Tender Value
₹7.3 L
EMD Value
₹7,346
Closing Date
25 May 2026, 4:35 pmClosed
Executive Engineer, RWS&S Division, Gudivada
Executive Engineer
Construction of Community Sanitary Complex at Velugu Office under the DRDA /Velugu-SERP Department at Bantumilli Village of Bantumilli Mandal located at MPDO office Bantumilli 3Uints. Est Cost Rs:9.00 lakhs
935882
05/TO/2026-2027, DT:08-05-2026
OPEN - NCB
Water Supply
KRISHNA
6 documents required · 6 mandatory
₹261
₹7,346
9 Jun 2026
21 May 2026
21 May 2026
Earth work excavation and depositing on bank with an initial lead and lift in sandy soils as per SS 20B for foundation.
CC(1:4:8) mix using 40mm HBG metal including cost and conveyance of all materials and all labour charges etc complete.
Vibrated Reinforced Cement concrete (1:2:4) using 20 mm HBG chips including cost and conveyance of all materials and all labour charges etc.but excluding cost of steel and its fabrication charges For Columns Footing
Vibrated Reinforced Cement concrete (1:2:4) using 20 mm HBG chips including cost and conveyance of all materials and all labour charges etc.but excluding cost of steel and its fabrication charges Columns below GL and aboce GL
Vibrated Reinforced Cement concrete (1:2:4) using 20 mm HBG chips including cost and conveyance of all materials and all labour charges etc.but excluding cost of steel and its fabrication charges Allround Out side A/R plinth beam and Allround In side A/R plinth beam
Vibrated Reinforced Cement concrete (1:2:4) using 20 mm HBG chips including cost and conveyance of all materials and all labour charges etc.but excluding cost of steel and its fabrication charges For Lintels
Vibrated Reinforced Cement concrete (1:2:4) using 20 mm HBG chips including cost and conveyance of all materials and all labour charges etc.but excluding cost of steel and its fabrication charges For Roof Beam
Vibrated Reinforced Cement concrete (1:2:4) using 20 mm HBG chips including cost and conveyance of all materials and all labour charges etc.but excluding cost of steel and its fabrication charges For Roof slab for 115 mm thick
Brick work in CM (1:6) mix using country bricks from approved source including cost and conveyance of all materials and all labour charges etc complete for Foundation & basement.(Per 1 cum)
Cost and supply of steel FE 415 including fabrication charges and labour charges et complete
Accoproof Plastering in CM(1:3) mix 12 mm thick including all materials and all labour charges etc complet For Slab Top
Plastering in CM (1:5) mix 12 mm thick includingc/c of all materials and all labour charges et complete.
Flooring with ceramic tiles 8 to 10mm thick 1st quality non skid floor tiles of scratch free of nano finish of size 600x600mm of IS: 13711,13712,13630 of any colour set over a base coat of CM (1:8) 12mm thick over already laid cement concrete bed including neat cement slurry at 3.30 kgs per sqm and jointing neatly with white cement paste to full depth of slabs laid on already laid cement concrete bed set over base coat of CM (1:8) 12mm thick including neat cement slurry spread at 3.30 kgs per sqm and jointing to full depth of ceramic tiles including cost and conveyance of all materials and labour charges, filling joints neatly, dressing of flooring stones, etc., (IC 7-6)
Providing skirting to internal walls with vitrified tiles length equal to flooring stones, set over base coat of CM (1:5) 12 mm thick with cement slurry of honey like consistency spread at the rate of 3.30 kgs per sqm and jointed with white cement paste mixed with pigment of matching shade to full depth, including cost of all materials like tiles, cement, sand and water etc., complete including seigniorage charges, etc., complete for finished item of work, but excluding the cost of conveyance of all materials
Painting with Emlusion paint two coats including cost and conveyance of all materials and all labour charges etc complete
Cost and supply of 0.90 M dia RCC Well rings for Leach pit
Cost and supply of 1.00 M RCC Well ring Caps
Cost and supply of doors with solid core membrane flush doors using rigid PVC membrane of 0.3 mm thick of different elegant shades doors mat-01378
Supply of European water closet of 1st quality conforming to IS 2566-part-2-1973 of white glazed with P Trap ( BMW-D.13,SSR 2025-2026
Urinal Bowl Supplying white glazed flat black Bowl urinals of size 440mmx 265mmx 315 mm
Wash Hand Basin Supply of ceramic Square glossy finish hand wash basin of size :550x400mm 15mm nominal bore chromium plated Pillar tap of 1st quality Indian make 400 gms & Double CP Pillar ( BMW-D.26,SSR 2025-26 )
Providing and Placing on terrace (at all floor levels)polyethylene water storage tank with double layer approved brand and manufacture with cover and suitable locking arrangement and making necessary holes for inlet and outlets and overflow pipes but without fittings and base support for tank as per ( BMW-G.01,SSR 2025-26)
Labour charges for fixing of terrace (at all floor levels)polyethylene water storage tank ( BMW-G.02,SSR 2021-22)
110 mm PVC Pipe 6 Kg/cm2
75 mm PVC Pipe 6 Kg/cm2
Bib Taps 12.7mm Long Body
Earth work excavation and depositing on bank with an initial lead and lift in sandy soils as per SS 20B for foundation.
CC(1:4:8) mix using 40mm HBG metal including cost and conveyance of all materials and all labour charges etc complete.
Vibrated Reinforced Cement concrete (1:2:4) using 20 mm HBG chips including cost and conveyance of all materials and all labour charges etc.but excluding cost of steel and its fabrication charges For Columns Footing
Vibrated Reinforced Cement concrete (1:2:4) using 20 mm HBG chips including cost and conveyance of all materials and all labour charges etc.but excluding cost of steel and its fabrication charges Columns below GL and aboce GL
Vibrated Reinforced Cement concrete (1:2:4) using 20 mm HBG chips including cost and conveyance of all materials and all labour charges etc.but excluding cost of steel and its fabrication charges Allround Out side A/R plinth beam and Allround In side A/R plinth beam
Vibrated Reinforced Cement concrete (1:2:4) using 20 mm HBG chips including cost and conveyance of all materials and all labour charges etc.but excluding cost of steel and its fabrication charges For Lintels
Vibrated Reinforced Cement concrete (1:2:4) using 20 mm HBG chips including cost and conveyance of all materials and all labour charges etc.but excluding cost of steel and its fabrication charges For Roof Beam
Vibrated Reinforced Cement concrete (1:2:4) using 20 mm HBG chips including cost and conveyance of all materials and all labour charges etc.but excluding cost of steel and its fabrication charges For Roof slab for 115 mm thick
Brick work in CM (1:6) mix using country bricks from approved source including cost and conveyance of all materials and all labour charges etc complete for Foundation & basement.(Per 1 cum)
Cost and supply of steel FE 415 including fabrication charges and labour charges et complete
Accoproof Plastering in CM(1:3) mix 12 mm thick including all materials and all labour charges etc complet For Slab Top
Plastering in CM (1:5) mix 12 mm thick includingc/c of all materials and all labour charges et complete.
Flooring with ceramic tiles 8 to 10mm thick 1st quality non skid floor tiles of scratch free of nano finish of size 600x600mm of IS: 13711,13712,13630 of any colour set over a base coat of CM (1:8) 12mm thick over already laid cement concrete bed including neat cement slurry at 3.30 kgs per sqm and jointing neatly with white cement paste to full depth of slabs laid on already laid cement concrete bed set over base coat of CM (1:8) 12mm thick including neat cement slurry spread at 3.30 kgs per sqm and jointing to full depth of ceramic tiles including cost and conveyance of all materials and labour charges, filling joints neatly, dressing of flooring stones, etc., (IC 7-6)
Providing skirting to internal walls with vitrified tiles length equal to flooring stones, set over base coat of CM (1:5) 12 mm thick with cement slurry of honey like consistency spread at the rate of 3.30 kgs per sqm and jointed with white cement paste mixed with pigment of matching shade to full depth, including cost of all materials like tiles, cement, sand and water etc., complete including seigniorage charges, etc., complete for finished item of work, but excluding the cost of conveyance of all materials
Painting with Emlusion paint two coats including cost and conveyance of all materials and all labour charges etc complete
Cost and supply of 0.90 M dia RCC Well rings for Leach pit
Cost and supply of 1.00 M RCC Well ring Caps
Cost and supply of doors with solid core membrane flush doors using rigid PVC membrane of 0.3 mm thick of different elegant shades doors mat-01378
Supply of European water closet of 1st quality conforming to IS 2566-part-2-1973 of white glazed with P Trap ( BMW-D.13,SSR 2025-2026
Urinal Bowl Supplying white glazed flat black Bowl urinals of size 440mmx 265mmx 315 mm
Wash Hand Basin Supply of ceramic Square glossy finish hand wash basin of size :550x400mm 15mm nominal bore chromium plated Pillar tap of 1st quality Indian make 400 gms & Double CP Pillar ( BMW-D.26,SSR 2025-26 )
Providing and Placing on terrace (at all floor levels)polyethylene water storage tank with double layer approved brand and manufacture with cover and suitable locking arrangement and making necessary holes for inlet and outlets and overflow pipes but without fittings and base support for tank as per ( BMW-G.01,SSR 2025-26)
Labour charges for fixing of terrace (at all floor levels)polyethylene water storage tank ( BMW-G.02,SSR 2021-22)
110 mm PVC Pipe 6 Kg/cm2
75 mm PVC Pipe 6 Kg/cm2
Bib Taps 12.7mm Long Body
Earth work excavation and depositing on bank with an initial lead and lift in sandy soils as per SS 20B for foundation.
CC(1:4:8) mix using 40mm HBG metal including cost and conveyance of all materials and all labour charges etc complete.
Vibrated Reinforced Cement concrete (1:2:4) using 20 mm HBG chips including cost and conveyance of all materials and all labour charges etc.but excluding cost of steel and its fabrication charges For Columns Footing
Vibrated Reinforced Cement concrete (1:2:4) using 20 mm HBG chips including cost and conveyance of all materials and all labour charges etc.but excluding cost of steel and its fabrication charges Columns below GL and aboce GL
Vibrated Reinforced Cement concrete (1:2:4) using 20 mm HBG chips including cost and conveyance of all materials and all labour charges etc.but excluding cost of steel and its fabrication charges Allround Out side A/R plinth beam and Allround In side A/R plinth beam
Vibrated Reinforced Cement concrete (1:2:4) using 20 mm HBG chips including cost and conveyance of all materials and all labour charges etc.but excluding cost of steel and its fabrication charges For Lintels
Vibrated Reinforced Cement concrete (1:2:4) using 20 mm HBG chips including cost and conveyance of all materials and all labour charges etc.but excluding cost of steel and its fabrication charges For Roof Beam
Vibrated Reinforced Cement concrete (1:2:4) using 20 mm HBG chips including cost and conveyance of all materials and all labour charges etc.but excluding cost of steel and its fabrication charges For Roof slab for 115 mm thick
Brick work in CM (1:6) mix using country bricks from approved source including cost and conveyance of all materials and all labour charges etc complete for Foundation & basement.(Per 1 cum)
Cost and supply of steel FE 415 including fabrication charges and labour charges et complete
Accoproof Plastering in CM(1:3) mix 12 mm thick including all materials and all labour charges etc complet For Slab Top
Plastering in CM (1:5) mix 12 mm thick includingc/c of all materials and all labour charges et complete.
Flooring with ceramic tiles 8 to 10mm thick 1st quality non skid floor tiles of scratch free of nano finish of size 600x600mm of IS: 13711,13712,13630 of any colour set over a base coat of CM (1:8) 12mm thick over already laid cement concrete bed including neat cement slurry at 3.30 kgs per sqm and jointing neatly with white cement paste to full depth of slabs laid on already laid cement concrete bed set over base coat of CM (1:8) 12mm thick including neat cement slurry spread at 3.30 kgs per sqm and jointing to full depth of ceramic tiles including cost and conveyance of all materials and labour charges, filling joints neatly, dressing of flooring stones, etc., (IC 7-6)
Providing skirting to internal walls with vitrified tiles length equal to flooring stones, set over base coat of CM (1:5) 12 mm thick with cement slurry of honey like consistency spread at the rate of 3.30 kgs per sqm and jointed with white cement paste mixed with pigment of matching shade to full depth, including cost of all materials like tiles, cement, sand and water etc., complete including seigniorage charges, etc., complete for finished item of work, but excluding the cost of conveyance of all materials
Painting with Emlusion paint two coats including cost and conveyance of all materials and all labour charges etc complete
Cost and supply of 0.90 M dia RCC Well rings for Leach pit
Cost and supply of 1.00 M RCC Well ring Caps
Cost and supply of doors with solid core membrane flush doors using rigid PVC membrane of 0.3 mm thick of different elegant shades doors mat-01378
Supply of European water closet of 1st quality conforming to IS 2566-part-2-1973 of white glazed with P Trap ( BMW-D.13,SSR 2025-2026
Urinal Bowl Supplying white glazed flat black Bowl urinals of size 440mmx 265mmx 315 mm
Wash Hand Basin Supply of ceramic Square glossy finish hand wash basin of size :550x400mm 15mm nominal bore chromium plated Pillar tap of 1st quality Indian make 400 gms & Double CP Pillar ( BMW-D.26,SSR 2025-26 )
Providing and Placing on terrace (at all floor levels)polyethylene water storage tank with double layer approved brand and manufacture with cover and suitable locking arrangement and making necessary holes for inlet and outlets and overflow pipes but without fittings and base support for tank as per ( BMW-G.01,SSR 2025-26)
Labour charges for fixing of terrace (at all floor levels)polyethylene water storage tank ( BMW-G.02,SSR 2021-22)
110 mm PVC Pipe 6 Kg/cm2
75 mm PVC Pipe 6 Kg/cm2
Bib Taps 12.7mm Long Body
Seven Hundred Thirty Four Thousand Five Hundred Eighty-Eight Only
stage.html
html • 0.01 MB
aoc.html
html • 0.01 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.01 MB
VOLUME I.doc
TENDER_DOCUMENT • 0.36 MB
Bantumilli MPDO.xlsx
TENDER_DOCUMENT • 0.08 MB
Technical Specifications vol B.doc
TENDER_DOCUMENT • 0.41 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .