Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹58.0 LAdmitted-Fee/PreQual/Technical/Finance | ₹58.0 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹62.4 L+₹4.4 L (7.52%)Admitted-Fee/PreQual/Technical/Finance | ₹62.4 L+₹4.4 L (7.52%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L3₹63.0 L+₹5.0 L (8.59%)Admitted-Fee/PreQual/Technical/Finance | ₹63.0 L+₹5.0 L (8.59%) | L3 | Admitted-Fee/PreQual/Technical/Finance |
| 4 | L4₹63.5 L+₹5.5 L (9.43%)Admitted-Fee/PreQual/Technical/Finance | ₹63.5 L+₹5.5 L (9.43%) | L4 | Admitted-Fee/PreQual/Technical/Finance |
| Sl No | Description | Qty | Unit | Nirappel L2 | ERNAKULAM DISTRICT LABOUR CONTRACTING COOPERATIVE SOCIETY LIMITED L3 | N A SUBAIR L1 | kothamangalam labour contract co-operative society ltd no. E1325 L4 |
|---|---|---|---|---|---|---|---|
| 1.00Reactive maintenance (Initial rectification work ) | |||||||
| 1.00 | 55.4:Supplying and stacking 36mm size hard broken stone in standard heaps for measurement. | 78.96 | cum | 2,305.4 ₹1,82,036.69 | 2,328.43 ₹1,83,855.16 | 2,143 ₹1,69,213.42 Lowest | 2,346 ₹1,85,242.51 |
| 1.00 | 55.8.a:Filling up pot holes (cut and formed to regular shapes and all loose and defective materials removed) after supplying a prime coat of hot bitumen using 36mm departmental broken stone and compacting with power roller to get a compact surface. | 78.96 | cum | 5,724.5 ₹4,52,012.24 | 5,781.68 ₹4,56,527.23 | 5,323 ₹4,20,309.4 Lowest | 5,826 ₹4,60,026.79 |
| 1.00 | 5.2.a:Providing and applying tack coat with bitumen emulsion( RS) using emulsion pressure distributor at the rate of 0.20 - 0.30 kg per sqm on the prepared bituminous surface cleaned with mechanical broom. | 13,690 | sqm | 16.97 ₹2,32,319.3 | 17.14 ₹2,34,646.6 | 15 ₹2,05,350 Lowest | 17 ₹2,32,730 |
| 1.00 | OD275017/2025-2026:OD129035/2021-2022 Providing , laying and rolling of close graded premix carpet (CGPC) of 20 mm thickness
composed of 11.2 mm to 0.09 mm (MoRTH M -041) aggregates premixed using viscosity grade
bitumen (VG 30@22 kg of bitumen per 10 sqm (MoRTH 5.7.1 Type A) to required line, grade
and level on a previously prepared base, including mixing in a suitable plant, laying and rolling
with a three wheel static, roller of 80-100 kN capacity, finished to required level and grades. By
Manual means. | 13,690 | 1 sqm | 315.11 ₹43,13,855.9 | 318.26 ₹43,56,979.4 | 294 ₹40,24,860 Lowest | 321 ₹43,94,490 |
| 1.00 | OD311751/2025-2026:Providing and sticking of non reflectorized vinyl sign of existing Display boards for Running contract works for one year ( manufactured with vinyl printed sheet) | 8 | sqm | 952.27 ₹7,618.16 | 961.78 ₹7,694.24 | 884 ₹7,072 Lowest | 969 ₹7,752 |
| 2.00Pre monsoon works | |||||||
| 2.00 | 2.3.2.A:Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, up to a lead of 1000 metres including removal and disposal of top organic soil not exceeding 150 mm in thickness In area of light jungle - By Mechanical Means | 0.48 | Hectare | 45,501.9 ₹21,840.91 | 45,956.41 ₹22,059.08 | 42,319 ₹20,313.12 Lowest | 46,304 ₹22,225.92 |
| 2.00 | 2.1.2:Cutting of trees, including cutting of trunks, branches and removal of stumps, roots, stacking of serviceable material with all lifts and up to a lead of 1000 metres and earth filling in the depression/pit. Girth from 600 mm to 900 mm | 15 | each | 1,078.53 ₹16,177.95 | 1,089.3 ₹16,339.5 | 1,003 ₹15,045 Lowest | 1,098 ₹16,470 |
| 2.00 | 2.1.4:Cutting of trees, including cutting of trunks, branches and removal of stumps, roots, stacking of serviceable material with all lifts and up to a lead of 1000 metres and earth filling in the depression/pit Girth above 1800 mm | 15 | each | 4,481.66 ₹67,224.9 | 4,526.43 ₹67,896.45 | 4,168 ₹62,520 Lowest | 4,561 ₹68,415 |
Tender Value
₹69.3 L
EMD Value
₹50,000
Closing Date
14 Sept 2026, 5:00 pmClosed
Executive Engineer PWD Roads Division Muvattu
O/o Executive Engineer PWD Roads Division Muvattupuzha
Initial rectification work Premonsoon works Protective and preventive maintenance works Emergency works.
2026_PWD_867397_1
PWD/RB/TR/675/2026_5_1_1/1
Open Tender
Civil Works - Roads
Item Rate
360 days
Pothanicadu
Please refer Tender documents.
8 documents required · 8 mandatory
₹2,760
₹50,000
Yes
17 Sept 2026
2 Sept 2026
17 Sept 2026
2 Sept 2026
14 Sept 2026
2 Sept 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Reactive maintenance (Initial rectification work ) | |||||
| 1.001 | 55.4:Supplying and stacking 36mm size hard broken stone in standard heaps for measurement. | 0.4 | cum | - | - |
| 1.002 | 55.8.a:Filling up pot holes (cut and formed to regular shapes and all loose and defective materials removed) after supplying a prime coat of hot bitumen using 36mm departmental broken stone and compacting with power roller to get a compact surface. | 0.4 | cum | - | - |
| 1.003 | 5.2.a:Providing and applying tack coat with bitumen emulsion( RS) using emulsion pressure distributor at the rate of 0.20 - 0.30 kg per sqm on the prepared bituminous surface cleaned with mechanical broom. | - | sqm | - | - |
| 1.004 | OD275017/2025-2026:OD129035/2021-2022 Providing , laying and rolling of close graded premix carpet (CGPC) of 20 mm thickness
composed of 11.2 mm to 0.09 mm (MoRTH M -041) aggregates premixed using viscosity grade
bitumen (VG 30@22 kg of bitumen per 10 sqm (MoRTH 5.7.1 Type A) to required line, grade
and level on a previously prepared base, including mixing in a suitable plant, laying and rolling
with a three wheel static, roller of 80-100 kN capacity, finished to required level and grades. By
Manual means. | - | 1 sqm | - | - |
| 1.005 | OD311751/2025-2026:Providing and sticking of non reflectorized vinyl sign of existing Display boards for Running contract works for one year ( manufactured with vinyl printed sheet) | - | sqm | - | - |
| 2Pre monsoon works | |||||
| 2.001 | 2.3.2.A:Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, up to a lead of 1000 metres including removal and disposal of top organic soil not exceeding 150 mm in thickness In area of light jungle - By Mechanical Means | - | Hectare | - | - |
| 2.002 | 2.1.2:Cutting of trees, including cutting of trunks, branches and removal of stumps, roots, stacking of serviceable material with all lifts and up to a lead of 1000 metres and earth filling in the depression/pit. Girth from 600 mm to 900 mm | - | each | - | - |
| 2.003 | 2.1.4:Cutting of trees, including cutting of trunks, branches and removal of stumps, roots, stacking of serviceable material with all lifts and up to a lead of 1000 metres and earth filling in the depression/pit Girth above 1800 mm | - | each | - | - |
stage.html
html • 0.02 MB
finance_1468743.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.09 MB
BOQ_1468743.xls
BOQ • 0.32 MB
viewsbd.pdf
Tender Documents • 1.65 MB
prly.pdf
Tender Documents • 2.31 MB
intgrty.pdf
Additional Documents • 0.17 MB
afdvt.pdf
Additional Documents • 0.26 MB
epymnt.pdf
Other Document • 0.06 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .