| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.2 CrAccepted-AOC | ₹1.2 Cr | L1 | Accepted-AOC LOA |
| 2 | L2₹1.3 Cr+₹3.8 L (3.14%)Rejected-Finance | ₹1.3 Cr+₹3.8 L (3.14%) | L2 | Rejected-Finance Rejected |
Tender Value
Refer Docs
EMD Value
₹2.5 L
Closing Date
8 Jul 2024, 3:00 pmClosed
The Project Director , DRDA,Dindigul
The Project Director , DRDA,Dindigul
PERIODIC RENEWAL OF PMGSY ROADS UNDER PMGSY PERFORMANCE INCENTIVE GRANT 2023-24 OLD PACKAGE NO.TN 05 103 GUZILIAMPARAI BLOCK IN DINDIGUL DISTRICT
2024_RDTN_134898_1
DIPR NO.1942 Tender 2024 Date 18.06.2024
Open Tender
Civil Works - Roads
Item Rate
120 days
DINDIUGL DISTRICT
PERIODIC RENEWAL OF PMGSY ROADS UNDER PMGSY PERFORMANCE INCENTIVE GRANT 2023-24 OLD PACKAGE NO.TN 05 103 GUZILIAMPARAI BLOCK IN DINDIGUL DISTRICT
2 documents required · 2 mandatory
₹0
₹2.5 L
DRDA,DINDIGUL
1 Oct 2024
22 Jun 2024
8 Jul 2024
22 Jun 2024
8 Jul 2024
22 Jun 2024
28 Jun 2024
Amount
Part 1: P MRL17-Karikali to CCC Quarry via Vasavanaickenpatty Road km 0/0-5/61 in Guziliamparai block Estimate amount : Rs. 82.23 Lakhs
Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per Technical Specification Clause 201. km 0/0-5/61
Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross-sections, and transporting to the embankment location with a lift upto 1.5 m and lead upto 1000 m as per Technical Specification Clause 302.3 km 0/0-5/61
Advance patch work for making up the undulation in the existing B.T surface to an average thickness of of 50mm using 45mm IRC size HBG metal with 44 Kg of Bitumen-for 1cum of metal mixed in hot mix plant laying at site
Advance patch work for making up the undulation in the existing B.T surface to an average thickness of of 50mm using 25mm using 13.20mm IRC size HBG metal with 44 Kg of Bitumen-for 1cum of metal mixed in hot mix plant laying at site
Providing and applying tack coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 2 to 2.50 kg per sqm on the prepared granular surface treated with Primer cleaned with Hydraulic broom as per Technical Specification Clause 503.
Providing and laying bituminous concrete with 100-120 TPH batch type HMP producing an average output of 75 tonne per hour using crushed aggregates of specified grading,premixed with bituminous and PMB Cubes @ 5.4 to 5.6 percent by weight of total mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment,rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRT & H speciications clause 507 complete in all respects (25mm thickness)
Providing and Laying Gravel to 100mm compacted thick including cost & conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting by Power roller to achieve the required Proctor density at 100% compaction
Provision for KM stone
Provision for HM stone
Road Marking with Hot applied Thermoplastic compound with Reflectorising Glass beads on Bituminous Surface
Supply and fixing of 60 cm Equilateral triangle cautionary signboard with definition board
Provision for Name board
Towards the charges for routline maintenance of the road work executed under PMGSY including dressing of berms by refilling the gully with the earth from borrow pits, cleaning of wild seasonal growth on berms, destilting of side drains and CD works, white washing guard stones, painting of KM, HM stones, parapets, cutting of branches of trees, refixing displaced guard stones, caution boards, speed limit boards etc., with the periodicity for the above activities as prescribed in IRCSP- 20:2002 and as directed by the departmental officers except for the constructional defects which has to be rectified by the contractor at his own cost
For the First Year from the date of completion of work
For the Second Year from the date of completion of work
For the Third Year from the date of completion of work
For the Fourth Year from the date of completion of work
For the Fifth Year from the date of completion of work
GST Amount for providing Service to Government Contract Works for the above Construction for road works & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package} (Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD)
Part 2: MRL35-Pallanatham to Esanath road up to union limit via V.paraipatty ( Plastic waste )Road km 0/0-1/0 in Sanarpatti Block Estimate amount : Rs.15.00 Lakhs
Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per Technical Specification Clause 201.
Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross-sections, and transporting to the embankment location with a lift upto 1.5 m and lead upto 1000 m as per Technical Specification Clause 302.3
Advance patch work for making up the undulation in the existing B.T surface to an average thickness of of 50mm using 45mm IRC size HBG metal with 44 Kg of Bitumen-for 1cum of metal mixed in hot mix plant laying at site
Providing and applying tack coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 2 to 2.50 kg per sqm on the prepared granular surface treated with Primer cleaned with Hydraulic broom as per Technical Specification Clause 503.
Providing and laying bituminous concrete with 100-120 TPH batch type HMP producing an average output of 75 tonne per hour using crushed aggregates of specified grading,premixed with bituminous and PMB Cubes @ 5.4 to 5.6 percent by weight of total mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment,rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRT & H speciications clause 507 complete in all respects (25mm thickness)
Providing and Laying Gravel to 100mm compacted thick including cost & conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting by Power roller to achieve the required Proctor density at 100% compaction
Provision for KM stone
Provision for HM stone
Road Marking with Hot applied Thermoplastic compound with Reflectorising Glass beads on Bituminous Surface
Supply and fixing of 60 cm Equilateral triangle cautionary signboard with definition board
Repainting and refixing the Name board including all materials and all labour chages etc complete
Towards the charges for routline maintenance of the road work executed under PMGSY including dressing of berms by refilling the gully with the earth from borrow pits, cleaning of wild seasonal growth on berms, destilting of side drains and CD works, white washing guard stones, painting of KM, HM stones, parapets, cutting of branches of trees, refixing displaced guard stones, caution boards, speed limit boards etc., with the periodicity for the above activities as prescribed in IRCSP- 20:2002 and as directed by the departmental officers except for the constructional defects which has to be rectified by the contractor at his own cost
For the First Year from the date of completion of work
For the Second Year from the date of completion of work
For the Third Year from the date of completion of work
For the Fourth Year from the date of completion of work
For the Fifth Year from the date of completion of work
GST Amount for providing Service to Government Contract Works for the above Construction for road works & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package} (Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD)
SRI KUMARAN BUILDERS
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .