own pump on the existing Bore
wells/well of the company &uses this water for civil works, then company will
recovered royalty at 0.25 % of the cost of the items executed in which the water
supplied by the Company is used / consumed .The contractor however will not be
allowed to use water by this way without the permission in writing from engineer
8) The successful contractor has to execute a work agreement with the company on
stamp paper in Prescribed Performa of the company ,the cost of stamp papers
are to be borned by the contractor.
9) The successful contractor has to give indemnity Bond on stamp papers in the
prescribed Performa of DGVCL. The cost of such stamp papers is to be borned by
the contractor.
10) The prices are inclusive of all government taxes as per government notifications
but except service tax. You will have to quote service tax extra.
11) In case of silent or nothing written or (-) or blank in service tax, it would be
understand that you have quoted rate including service tax. It means your liability
will be paid by you and liability of DGVCL will be deducted from your bill.
12) Any activity not specifically mentioned in the tender but necessary in the opinion
of Engineer In charge of work must be carried out for successful completion of
the job, on getting approval competent authority of DGVCL.
13) Before taking up construction activity, the agency has to cut the trees which
obstruct the working of any diameter , bushes , vegetations, roots , plants,
shrubs, grass etc including stacking and crediting to DGVCL as directed with no
14) No escalation towards labour and material/fuel shall be paid in the execution of
15) The contractor shall arrange for insurance coverage for all employees diploid for
the said work in amount approved by the company and sufficient to protect
against the following risk arising during the work. Accidents and professional and
non professional sickness of all labours and persons engaged in the work as
required by the law pursuant to workmen’s compensation act 1923 or revised
version including injury or death to the third person including without limitation
injury of death caused by any of the construction aids or vehicles or rented
machinery, equipment’s used by the contractor or sub contractor weather at the
site or elsewhere. Damage to the contractor’s tools, machinery, construction
equipment’s, formworks, scaffolding materials etc. due to flood, earthquake or
any such cause, damage to the existing permanent structure of the company or
nearby villages, equipment’s of the company or of the co-contractor working in
the area for other works. All the above conditions referred for the insurance
covered, shall be in effect from the date of commencement of the work until the
company has accepted the work. In the policies covering the insurance referred
above, the company, contractor and the sub contractor shall be as co-insured
where possible. The cost of insurance shall be borne by the contractor.
16) The electric power can be obtained from DGVCL at site at one mutually agreed
point, as a temporary connection at free of cost. Further distribution will have to
be carried out by the contractor as per requirement at their own cost. The
necessary bills for consumption charges will be borned by the contractor and the
same will be recovered as per the tariff rate of the DGVCL from time to time as
per company’s rules.
17) If your work is found not satisfactory or not progressing according to scheduled
programmer , DGVCL may take such actions as may be deemed fit to see that
the work is completed in time at your risk and cost
18) The Technical Bid of tender are required to be submitted on or before date
12/10/2026 up to 18:00 Hrs in online only. Submission of only Physical EMD and
Tender Fee document during office hours should be submitted on or before
17/10/2025 by R.P.A.D./ Speed post at the following address :
The Chief Executive Officer & Superintending Engineer (O&M),
Dakshin Gujarat Vij Company Ltd.
VASHIER ROAD, COUNTRY CLUB
VALSAD-396001, VALSAD –
With following remarks on top of envelope Tender Offer for “ARC for scraping
previously painted all type of surfaces and applying new painting to all type of surfaces
to various office buildings under jurisdiction of Valsad Circle Office”
Signature of Contractor
DGVCL Circle Office, Valsad
SPECIAL CONDITION FOR USE OF CEMENT IN WORK
1. The rates in Schedule-B are inclusive of cement cost. Contractor has to purchase
fresh 53 grade cement confirming to IS 8112 and of approved brand by DGVCL.
2. Contractor has to construct kachha godown due to any work so that cement bags
can be preserved properly to avoid damages due to any kind of water/weather.
3. Contractor has to bring sufficient quantities of cement bags and sufficient quantities
of cement bags to maintain progress of work. The work should not suffer for want of
4. Cement should give the required strength of cement concrete.
5. To bring sufficient and timely cement at site is fully responsibility of contractor.
Nothing extra will be paid on account of any reason to maintain progress of work and
to complete the work in schedule time.
6. Contractor has to submit material account for consumption of cement used with
every bill. In case of not submitting the same, bill will not be passed. Party has to
submit the copy of cement /purchase bill along with R.A. bill / Final bill.
7. No negative variation will be allowed for the consumption of cement than prescribed
as per booklet of technical specification of company / mix design & nothing will be
paid extra for over consumption.
8. Contractor is fully responsible for safety of cement at site. Nothing will be paid on
extra on account of safety.
9. If company’s authorized representative wants to check cement stock at site,
contractor has to allow for the same at any time.
10. Contractor has to maintain day to day cement consumption / balance account at site.
11. As far as possible, contractor has to maintain supply cement of only one brand &
grade throughout the work & on account of closure / shortage of approved brand,
cement of other brand in accordance of condition no. (1) Will be allowed by Engineer-
12. Minimum cement consumption considered for cement concrete having grade of M-15
/ M-20 /M-25 is 300 kgs/320 kgs/340 kgs respectively. Contractor has to use
minimum cement as above. Contractor should not use less than the prescribed
quantities of cement even in the case of mix design recommends lower quantity.
13. Contractor will be allowed to carry out work only after physical verification of cement
brought at site.
GENERAL CONDITIONS: For issue of materials
1. No any material shall be supplied by DGVCL
Signature of Contractor
DGVCL Circle Office, Valsad
TERMS & CONDITIONS REGARDING INDUSTRIAL LAWS & OTHER RELATED MATTERS.
1. Wages to be paid & time of payment etc. by the contractor:-
The contractor shall pay minimum of as per latest minimum wages act or as may be
specified hereafter or rates fixed under the minimum wages act whichever is higher. The
wages of every contract labour employed by him under this contract shall be paid by him
before the expiry of 7th day of the last of the month in respect of which the wages are
payable (i.e wages of month have to be paid him in the first week of the next month.) The
payment shall be discharge in the presence of Management representative during the
working hours in factory premises & the contractor shall get entries certificated in the
register of wages by the representative of the Board. Any default will result in cancellation
of contract forthwith or else the contractor shall be punishable to the extent of Rs. 100 /
fine per each day.
The Contractor shall give his telephone number and address to the DGVCL, so that in case
of labour trouble etc. the contractor can be contacted.
2. Labour Laws:-
Person below age of 18 years shall not be employed for the work.
No female worker shall be employed in the night shift between 7 p.m to 6 a.m
Contractor shall maintain a valid labour license under the contract labour (Regulation &
abolition) act for employing necessary manpower to be required by him. In the absence of
such license the contact shall comply with as under.
1. Payment of contribution by way of employer’s contribution towards provident fund,
family pension scheme, Deposit linked insurance scheme, Administrative charges etc. at
the rates applicable from time to time by Government of Gujarat / Government of India
or other statutory Authority.
2. Payment of deposit in respect of each contract labour at the rate of Rs.30/ with the office
of frame there under of labour as per control labour. (Regulation & abolition) Act.
3. License fee as prescribed under the control labour (Regulation & abolition) Act & rules
frame there under depend upon the number of workmen employed by the contractor.
4. Paid leave facility & wages as per the provision of the factories act at the rate of one day
for every 20 days of working.
5. Identity cards as prescribed under the facilities act with photo affixed there to the same
for identification.
6. Payment of retrenchment compensation notice pay & other liabilities as per industrial
disputes Act. Any payment to the contractor’s employees arising out of any claim or
disputes under the industrial dispute act 1947 or any other labour laws.
7. Payment of compensation in case of accident injury.
8. Provision of ereche if the female labours employed are more than 30 numbers.
9. Maternity leaves as per the provision of maternity Benefit Act.
The above are some of the major liabilities of the contractor in addition to other liabilities
prescribed under the various labour laws in force from statutory authorities like state
Government / Government of India which the contractor shall have to comply with.
3.Provident fund & Family pension scheme:-
The contractor shall submit along with his bill (month wise) a statement regarding
deductions against employees provident fund & family pension scheme in respect of each
concerned against employee. provident fund & family pension scheme at the rate of 8.33%
( or at the rate made applicable by the Government from time to time ) of the wages. The
contractor’s contribution & his workers contribution towards provident fund, family pension
scheme shall be deposited by the contractor with Regional provident fund commissioner
4.Deposit Link Insurance:-
The contractor shall have to deposit 0.5% of the wages in respect of employees who is a
member of the provident fund as the contribution to the Deposit link insurance scheme with
Regional provident fund commissioner, Ahmadabad.
5.Administrative charges:-
Administrative charges for monitoring provident fund A/C shall be deposited by the
contractor with Regional provident fund commissioner, Ahmadabad at the rates applicable.
Paid leave facilities:
Paid leave facility at the rate of one day of every 20 days worked by the contractor labour
shell be provided by the contractor to his workers. He shells maintain leave record/ leave
card for individual labour, which shall be duly verified and approved / certified by the
authorized officers of the DGVCL.
6.Workmen’s compensation fund & employer’s liability Insurance:-
The contractor shall cover all his employees under workmen’s compensation fund & under
the liability insurance.
The contractor shall employ adequate number of experience staff at site for daily supervision
& for maintenance of various register & records required under the law & contract. No
payment for supervision shall be admissible.
7.Contractor to Indemnity the DGVCL:-
The contractor shall indemnity the company & every member officer & employees of the
company also. Engineer in charge his staff against proceedings claims, demands, costs &
expenses what so ever arising out of or in connection with the matters referred herein above
elsewhere & against all actions. Proceedings claims, demand costs & expenses which may
be made against the DGVCL or Government for or in respect of or formance of his obligation
under the contract documents. The DGVCL shall not be liable for in respect of or in
consequences of any accident or injury to any workmen or other person in the employment
of contractor or his sub contractor & the contractor shall indemnity & keep indemnified The
company against all each damage & compensation & against all claims, demands,
proceedings costs, charges & expenses what so ever in respect thereof in relation there.
8.Work compensation & employer’s liability insurance:-
Insurance shall be affected for all the contractor’s employees engaged in the performance
of his contract if any of the work is subject the contractor shall require the sub contractor
to provide workmen’s employees unless such employees are covered under the contractor’s
The DGVCL reserves the right to terminate this date of contract at any time during its
pendency without giving notice of termination or any reasons thereof.
The DGVCL will be entitled to deduct directly from the bills, to be paid to the contractor any
sum payable by you & which sum / sums the DGVCL is required to pay a principal employer
on account of your default in respect all liabilities referred to in above clauses.
9. PENALTY FOR DELAY:
The time limit allowed for carrying out the work as entered in the tender shall strictly be observed
by the contractor and shall be reckoned from the date on which the order to commence the work
is given to the contractor. The work shall throughout the stipulated period of contract proceed
with due diligence (time being deemed to be essence of contract) and for delay, the contractor
shall pay compensation, an amount equal to half percent (0.5%) per one week/part of week on
the work carried after time limit out completed or on contract amount of work or such smaller
amount as per the decision of the Competent Authority of the DGVCL plus GST at 18% on penalty
However, the total amount of compensation to be paid by the contractor, under the provision of
However, the total amount of compensation to be paid by the contractor, under the provision of
the clauses shall not exceed 10% of the amount of contract value as decided by the competent
authority of the DGVCL. The penalty will be invariably deducted from the bills of the contractor
and no refund will be given unless the competent authorities approve the reduction the reasons
for delay attributable to DGVCL as well as to party will be brought out clearly while putting the
proposal for waiver reduction in penalty
10. WATER SUPPLY CONNECTION:
The contractor has to make his own arrangement of water for construction activity at his own
cost. However, if possible, the water supply from line of DGVCL will be given at one mutually
agreed point as per the contractor’s request. Further distribution will have to be carried out by
the contractor as per his requirements and at his cost. Water shall be supplied on chargeable
basis and recovery for water charges shall be made at two percent of the cost of items as executed
in which the water supplied by Company is used & as certified by the EIC. If the contractor drilling
bore well at his own cost, in the premises of Company after getting necessary approval and using
water after providing his own pump then company will recover royalty at ¼% of the cost of the
items as executed in which the water is used.
11. ELECTRICITY CONNECTION:
The electric power can be obtained from Dakshin Gujarat Vij Company Ltd., at site at one mutually
agreed point, as a temporary connection (connection only) at free of cost. Further distribution will
have to be carried out by the contractor as per requirements at their own cost. The necessary
bills for consumption charges will be recovered as per the tariff rate of Dakshin Gujarat Vij
Company Ltd. from time to time as per Company’s rules.
Signature of Contractor
DGVCL Circle Office, Valsad
Name of work: ARC for scraping previously painted all type of surfaces and applying
new painting to all type of surfaces to various office buildings under jurisdiction of
Valsad Circle Office.
N Item Description Rate Unit
1 Removing any type of distemper/plastic 11.19 SMT
emulsion/exterior/wood paint by a washing and
scraping and sand papering the wall surface smooth
including necessary repairs to scratches complete.
2 Extra over item 1 for removing dry oil bound distemper 1.58 SMT
on ceilings and sloping roofs.
3 Scraping oil paint from steel and other metal surface 48.83 SMT
and making the surface even (with Hand Scraping.)
4 Wall painting (two coats) with plastic emulsion paint of 79.55 SMT
approved brand and manufacture on undecorated wall
surface to give an even shade including throughly
brushing the surface free from mortar droppings and
other foreign matter and sand papered smooth.
5 Extra over item 4 for every subsequent coat of wall 40.12 SMT
painting with plastic emulsion pain of approved brand.
6 Extra over item 4 for painting with plastic emulsion 5.36 SMT
paint of approved brand on ceilings and sloping roofs.
7 Extra over item 5 for every subsequent coat of painting 2.21 SMT
with plastic emulsion paint on ceiling and slopping roofs.
8 Applying priming coat over new steel and other metel 34.34 SMT
surface after and including preparing the surface by
throughly cleaning, oil,grease, dirt and other foreign
matter and scoured with brushes fine steel wood,
scrapers and sand paper with ready mixed priming paint
brushing red lead.
9 Painting two coats (excluding priming coat) on new 86.94 SMT
steel and other metal surface with enamel paint,
brushing, interior to give an even shade including
cleaning the surface an even shade including cleanicn
the surface of all dirt, dust and other foreign matter.
10 Painting one coats (excluding priming coat) on 54.5 SMT
previously painted steel and other metal surface with
enamel paint, brushing to give an even shade including
cleaning the surface of all dirt, dust and other foreign
11 Extra over item 9 and 10 for every subsequent coat of 39.38 SMT
12 Painting two coats (excluding priming coat) on external 25.05 SMT
surface of new rain water, soil, waste and vent pipes
and fittings with ready mixed bituminous brushing,
black, anticorrosive to give an even shade including
cleaning of all dirt, dust and other foreign matter. (C)
13 Appliying priming coat over new wood and wood based 39.69 SMT
surface after and including preparing the surface by
throughly cleaning oil, grease, dirt and other foreign
matter, sand papering and knotting. (B) Ready mixed
paint brushing wood primier pink.
14 Painting two coats (excluding priming coat) on new 87.42 SMT
wood and wood based surface with enamel paint,
interior to give an even shade including cleaning the
surface of all dirt, dust and other foreign matter sand
papering and stopping.
15 Painting one coats (excluding priming coat) on 54.81 SMT
previously painted wood and wood based surface with
enamel paint, to give an even shade including cleaning
the of all dirt, dust and other foreign matter.
16 Painting two coats (excluding priming coat) on new 104.27 SMT
wood and wood based surface with ready mixed paint,
brushing, oil, gloss, semi-gloss to give and even shade
including cleaning of all dust, dirt and other foreign
matter sand papering and stopping.
17 Finishing wall with weather proof exterior emulsion 113.4 SMT
paint on wall surface (two coats) to give an required
shape even shade after thoroughly brushing the surface
to remove all dirt, and remains of loose powdered
materials.etc complete
18 Applying two coats of Birla (white cement based) or 40.19 SMT
Asian (acrylic lapy- putty) or equivalent & two coats of
primer of approved brand and manufacture on new wall
surface to give an even shade including thoroughly
brushing the surface free from mortar dropping and
other foreign matter and sand papered smooth.
19 Painting lines, deashes, arrows, letters etc on roads, Air 5.67 SMT
fields and like in one coats with road marking paint,
brushing including cleaning the surface of all dirt, dust
and other foreign matter. (ii) Upto 10 cm in width
20 Varnishing two coats (excluding priming coat) on new 53.09 SMT
wood and wood based surface under coating with
flatting varnish and finished coat with varnish to give
an even surface including cleaning the surface of all
dirt, dust and sand papering so as to produce a smooth
21 Polishing with french polish on new wood and wood 123.48 SMT
based surface to give an even surface including
cleaning, the surface of all dirt, dust and sand papering
smooth and including a coat of wood filler.
22 Polishing with french polish on previously polished wood 82.38 SMT
and wood based surface to give an even surface
including cleaning, the surface of all dirt, dust and sand
papered smooth and including a coat of wood filler.
23 Appliying wax polish on new wood and wood surface 64.26 SMT
with bees wax polish in proportion of 2:1.5 :1:0.5 (2-
Bees wax : 1.5 Linseed oil : 1- Turpentine even surface
including cleaning the surface of all dirt dust and sand
papered smooth.
24 Appliying wax polish on previously wax polished wood 35.6 SMT
and wood based surface with bees wax polish in
proportion of 2:1.5 :1:0.5 (2-Bees wax : 1.5 Linseed
oil : 1- Turpentine : 0.5 varnish by weight to give an
even surface including cleaning the surface of all dirt
dust and sand papered smooth.
25 Writing letter or figures on any surface with black japan 3.47 Per Letter Per
paint (stops,comas, hyphens and the like not to be Cm/Ht.
measured and paid for separately) (ii) Indian
(Letters/Figures)
26 Extra over item 25 for using thick white paint instead of 0.07 Per Letter Per
black japan paint. (ii) Indian (Letters/Figures) Cm/Ht.
Total Amount (Excl. GST) in Rs.
Total Amount (Excl. GST) in Rs.
The rates are taken from R&B SOR 2024-25 for Valsad
Note:- Above rates are excluding GST. GST will be paid extra on above rates as per
prevailing Govt. rules.
Signature of Contractor
DGVCL Circle Office, Valsad
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
E- TENDER-ARC COLOUR.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .