| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical | Admitted-Fee/PreQual/Technical |
| 2 | Admitted-Fee/PreQual/Technical WEST BENGAL | MEDINIPUR EAST | WEST BENGAL | 721130 | Admitted-Fee/PreQual/Technical |
| 3 | Admitted-Fee/PreQual/Technical | Admitted-Fee/PreQual/Technical |
Tender Value
₹78.6 L
EMD Value
₹1.6 L
Closing Date
28 Jan 2026, 6:55 pmClosed
CHAIRPERSON
BUNIADPUR MUNICIPALITY
Rejuvenation of Water Body including subsequent Operation and Maintenance at Kalipukur Pond (Plot No- 284, Mouza- Khushipur, J.L. No- 253) in Ward No. 01 within Buniadpur Municipality under AMRUT 2.0 Scheme
2026_DMDD_983081_1
2273/ N- 213/BPM/2025
Open Tender
CIVIL WORKS
Percentage
120 days
Different Ward
Please refer Tender documents.
6 documents required · 6 mandatory
₹0
₹1.6 L
Yes
20 Jul 2026
5 Jan 2026
30 Jan 2026
5 Jan 2026
28 Jan 2026
5 Jan 2026
Cutting uprooting and clearing jungles including shrubs, water weeds, bushes, trees, plants, upto 30 cm. girth including removing as directed by Engineer-in-charge.
Earthwork in re-excavation / silt clearance in drainage channel in all kinds of soil including sludge, slush mixed with all sorts of industrial wastes and municipal garbages, polypacks, carcasses, small khatal effluents, night soil etc. by mathor labour as may be necessary and depositing the same in places as directed by the Engineer-in-charge , in such a manner, without causing much hindrance to traffic and posing health hazard and making arrangement to maintain the site in workable condition and rough dressing when dry including making arrangement of bailing out of any seepage water and removal of sand or soil blown from underneath,removal of khatal, temporary latrines, clearing and removing all kinds of semi compact masses formed by water hyacinth, jungles up to 30 cm girth, and burning them to ashes or removing outside Government land in conformity with the Municipal rules, including shoring shuttering as required, nicking out lines etc.(Measurement : Pre-work and Post-work level section. Pre- work section to be taken after removal of water hyacinth and all other floating materials etc.) By mechanical means using hydraulic excavators within an initial lead of 30 M and an initial lift of 3.0 M.
Pumping out water from ponds or tanks % (Payment if permitted will be made on the quantity of water calculated on the basis of initial water level and final level on consideration being made for any water that may have been added through percolation or otherwise)
Earth work in excavation of foundation trenches or drains, in all sorts of soil (including mixed soil but excluding laterite or sandstone) including removing, spreading or stacking the spoils within a lead of 75 m. as directed. The item includes necessary trimming the sides of trenches, levelling, dressing and ramming the bottom, bailing out water as required complete. a) Depth of excavation not exceeding 1,500 mm.
Filling in foundation or plinth by fine sand in layers not exceeding 150 mm as directed and consolidating the same by thorough saturation with water, ramming complete including the cost of supply of sand. (payment to made on measurement of finished quantity) by fine sand
Single Brick Flat Soling of picked jhama bricks including ramming and dressing bed to proper level and filling joints with local sand. (3 rd corrigenda 04.06.2018)
Ordinary Cement concrete (mix 1:2:4) with graded stone chips (20 mm nominal size) excluding shuttering and reinforcement,if any, in ground floor as per relevant IS codes. a) Pakur Variety [Analysis]
Brick work with 1st class bricks in cement mortar (1:6) In foundation and plinth
Hire and labour charges for shuttering with centering and necessary staging upto 4 m using approved stout props and thick hard wood planks of approved thickness with required bracing for concrete slabs, beams and columns, lintels curved or straight including fitting, fixing and striking out after completion of works (upto roof of ground floor), 25 mm to 30 mm thick wooden shuttering as per decision & direction of Engineer-In-Charge.
Ordinary Cement concrete (mix 1:1.5:3) with graded stone chips (20 mm nominal size) excluding shuttering and reinforcement if any, in ground floor as per relevant IS codes. Pakur variety
Reinforcement for reinforced concrete work in all sorts of structures including distribution bars, stirrups, binders etc initial straightening and removal of loose rust (if necessary), cutting to requisite length, hooking and bending to correct shape, placing in proper position and binding with 16 gauge black annealed wire at every intersection, complete as per drawing and direction. For works in foundation and upto roof of ground floor/upto 4 m Tor Steel Rods/HYSD/Fe 415/Fe 500/Fe 500 D (JSPL/SHYAM/SRMB/BMASL/ELECROSTEEL/SSL)
Plaster (to wall, floor, ceiling etc.) with sand and cement mortar including rounding off or chamfering corners as directed and raking out joints including throating, nosing and drip course, scaffolding/staging where necessary (Ground floor). With 1:6 cement mortar (c) 15 mm thick plaste
Neat cement punning about 1.5mm thick in wall, dado, window sill, floor etc.
Supplying, fitting and fixing Marble Slab/tile of 15 to 18 mm thickness in floor, lobby, stair, landing & treads etc. over 20 mm (av.) thck base of Cement mortar (1:2) laid with white cement slurry @ 4.4 kg/Sq.m before placing marble & jointed with white cement slurry @ 2.0 kg/Sq.m with necessary pigments including grinding and Granite polishing as per direction of Engineering -in -Charge in Ground Floor. {White cement and Pigment to be supplied by the Agency] With Makrana plain pink / Adranga Pink / Garbh Gulabi / Udaypur pink / Udaypur Green / Black Bhaslana Area of each Slab/tile exceeding 0.3 sq.m. but not exceeding 0.6 sq.m.
Artificial stone in floor, dado, staircase etc with cement oncrete (1:2:4) with stone chips, laid in panels as directed with topping made with ordinary or white cement (as necessary) and marble dust in proportion (1:2) including smooth finishing and rounding off corners including raking out joints or roughening of concrete surface and application of cement slurry before flooring works using cement @ 1.75 kg/sq.m all complete including all materials and labour. In ground floor. 3 mm. thick topping (High polishing grinding on this item is not permitted with ordinary cement). Using grey cement 20 mm. thick
Supplying and laying Polythene Sheet (150gm / sq.m.) over damp proof course or below flooring or roof terracing or in foundation or in foundation trenches
Supplying Eucalyptus-bullah piles at work site, including dressing and making one end pointed. 100mm diameter
Supplying Eucalyptus-bullah piles at work site, including dressing and making one end pointed. 150mm diameter
Labour for driving Sal-bullah / Eucalyptus bullah piles by monkey in sorts of soil including hoisting and placing piles in position, protecting the pile head with iron ring and cutting and shaping heads before and after driving and including hire and labour for necessary driving appliances and all tackles. 150mm diameter
Labour for fitting and fixing 10 cm. to 13 cm. diameter Sal-bullah/Eucalyptus-bullah as ties and runners including necessary nails, bolts and nuts.
Coal tarring on wooden surfaces including cost of materials Double coat.
Supplying empty Cement bags in good condition. Number of empty bag = 738 nos
Filling empty Cement bags with dry earth or sand, stitching the bag (cost of thread included) and carrying and placing them in position and all incidental charges complete but excluding cost of sand and gunny bags.
Walling or roofing fitted and fixed complete with cut drum sheets including the cost of drums, cost of cutting drums and flattening the sheets and cost of necessary nails and screws
Supplying, fitting, fixing in position netting with PVC Coated Crinkle mesh of approved colour with wooden or steel or concrete frame work including cost of galvanised bolts, nuts, screws, nails, spacers, shape welding etc complete but excluding the cost of supporting frame works, battens etc. 75mm. X 75mm. X 8g
M.S. structural works in columns, beams etc. with simple rolled structural members (e.g. joists, angle, channel sections conforming to IS: 226, IS: 808 & SP (6)- 1964 connected to one another withbracket, gussets, cleats as per design, direction of Engineer-incharge complete including cutting to requisite shape and length, fabrication with necessary bolting, metal arc welding conforming to IS: 816- 1969 & IS: 1995 using electrodes of approved make and brand conforming to IS:814- 2004, haulage, hoisting and erection all complete. The rate includes the cost of rolled steel section, consumables such as electrodes, gas and hire charge of all tools and plants and labour required for the work including all incidental chages such as electricity charges, labour insurance charges etcPayment to be made on the basis of calculated weight of structural members only in finished work as per IS specified weight. Payment for gusset, bracket, cleat, rivets, bolts and nuts may be make by adding the actual weight of such items with the weight of finished structural members or 7% of weight for finished structural members weighing not less than 22.5 Kg. / m. or 15 % of weight for finished structal members weighing less than 22.5 Kg. / m. may be increased allow for bracket, cleat, rivet, bolts and nuts etc. and no seperate payment being made for these items, as per direction of Engineer In Charge. The rates are considered for a height of erection 8m. / 2nd floor level from the ground.
Supplying and laying chequered tiles of any shade & of approved quality with (1:1½:3) cement concrete laid in panels or patterns as directed in pavement, footpath etc. including necessary underlay 25 mm thick [avg] cement mortar (1:3) complete in all respect with all labour and materials. Red Variety 25 mm. thick
Priming one coat on steel or other metal surface with synthetic oil bound primer of approved quality including smoothening surfaces by sand papering etc.
Painting with best quality synthetic enamel paint of approved make and brand including smoothening surface by sand papering etc. including using of approved putty etc. on the surface, if necessary On steel or other metal surface : With super gloss (hi-gloss) Two coat (with any shade except white)
Applying Exterior grade Acrylic primer of approved quality and brand on plastered or cencrete surface old or new surface to receive decorative textured (matt finish) or smooth finish acrylic exterior emulsion paint including scraping and preparing the surface throughly, complete as per manufacturer's specification and as per direction of the EIC. One Coat
Protective and Decorative Acrylic exterior emulsion paint of approved quality, as per manufacturer's specification and as per direction of Engineer-in-Charge to be applied over acrylic primer as required. The rate includes cost of material, labour, scaffolding and all incidental charges but excluding the cost of primer. Normal Acrylic Emulsion In Ground floor (Two Coat)
Turfing with Sods Furnishing and laying of the live sods of perennial turf forming grass on embankment slope, verges or other locations shown on the drawing or as directed by the Engineer including preparation of ground, fetching of sods and watering as per Clause 307 of Specifications for Road & Bridge Works of MoRT&H (5th Revision).
Supplying, fitting and fixing single skin color coated trapezoidal profile for wall cladding, Roof shall be made of 0.45 BMT (Base Metal Thickness) 0.50mm TCT (Total Coated Thickness excluding paint), G550 (min 550 yield strength) of Zincalume metallic coating (IS 15965) with high Solar Reflectance Index (SRI) value for better colling as per thermatech technology, 1000-1015mm effective cover width with five major corrugation, 28mm high rib spaced at 203mm c/c with subtle square fluting in the pan and the end rib shall have anti-capillary groove and return leg. The steel sheet shall be fastened with 40micron zinc coated or 25micron zinc-tin alloy coated, hex head, self-drilling screw as per IS 3566-2002 Class 3 fastener. The base steel shall be coated with zinc-aluminium alloy Zincalume (AZ 150) (i.e. 55% Al, 43.4% Zn, 1.6% Si) minimum of 150g/sqm coating total on both sides, pre-painted with colorband XRW (Exterior Roofing, Walling) paint system of 35micron Super Durable Polyester (SDP) paint with stable inorganic pigment with no lead contents confirming IS 15965. The sheet shall be free from defects and have brand marking of the manufacturer giving product details on the back of the sheet at regular interval confirming genuinity of the material. In Roof - With 0.5 mm thick sheet
Galvanised plain sheet works (excluding supporting framework) fitted and fixed with 6 mm. dia J or L hook-bolts and nuts, sheet-bolts, limpet and bitumen washers and putty with 150 mm. end lap & 50 mm minimum side lap complete In wall with 0.63 mm. sheets.
Painting block letters or digits in Black Japan or any approved paint as per direction. Size above 15 cm. and upto 20 cm..
Supplying and Planting of different plant / trees (Supplying well grown plants bushy and healthy, minimum height as specified i.e. exposed height including all leads & lift, carriage, handling, manuring, applying presticide and fertilizer etc. Rangon hi-breed healthy plant. @ 2.0 m c/c
Supplying and Planting of different plant / trees (Supplying well grown plants bushy and healthy, minimum height as specified i.e. exposed height including all leads & lift, carriage, handling, manuring, applying presticide and fertilizer etc. Duranta goldianna of size not less than 20cm @ 0.50 m c/c both side
Clearing and removal of water hyacinth including weeds,thick and thorny floating jungles and burning them toa shes when dry or removing them outside Government land including all leads and lifts to stack in a near by available space complete. (Including GST).
Maintenance of hedge for one year including application of necessary pesticide, farm yard manure, replacement of damaged hedge plant by new one complete in all respect as per instruction of Engineer-in-charge. This includes supply of labour, tools & plants including materials.
Add GST @18% (Excluding Sl. No. 36)
Add CESS @1%
stage.html
html • 0.03 MB
tech_bid_open.pdf
cancelled_1.pdf
pdf • 0.15 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.91 MB
Estimate_Part_A.pdf
Tender Documents • 2.73 MB
Drowing.pdf
Tender Documents • 3.08 MB
Estimate_Part_B.pdf
Tender Documents • 0.65 MB
BOQ_2398594.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .