Executive Engineer, Panchayat Road and Building Division, Morbi
Annual Rate 2026-27 Repairs to Various Road (Asphalt) in Morbi and Halvad Sub Division in Morbi District Under Juridician of Panchayat R&B Division-Morbi
323469
71 / 2026
Open
Civil - All
Works
Morbi
12 documents required · 12 mandatory
₹1,500
Executive Engineer, Panchayat Road and Building Division, MORBI
₹50,000
13 Jul 2026
13 Jul 2026
13 Jul 2026
23 Jul 2026
13 Jul 2026
BILL OF QUANTITY
Memorandum showing items of works to be carried out
Discription of Item (With Brief Specification and Quanti Rate In
Sr No.. Unit Amount
reference to book of Specification) ty Figures
1 Scarifying gravelled macadam or bitumen macedam 1.00 Sqm. 42.32
surface 6 cm to 10 cm depth including stacking useful
materiais on road side and disposing off remaining stuff.
2 Providing, laying, spreading and compacting stone 1.00 Cu.M 1724.07
aggregates of 45 to 90mm sizes to water bound macadam
specification including spreading in uniform thickness,
hand packing, rolling with smooth wheel roller 80-100 kN
in stages to proper grade and camber, applying and
brooming, stone screening/binding materials to fill-up the
interstices of coarse aggregate, watering and compacting
to the required density grading I as per Technical
Specification Clause
By Manual Means
3 Providing, laying, spreading and compacting stone 1.00 Cu.M 1581.66
aggregates of 40 to 63 mm sizes with all lead to water
bound macadam (W.B.M) specification including spreading
in uniform thickness, hand packing, rolling with smooth
wheel roller 80-100 kN in stages to proper grade and
camber, applying and brooming, stone screening/binding
materials to fill-up the interstices of coarse aggregate,
watering and compacting to the required density grading as
per Technical Specification Clause 405. By Machinary
4 Providing & Laying of Granular Sub-Base (G.S.B.) Grade-I 1.00 Cu.M 1235.23
C.B.R. not less than 30% by providing close graded
materials, consisting of B.T. crushed stone aggregates
below @ 40% combination , spreading in uniform layers
with motor grader on prepared surface, mixing by mix in
place method with front end loader at OMC, and
compacting with vibratory roller to achieve the desired
density, complete as per clause 401 Grading I
5 Providing, laying, spreading and compacting graded stone 1.00 Cu.M 1375.62
aggregate to Wet Mix Macadam (WMM) specification
including premixing the material with water at OMC in for
all leads & lifts, laying in uniform layers with mechanical
paver finisher in sub- base / base course on well prepared
surface and compacting with vibratory roller of 8 to
tonne capacity to achievethe desired density, complete as
per specifications and directions of Engineer-in-Charge.
6 Providing, laying, spreading and compacting graded stone 1.00 MT 764.23
aggregate to Wet Mix Macadam (WMM) specification
including premixing the material with water at OMC in for
all leads & lifts, laying in uniform layers with mechanical
paver finisher in sub- base / base course on well prepared
surface and compacting with vibratory roller of 8 to
tonne capacity to achievethe desired density, complete as
per specifications and directions of Engineer-in-Charge.
Payment done on Weight.
7 Preparing surface by Brushing with wire brushes for 1.00 Sqm 29.73
removing caked mud etc. sweeping with brooms and finally
fanning the cleaned surface with gunney bags to remove
all loose dirt etc.(i) Water bound macadam surface
8 Preparing surface by Brushing with wire brushes for 1.00 Sqm 17.88
removing caked mud etc. sweeping with brooms and finally
fanning the cleaned surface with gunney bags to remove
all loose dirt etc.(ii) Black top surface.
9 Providing and applying Primer Coat with bitumen emulsion 1.00 Sqm 61.51
RS on prepared surface of granular Base including
clearing of road surface and spraying primer at the rate of
0.75kg/sqm using mechanical means.
10 Providing, Laying & Rolling of Built up spray grout in one 1.00 Sqmt 237.09
layers using Bitumen tack coat at the rate 4.00Kg/10Sqm
on WBM surface ( As per IRC- 16)with spreading stone
aggregate at the rate of 0.50cum/10 Sqm. and spraying
bitumen at the rate of 15kg/ 10 sqm . for first layer and
spreading 0.13cum / 10 sqm. of key aggregate on top
accordance with the requirement of specification, including
cost of stone aggregate , bitumen, consolidation with roller,
necessary firewood, oil, lubricants, labour charges,
machineries, tools, etc. complete.
11 Providing, Laying & Rolling of Built up spray grout in one 1.00 Sqmt 226.33
layers using RS-1 Emulsion tack coat at the rate
2.50Kg/10Sqm with spreading stone aggregate at the rate
of 0.50cum/10 Sqm. and spraying bitumen at the rate of
15kg/10sqm . for first layer and spreading
0.13cum/10sqm.of key aggregate on top accordance with
the requirement of specification, including cost of stone
aggregaye , bitumen, consolidation with roller, necessary
firewood, oil, lubricants, Labour charges , machineries,
tools, etc. complete.
12 Providing & Laying bitumeneous grout 37.50 mm thick 1.00 MT 3205.98
using RS-1 Emulsion for tack coat at the rate of 4.00Kg/
10 sqm on WBM surface on Existing B.T.Surface and
using B.T.chips for required gradation with the asphalt of
grade VG-30 at the rate of 1.99 % i.e. 19.90 Kg./Mt by
weight of mix including heating and mixing in drum mix
plant, transporting the mix and spreading the same by
paver finisher and consolidation as per MOST
specification including cost of all Materials, fuel, labours,
tools and plants etc. using contractor's own drum mix plant
13 Providing & Laying bitumeneous grout 37.5 mm thick 1.00 MT 3063.85
using RS-1 Emulsion for tack coat at the rate of 2.50 Kg/
10 sqm on existing B.T. surface and using B.T.chips for
required gradation with the asphalt of grade VG-30 at the
rate of 1.99 % i.e. 19.90 Kg./Mt by weight of mix including
heating and mixing in drum mix plant, transporting the mix
and spreading the same by paver finisher and
consolidation as per MOST specification including cost of
all Materials, fuel, labours, tools and plants etc. using
contractor's own drum mix plant etc. complete.
14 Providing ,laying & rolling 37.50 mm thick compacted 1.00 MT 4184.99
Bitumeneous Macadam (B.M.) in one layer with B.T.
aggregates as per MoRT&H specification and RS-1
Emulsion for tack coat at the rate of 2.50 Kg /10Sqm.on
B.T.Surface & 2.50 Kg/10Sqm on WBM Surface (As per
IRC- 16) with mechanical sprayer and using bitumen
grade VG-30 for mixing with aggregate at the rate of
% i.e. 35.00 kg / MT of total mix, including heating and
mixing in Drum mix plant and spreading the same by Paver
finisher and consolidation with Vibratory roller including
necessary including cost of Hire charges, firewood, oil
Lubricants, labour charges,etc.by using contractor's own
Drum mix plant,machineries and equipment, tools etc.
complete in accordance with the requirement of
15 Providing and laying and rolling of compacted 20 mm thick 1.00 MT 6078.16
Mix Seal Surface (MSS) with B.T. aggregate as specified,
using asphalt grade VG-30 bitumen for mixing with
aggregate at the rate of 5.10% i.e. 51.00kg/ M.T. of total
mix in drum mix plant and transporting the mix material by
tippers and laying with paver finisher to the road level and
consolidation with vibratory roller including necessary
firewood, oil, lubricants , labour charges, using contractor's
own drum mix plant, machineries and equipment, tools
etc.including flushing of sand 0.30 cum/10sqm. etc
complete in accordance with the requirement of
specification Type-A
16 Providing & Laying 25mm thick SDBC using stone 1.00 MT 5542.75
Chipping and aggregate as per MORTH with tackcoat of
bitumen asphalt viscocity Grade VG-30 at 2.50Kg/10 Sqm
on BT surface and for mixing @ Rate 50.00 kg/M.T i.e
5.00% of tatul weight mix and Including heating the
aggregate and aspheit in Contineous batching drum mix
plant and lsid by paver finisher including consolidation with
vibratory roller including using all necessary equipment
tools, piants, fire wood, oil, kerosene, labour charges etc
complete (Using Contractor'S own Machinaries).
17 Providing, laying and rolling of 25 mm thick VG-30 Open 1.00 MT 4285.03
Graded Premix Bituminous Carpet with B.T. aggregate as
specified and using Emulsion RS-1 for tack coat at the rate
of 2.50kg/ 10sqm on BT .( As per IRC-16) and using
bitumen for mixing with aggregate at the rate of 3.36% i.e.
33.60 Kg/M.T. of total mix including heating and mixing in
drum mix pant, spreading the same with paver finisher and
consolidation with vibratory roller includng necessary
firewood, oil lubricants, labour charges etc. using
equipment, tool etc completed in accordance with the
requirement of specification
18 Providing and laying Seal Coat with B.T. aggregate as 1.00 MT 4796.57
specified using aggregate at the rate of 0.18 cum / 10 sqm.
and bitumen for mixing with aggregate at the rate of 4.5%
i.e. 45.00 kg/ M.T. of total mix, including heating and mixing
in drum mix plant and spreading the same by paver finisher
and consolidation with vibratory roller including necessary
using contractor's own drum mix plant, machineries and
equipment, tools etc. complete in accordance with the
requirement of specification
I/We am/are willing to carry out the work at… % above/below percent(Should be written in figures and words) of the
estimated rate mentioned above. Amount of my /our tender works out as under.
* Estimated Amount 4,46,002.74 * Estimated Amount
Put to tender Rs…………………… Put to tender Rs……………………
Deduct……..……..% Belowe Rs…………..….……. Add……..……..% Above Rs…………..….…….
In words………………….……………… In words………………….………………
Note :- 1.The Contractor shall exhibit a board with detailed specification and details of work as directed by the
Engineer-In-Charge for which no extra payment shall be made.
Note :- 2.The labour cess will be deducted as per prevailing rules i.e. 1% of the work done.
Note :- 3.GST and Income tax TDS will be deducted at a source while making payments of bills
Note :- 4.In all R.C.C. Items in Rate Analysis Standard Cement Consumption has been taken as per Govt. G.R.:
PRC-10/2017 Cement Consumption/16/C Date:11/05/2017 as stated in S.O.R. therefore in R.C.C. items
where there is a change as per actual mix design the cost of difference of cement consumption have been
deducted from the rate of original item at the rate of input rate mentioned in all the tender.
Signature of Contractor
Note:- Amount Rs.0 of Dismentalled materials Shall be Recovered from 1st RA Bill of Contractor at Once.
Deputy Executive Engineer Executive Engineer
Panchayat R.& B. Sub Division Panchayat R.& B. Division
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
1 SBD Annual Rate 2026-27 Asphalt Work Morbi.pdf
2 sarato Annual Rate Asphalt 2026-27.pdf
3 Spe Index Annual Rate Asphalt 2026-27.pdf
3.1 specification Annual Rate Asphalt 2026-27_compressed.pdf
4 Sch -B.pdf
5 Circular Annual Rate Asphalt 2026-27_compressed.pdf
6 Test Shedual Annual Rate Asphalt 2026-27.pdf
Corrigendum annual Rate.pdf
CORRIGENDUM
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .