Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹28.2 LAccepted-AOC | L1 | Accepted-AOC THE LOWEST BIDDER | |
| 2 | L2₹28.5 L+₹33,400 (1.19%)Rejected-Finance B 39 UPPER GROUND FATEH NAGAR NEW DELHI 110018 | WEST | DELHI | 110018 | L2 | Rejected-Finance OTHER THAN THE LOWEST BIDDER | |
| 3 | L3₹29.0 L+₹87,140.60 (3.09%)Rejected-Finance | L3 | Rejected-Finance OTHER THAN THE LOWEST BIDDER | |
| 4 | L4₹29.9 L+₹1.7 L (6.11%)Rejected-Finance | L4 | Rejected-Finance OTHER THAN THE LOWEST BIDDER | |
| 5 | L5₹30.9 L+₹2.8 L (9.85%)Rejected-Finance | L5 | Rejected-Finance OTHER THAN THE LOWEST BIDDER |
Tender Value
Refer Docs
EMD Value
₹80,000
Closing Date
30 Jun 2021, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
GE (AF) CHILODA
VAYU SHAKTI NAGAR CHILODA- 382042
OUTSOURCING SERVICES FOR OPERATION OF ELECTRIC SUPPLY INSTALLATIONS AT VAYU SHAKTI NAGAR AT AF STN CHILODA
2021_MES_441006_2
8911/21-22/E8
Open Tender
Electrical and Maintenance Works
Item Rate
334 days
Chiloda
AS PER NIT AND TENDER DOCUMENTS
7 documents required · 7 mandatory
₹500
Yes
GE (AF) CHILODA
₹80,000
Yes
17 Jul 2021
16 Jun 2021
2 Jul 2021
16 Jun 2021
30 Jun 2021
18 Jun 2021
60 days
Amount
Provisioning of skilled electrician for management of Take Over Point, Main receiving station and Sub-station No.01 at HQ SWAC Chiloda comprising of all incoming and outgoing 11 KV HT electric supply system and LT distribution system from MRS and S/Stn No.1, 11 KV 2/4 pole structure with GODs, VCB panels, RMU's, step down transformers, Voltage Stabilizer, Change-over switches, APFC panel, Power Disturibution Board etc. installed at different locations feeded from MRS and S/STN No.1 for round the clock (03 shifts for 08 hrs Each) at Vayu Shakti Nagar Chiloda complete all as specified and directed by Eng-In-Charge.
Provisioning of skilled electrician for Management of E/S Sub-station No.02 and E/S Sub Stn at centralised AC Plant at HQ SWAC comprising of all incoming and outgoing 11 KV HT electric supply system and LT distribution system from S/STN No. 2, 11 KV 2/4 pole structure with GODs, VCB panel, step down transformers, Voltage Stabilizer, Change-over switches, APFC panel, Power Disturibution Board etc. installed at different locations near SWAC HQ pump house feeded from Sub Stn No. 2 and E/S Sub Stn at Cent AC Plant HQ SWAC for round the clock (03 shifts for 08 hrs Each) at Vayu Shakti Nagar Chiloda complete all as specified and directed by Eng-In-Charge.
Provisioning of skilled electrician for Management of E/S Sub-station No. 03, 04 and 05 at STP, Type-II and Type-III Qtrs and DSC/ NCE's Bldg comprising of all incoming and out going HT/ LT Electric supply, 11 KV 2/4 pole structure with GODs, VCB panels, step down Transformers, Voltage Stabilizer, Change-over switches, Operating the RMU's, APFC panel, Power Disturibution Boards feeded from Sub Stn No.3, 4 and 5 for round the clock (03 shifts for 08 hrs Each) at Vayu Shakti Nagar Chiloda complete all as specified and directed by Eng-In-Charge.
Rates required to be quoted for executing the work as described in Serial Item Nos. 1.00 to 3.00 above:-
Minimum Wages per person (Skilled Labour) as per latest MOL&E Rates/ existing rules.
Provisioning of Semi-skilled fitter grade mechanic (FGM) for management and operation of DG set 200 KVA, installed at swimming pool sub station behind main HQ SWAC, house for one shift of 08 Hours per day complete all as specified and directed by Eng-in-Charge.
Rate required to be quoted for executing the work as described in Serial No. 5.00 here-in-before:-
Minimum Wages Per Person (Semi-Skilled Labour) as per latest MOL&E Rates/ existing rules.
Note for BOQ Item Nos. 4.01 and 6.01 above:- The rate quoted by the tenderer shall include contrubution towards Employees Provident Fund (EPF), Employees State Insurance Contribution (ESIC), Contribution of Bounus, GST, Over head & profit and Labour Welfare Cess (LWC) as applicable, as per existing rules.
Notes for BOQ Item Nos. 1.00 to 3.00 and 5.00 above:-
(i) Electrician hand tools, tester, Meggar, test lamp, safety shoes , Helmet and hand gloves, instulation Tape,Cotton waste and all tools DO rod, spanner set, tool kit, tool bag etc. Hand gloves suitable for working pressure 11000 Volts and tested up to 22000 Volts and pressure guage clamp meter will be provided by the contractor without any extra cost.
(ii) The contractor should always keep in mind that it is only the services of these contract labours is outsourced & not manpower.So providing reliever will be sole responsibility of contractor.
(iii) DHPP for running of DG set shall be issued by department all as directed by Engineer-in-Charge.
(iv) Rates quoted shall be including minor repair as per daily weekly or monthly check.
(v) Electrcity as required shall be made available to the contractor free of cost by department.
(vi) Contractor shall also maintain the DG daily log sheet for running of DG set as per format and all as specified and directed by Engineer-in-Charge.
(vii) Cleaning of Substation/ pump house premises and surrounding the area inside fencing/ compound wall complete all responsibility of contractor.
(viii) Emergency light will be provided by the contractor during night hours without any extra cost.
(ix) All safety precautions as per IE rules should be strictly followed by contracted employees & department shall not be held responsible for any untowards incident.
(x) Attendence Register of Staff Employed will be maintained by JE E/M. If any labour found absent, necessary penalty/ recovery will be made by Engineer-in-Charge as per CA clause.
(xi) The contractor should always keep in mind that it is only the services of these contract labours is outsourced & not manpower. So providing reliever will be sole responsibility of contractor.
(xii) Qualification & experience certificate of contracted labours should be produced by contractor. (xiii) Electrician (Skilled)/ FGM(Semi skilled) should have minimum Qualification ITI or 4 years Experiance. (a) One Electrician per shift for three shifts in a day shall be required to maintain/ checking the installations etc all as directed and specified by Eng in charge. (b) The Electrician Personal shall be provided with protective clothing & shall wear them while operating the plant. In case of any accident/ Injury, fatal or partial disability, the cotractor shall be solely responsible for setting all Claims/ Compensation. Department will have a right to recover any sum indicated/ Claimed by labour Commissioner/ Court directive. GE will however ensure that contractor has provided all adequate & required means to the workmen and contractor shall get his personnel insured.
(xiv) Contractor has to produce Photo ID of the staff employed with security pass number issued by Main Guard Air force Station. (xiv) Staff employed will be given 2 sets of uniform. (xv) GST/ EPF paid certificate should be enclosed with RAR. (xvi) It should be ensured by contractor that minimum labour charges are paid as per the minimum fare wages act and wages register duly signed by concerned labour will be produced alongwith RAR by the contractor. If rates quoted by the L1 bidder are less than Schedule of Minimum Fare Wages, then that bidder will not be considered bonafide and action will be taken as per the instructions of Accepting Officer. (xvii) The payment to every staff employed on work shall be made in the Aadhaar linked bank account through account payee cheque only. (xviii) If the quoted amount is less than the estimated cost of the work, then the lowest bidder will have to deposit FDR/ BGB in favour of Accepting Officer within 07 days of opening of Financial Bid for the difference in estimated cost & quoted amount. In case the said FDR/ BGB is not submitted within stipulated period as mentioned above, the contractor shall be banned for 06 months and his bid will be rejected. FDR/ BGB shall be released only after satisfactory completion of work including defect liability period of contract whenever applicable.
Abhishek Enterprises
nirman construction
partechengineers
Dighard Electricals
ABHILASH ENTERPRISES
GAURAV ASSOCIATES
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .