Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹39.3 LAccepted-AOC THOTTASSERI HOUSE ALIPPARAMBA POST MALAPPURAM 679357 | MALAPPURAM | MALAPPURAM | KERALA | 679357 | ₹39.3 L | L1 | Accepted-AOC L1 Accepted for further proceedings |
| 2 | L2₹40.1 L+₹78,642.84 (2.00%)Rejected-Finance | ₹40.1 L+₹78,642.84 (2.00%) | L2 | Rejected-Finance L2 |
| 3 | L3₹40.3 L+₹98,303.36 (2.50%)Rejected-Finance | ₹40.3 L+₹98,303.36 (2.50%) | L3 | Rejected-Finance L3 |
| Sl No | Description | Qty | Unit | Mohammed Rafeeq T. L1 | Shameem L2 | SALEEM A K L3 |
|---|---|---|---|---|---|---|
| 1.00TARRING | ||||||
| 1.01 | 3.2
Preparation of Foundation for Embankment Scarifying Existing Bituminous Surface to a Depth of 150 mm by Mechanical Means Scarifying the existing bituminous roadsurface to a depth of 150 mm and disposal of scarified material with a lift upto 3 mand lead upto 1000 m as per Technical Specification Clause 301.4. | 1,925 | sqm | 14.7 ₹28,297.5 Lowest | 14.99 ₹28,863.45 | 15.07 ₹29,005.9 |
| 1.02 | 3.5.2
Excavation in Soil with Dozer with lead upto 100 m Excavation for roadway in soilby mechanical means including cutting and pushing the earth to site of embankmentupto a distance of 100 m, including trimming bottom and side slopes in accordancewith requirements of lines, grades and cross-sections | 350.95 | cum | 65.78 ₹23,085.49 Lowest | 67.1 ₹23,547.34 | 67.43 ₹23,662.8 |
| 1.03 | 4.1.A.1
Granular Sub-base with Well Graded Material (Table 400.1) (A) By Mix in PlaceMethod Construction of granular sub-base by providing well graded material,spreading in uniform layers with motor grader on prepared surface, mixing by mix inplace method with rotavator at OMC, and compacting with smooth wheel roller toachieve the desired density, complete as per Technical Specification Clause 401. (i)For Grading I Material | 320.52 | cum | 3,077.04 ₹9,86,252.86 Lowest | 3,138.58 ₹10,05,977.98 | 3,153.97 ₹10,10,909.18 |
| 1.04 | 4.9
Wet Mix Macadam Providing, laying, spreading and compacting graded stoneaggregate to wet mix macadam specification including premixing the material withwater at OMC in mechanical mixer (Pug Mill), carriage of mixed material by tipper tosite, laying in uniform layers in sub-base/base course on a well prepared sub-base and compacting with smooth wheel roller of 80 to 100kN weight to achieve the desireddensity including lighting, barricading and maintenance of diversion, etc as perTables 400.11 & 400.12 and Technical Specification Clause 406. By MechanicalMeans with 1 km lead | 162.75 | cum | 3,449.92 ₹5,61,474.48 Lowest | 3,518.92 ₹5,72,703.91 | 3,536.17 ₹5,75,511.34 |
| 1.05 | OD134139/2025-2026 Modified 75.8.1 : Providing Plain cement concrete for road work CC 1:2:4 (1 cement:2 fine aggregate: 4 course aggregate) with out form work laid to required slope andcamber in panels (@ 3 m c/c) as required including compaction, finishing andtamping etc .complete. Max. size of course aggregate not exceeding 25mm , mixed in
concrete mixer etc complete as per specification (i) Nominal mix (1:2:4) | 157.77 | cum | 8,446.62 ₹13,32,623.24 Lowest | 8,615.55 ₹13,59,275.64 | 8,657.79 ₹13,65,938.9 |
| 1.06 | 5.1.1a
Prime Coat :- Low porosity Providing and applying primer coat with bitumenemulsion (SS-1) on prepared surface of granular base including cleaning of roadsurface and spraying primer at the rate of 0.70-1.0 kg/sqm using mechanical means as per Technical Specification Clause 502 | 1,085 | sqm | 75.89 ₹82,340.65 Lowest | 77.41 ₹83,987.68 | 77.79 ₹84,398.9 |
| 1.07 | 5.2.3a
Tack Coat Providing and applying tack coat with Bitumen emulsion (RS-1) usingemulsion distributor at the rate of 0.25 to 0.30 kg per sqm on the prepared granularsurfaces treated with primer & cleaned with Hydraulic broom as per Technical Specification Clause 503 | 1,085 | sqm | 16.39 ₹17,783.15 Lowest | 16.72 ₹18,139.03 | 16.8 ₹18,228 |
| 1.08 | 5.5.A.1a
Modified Penetration Macadam 50 mm thick using Bitumen S-65 Construction ofpenetration macadam over prepared base by providing a layer of compacted crushedcoarse aggregate using chips spreader with alternate applications of bituminousbinder and key aggregates and rolling with a three wheel 80-100 kN static roller toachieve the desired degree of compaction as per Technical Specification Clause 506. | 340.57 | sqm | 295.49 ₹1,00,635.03 Lowest | 301.4 ₹1,02,647.8 | 302.88 ₹1,03,150.82 |
| 1.09 | 5.2.1a
Tack Coat Providing and applying tack coat with Bitumen emulsion (RS-1) usingemulsion distributor at the rate of 0.20 to 0.25 kg per sqm on the prepared bituminoussurface cleaned with Hydraulic broom as per Technical Specification Clause 503. | 1,732.5 | sqm | 13.73 ₹23,787.23 Lowest | 14.01 ₹24,263.66 | 14.07 ₹24,381.47 |
Tender Value
₹39.3 L
EMD Value
₹50,000
Closing Date
2 Oct 2025, 11:00 amClosed
Manager (PED)
STEEL INDUSTRIALS KERALA LTD.ATHANI P.O.THRISSUR- 680 581
Improvements Works of Village High School Road at Aliparamba Grama panchayth (Project No.23665)
2025_SILK_801888_1
SILK/PED/S-103/2025-26/1656
Open Tender
Miscellaneous Works
Item Rate
300 days
Aliparamba
As per the tender documents
6 documents required · 6 mandatory
₹2,950
₹50,000
Yes
1 Aug 2026
25 Sept 2025
3 Oct 2025
25 Sept 2025
2 Oct 2025
25 Sept 2025
25 Sept 2025 - 2 Oct 2025
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .