Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹15.6 LAccepted-AOC | 1 | Accepted-AOC 1 | |
| 2 | 2₹15.7 L+₹15,305.18 (0.98%)Rejected-AOC | 2 | Rejected-AOC 2 |
Tender Value
₹18.7 L
EMD Value
₹37,500
Closing Date
12 Feb 2024, 12:30 pmClosed
Executive Engineer
117 Civil Lines Bareilly
RECONSTRUCTION OF V.R.B. BOX CULVERT FOR BAREILLY DY KM. 23.450
2024_UPIDC_890958_1
09/EE/RCD/2023-24
Open Tender
Civil Works
Item Rate
30 days
BAREILLY
Please refer Tender documents.
2 documents required · 2 mandatory
₹354
₹37,500
Yes
BAREILLY
15 Jun 2024
7 Feb 2024
12 Feb 2024
7 Feb 2024
12 Feb 2024
7 Feb 2024
7 Feb 2024
Amount
Earth work in foundation in dry soil including lift up to 1.50 M & lead up to 30 M back filling, waterring and ramming of excavated earth into the trenches and disposal of surplus earth as directed by the Engineer-In-Charge.
Shuttering for C.C. blocks and concrete including cost of shuttering, material, labour and T&P required for proper completion of work etc.
Supplying and Laying C.C.1:2:4 (M-15) with Cement, coarse sand & 20 mm down graded stone grit including cost of all material, labour and T&P etc. complete but excluding cost of shuttering.
Centering & Shuttering For R.C.C. work including cost of centering & shuttering material, labour and T&P required for proper completion of work etc.
HYSD Fe-500 Steel Bar as reinforced concrete wrought to required shape as necessary including bending for proper completion of work and including supply of all steel and wastage and over lapping & hooks.
Laying C.C. 1:1.2 Mix (M-25) with Cement, coarse sand & 20 mm down graded stone grit including cost of all material, labour and T&P etc. complete but excluding cost of Centering, shuttering& Reinforcement.
Laying R.C.C. 1:1:2 Design Mix (M-25) with Cement, coarse sand & 20 mm down graded stone grit including cost of all material, labour and T&P etc. complete but excludiing cost of Centering, shuttering & Reinforcement.
Supplying and Laying Tarfelt sheet below aproach slab as paper bearing including cost of all material labour and T&P required for proper completion of work.
Supplying & Fixing 100 MM Dia PVC pipe for Drain Spouts including cost of all material labour and T&P required for proper completion of work.
Providing weep holes in structure including cost of all material (100 mm dia P.V.C. pipe etc.), labour and T&P etc. required for proper completion of work.
Dismantling Brickwork or stone work and cement concrete in cement mortar and including stacking of material with in a distance of 60 m as per direction of Engineer-In-Charge.
Earth work in back filling including lift 1.5 m &lead up to 30m with cost of driver/assit driver,POL, mantinance of machine,contractor profit taxes but excluding leveling, dressing& normal compaction by JCB.
JABBAR AHMAD
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .