ASSISTANT EXECUTIVE ENGINEER
ASSISTANT EXECUTIVE ENGINEER KWA PH SUB DIVISION THODUPUZHA
Annual maintenance of various types and sizes of water supply pipe lines in Muttom panchayat for the year 2025 26
2025_KWA_816605_1
42/25-26/KWA/PHSDN/TDPA
Open Tender
Civil Works - Others
Item Rate
MUTTOM
Please refer Tender documents.
10 documents required · 10 mandatory
₹2,760
Yes
₹25,484
Yes
14 Nov 2025
29 Oct 2025
12 Nov 2025
29 Oct 2025
10 Nov 2025
29 Oct 2025
Work Name:O&M - Water Supply Schemes-Annual Maintanance 2025-26-Annual maintenance of various types and sizes of water supply pipe lines in Muttom panchayat for the year 2025-26-Pipeline Work
g the trenches using excavated earth in layers not exceeding 20cm depth including consolidating each layers by ramming, watering, charges for removing surplus soil from work site, including hire for tools and plant, conveyance of tools and materials, bailing out water, providing caution boards, lighting, watching, ribbon fencing, traffic controlling etc., complete as per the direction of Departmental officers excluding the cost of pipe and C.I.D. Joints.x100.47.1.1:Leak rectification work in 32mm uPVC (Class 2 to 6) pipeline including detecting and locating leak, earthwork excavation in all kinds of soil for exposing leak portion of the pipe including tar cutting / concrete cutting, cutting the pipe diametrically perpendicular to the axis of pipeline without causing any damages to the remaining portion, dismantling and lifting the pipe from trenches, smoothening the cut ends, conveying the new pipe to the site, cutting and lowering new pipe into the trenches, placing in position, aligning the pipe to line and level and jointing the new pipe with the existing pipe with solvent cement or any available joint and testing the pipeline by operating the valves concerned, and rectifying the defects if noticed and without causing any damages to the existing utilities and refilling the trenches using excavated earth in layers not exceeding 20cm depth including consolidating each layers by ramming, watering, charges for removing surplus soil from work site, including hire for tools and plant, conveyance of tools and materials, bailing out water, providing caution boards, lighting, watching, ribbon fencing, traffic controlling etc., complete as per the direction of Departmental officers including the cost of pipe and uPVC specials; uPVC Pipes and specials shall be of good quality and conforming to relevant standards: All Socketed Jointing.x100.47.1.2:Leak rectification work in 40mm uPVC (Class 2 to 6) pipeline including detecting and locating leak, earthwork excavation in all kinds of soil for exposing leak portion of the pipe including tar cutting / concrete cutting, cutting the pipe diametrically perpendicular to the axis of pipeline without causing any damages to the remaining portion, dismantling and lifting the pipe from trenches, smoothening the cut ends, conveying the new pipe to the site, cutting and lowering new pipe into the trenches, placing in position, aligning the pipe to line and level and jointing the new pipe with the existing pipe with solvent cement or any available joint and testing the pipeline by operating the valves concerned, and rectifying the defects if noticed and without causing any damages to the existing utilities and refilling the trenches using excavated earth in layers not exceeding 20cm depth including consolidating each layers by ramming, watering, charges for removing surplus soil from work site, including hire for tools and plant, conveyance of tools and materials, bailing out water, providing caution boards, lighting, watching, ribbon fencing, traffic controlling etc., complete as per the direction of Departmental officers including the cost of pipe and uPVC specials; uPVC Pipes and specials shall be of good quality and conforming to relevant standards: All Socketed Jointing.x100.47.1.3:Leak rectification work in 50mm uPVC (Class 2 to 6) pipeline including detecting and locating leak, earthwork excavation in all kinds of soil for exposing leak portion of the pipe including tar cutting / concrete cutting, cutting the pipe diametrically perpendicular to the axis of pipeline without causing any damages to the remaining portion, dismantling and lifting the pipe from trenches, smoothening the cut ends, conveying the new pipe to the site, cutting and lowering new pipe into the trenches, placing in position, aligning the pipe to line and level and jointing the new pipe with the existing pipe with solvent cement or any available joint and testing the pipeline by operating the valves concerned, and rectifying the defects if noticed and without causing any damages to the existing utilities and refilling the trenches using excavated earth in layers not exceeding 20cm depth including consolidating each layers by ramming, watering, charges for removing surplus soil from work site, including hire for tools and plant, conveyance of tools and materials, bailing out water, providing caution boards, lighting, watching, ribbon fencing, traffic controlling etc., complete as per the direction of Departmental officers including the cost of pipe and uPVC specials; uPVC Pipes and specials shall be of good quality and conforming to relevant standards: All Socketed Jointing.x100.47.1.4:Leak rectification work in 63mm uPVC (Class 2 to 6) pipeline including detecting and locating leak, earthwork excavation in all kinds of soil for exposing leak portion of the pipe including tar cutting / concrete cutting, cutting the pipe diametrically perpendicular to the axis of pipeline without causing any damages to the remaining portion, dismantling and lifting the pipe from trenches, smoothening the cut ends, conveying the new pipe to the site, cutting and lowering new pipe into the trenches, placing in position, aligning the pipe to line and level and jointing the new pipe with the existing pipe with solvent cement or any available joint and testing the pipeline by operating the valves concerned, and rectifying the defects if noticed and without causing any damages to the existing utilities and refilling the trenches using excavated earth in layers not exceeding 20cm depth including consolidating each layers by ramming, watering, charges for removing surplus soil from work site, including hire for tools and plant, conveyance of tools and materials, bailing out water, providing caution boards, lighting, watching, ribbon fencing, traffic controlling etc., complete as per the direction of Departmental officers including the cost of pipe and uPVC specials; uPVC Pipes and specials shall be of good quality and conforming to relevant standards: All Socketed Jointing.x100.47.1.5:Leak rectification work in 75mm uPVC (Class 2 to 6) pipeline including detecting and locating leak, earthwork excavation in all kinds of soil for exposing leak portion of the pipe including tar cutting / concrete cutting, cutting the pipe diametrically perpendicular to the axis of pipeline without causing any damages to the remaining portion, dismantling and lifting the pipe from trenches, smoothening the cut ends, conveying the new pipe to the site, cutting and lowering new pipe into the trenches, placing in position, aligning the pipe to line and level and jointing the new pipe with the existing pipe with solvent cement or any available joint and testing the pipeline by operating the valves concerned, and rectifying the defects if noticed and without causing any damages to the existing utilities and refilling the trenches using excavated earth in layers not exceeding 20cm depth including consolidating each layers by ramming, watering, charges for removing surplus soil from work site, including hire for tools and plant, conveyance of tools and materials, bailing out water, providing caution boards, lighting, watching, ribbon fencing, traffic controlling etc., complete as per the direction of Departmental officers including the cost of pipe and uPVC specials; uPVC Pipes and specials shall be of good quality and conforming to relevant standards: All Socketed Jointing.x100.47.1.6:Leak rectification work in 90mm uPVC (Class 2 to 6) pipeline including detecting and locating leak, earthwork excavation in all kinds of soil for exposing leak portion of the pipe including tar cutting / concrete cutting, cutting the pipe diametrically perpendicular to the axis of pipeline without causing any damages to the remaining portion, dismantling and lifting the pipe from trenches, smoothening the cut ends, conveying the new pipe to the site, cutting and lowering new pipe into the trenches, placing in position, aligning the pipe to line and level and jointing the new pipe with the existing pipe with solvent cement or any available joint and testing the pipeline by operating the valves concerned, and rectifying the defe
ing pipe with solvent cement or repairable joint and testing the pipeline by operating the valves concerned, and rectifying the defects if noticed and refilling the trenches in layers not exceeding 20cm depth including consolidating each layers by ramming, watering, charges for removing surplus soil from work site, without causing any damage to the existing utilities, including hire for tools and plant, conveyance of tools and materials, bailing out water, providing caution boards, ribbon fencing, lighting, watching, traffic control etc., complete as per the direction of Departmental officers, including the cost of pipe & specials but excluding the cost of C.I.R. Joints; uPVC Pipes and specials shall be of good quality and conforming to relevant standards: C.I.R. Jointing.ö100.48.1.5:Rectification of leakages in 200mm C.I. Pipe of all classes by replacing a length up to 1.5m including earthwork excavation in all kinds of soil for exposing leak portion of the pipe including tar cutting / concrete cutting, cutting and removing and stacking the damaged portion from the existing line without causing any damages to the remaining portion and specials and conveying and replacing with the C.I. pipe and conveying and jointing with C.I.D. joint / suitable mechanical joint of suitable size or any other available size suitable joints after cleaning the ends, grinding if necessary, centering the pipe, inserting the joints, tightening to make a water tight joint, charging and testing to the required pressure, rectifying any defects noticed and refilling the trenches using excavated earth in layers not exceeding 20cm depth including consolidating each layers by ramming, watering, removing the surplus soil from the work site, without causing any damages to any other utilities, including the charges of conveyance and hire for tools and plant, bailing out water, lighting, watching, ribbon fencing, providing caution boards, traffic diversion but excluding cost of materials and as per the direction of departmental officers etc., complete.á100.48.3.5:Rectification of joint leakages in 200mm C.I. Pipe including earthwork excavation in all kinds of soil for exposing leaking joint including tar cutting / concrete cutting, without causing any damages to the line and specials, cleaning the joints including raking out the damaged hemp and lead, conveying hemp and lead and providing lead joint after cleaning the joint, charging and testing to the required pressure, rectifying any defects noticed and refilling the trenches using excavated earth in layers not exceeding 20cm depth including consolidating each layers by ramming, watering, removing the surplus soil from the work site, without causing any damages to any other utilities, including the charges of conveyance and hire for tools and plant, bailing out water, lighting, watching, ribbon fencing, providing caution boards, traffic diversion, including cost of materials and as per the direction of departmental officers etc., complete, but excluding the cost of pig lead.y100.49.1.3:Rectification of joint leakages in 200mm D.I. Pipe (cutting, removing and laying back a length of 1.0m from one side of the joint) including earthwork excavation in all kinds of soil for exposing leak portion of the pipe including tar cutting / concrete cutting, by cutting and removing a portion of pipe from the damaged joint without causing any damages to the remaining portion of the line and specials and replacing the pipe with mechanical and tyton joint after cleaning the ends, centering the pipe, providing the joints, testing the line to the required test pressure, rectifying any defects noticed and refilling the trenches using excavated earth in layers not exceeding 20cm depth including consolidating each layers by ramming, watering, removing the surplus soil from the work site, without causing any damages to any other utilities, including the charges of hire and conveyance of tools, plants and materials to the leak site, bailing out water, lighting, watching, ribbon fencing, caution boards, traffic diversion but excluding cost of mechanical joint and as per the direction of departmental officers etc., complete. OD99673/2025-2026:Rectification of leakages of 20mm & 25mm G.I. Pipes by replacing lengths up to 1.0m in expose
⹇⹉倠灩獥漠畳瑩扡敬猠穩湡潪湩楴杮戠⁹桴慲敤潣灵敬湡湵潩景猠極慴汢楳敺椠据畬楤杮琠牨慥楤杮污杩敮敭瑮慬楹杮愠摮樠楯瑮湩潴洠歡慷整楴桧⁴潪湩ⱴ琠獥楴杮琠敨氠湩潴琠敨爠煥極敲牰獥畳敲敲瑣晩楹杮愠祮搠晥捥獴渠瑯捩摥楷桴畯⁴慣獵湩湡⁹慤慭敧潴愠祮漠桴牥甠楴楬楴獥湩汣摵湩桴档牡敧楨敲愠摮挠湯敶慹据景琠潯獬汰湡⁴湡慭整楲污潴琠敨氠慥楳整慢汩湩畯⁴慷整Ⱳ氠杩瑨湩Ⱨ眠瑡档湩Ⱨ爠扩潢敦据湩Ⱨ挠畡楴湯戠慯摲ⱳ琠慲晦捩搠癩牥楳湯敮散獳牡⁹捳晡潦摬湩湩汣摵湩桴潣瑳漠灳捥慩獬戠瑵攠捸畬楤杮挠獯⁴景瀠灩湡獡瀠牥琠敨搠物捥楴湯漠敤慰瑲敭瑮污漠晦捩牥瑥潣灭敬整褮〱⸰〵㈮㈮刺捥楴楦慣楴湯漠敬歡条獥漠㔶浭䜠䤮楐数湩攠灸獯摥瀠牯楴湯祢爠灥慬楣杮氠湥瑧獨甠⁰潴ㄠ〮祢挠瑵楴杮敲潭楶杮愠摮猠慴正湩桴慤慭敧潰瑲潩牦浯琠敨攠楸瑳湩楬敮眠瑩潨瑵挠畡楳杮愠祮搠浡条獥琠桴敲慭湩湩潰瑲潩湡灳捥慩獬愠摮挠湯敶楹杮愠摮爠灥慬楣杮眠瑩⹇⹉倠灩獥漠畳瑩扡敬猠穩湡潪湩楴杮戠⁹桴慲敤潣灵敬湡湵潩景猠極慴汢楳敺椠据畬楤杮琠牨慥楤杮污杩敮敭瑮慬楹杮愠摮樠楯瑮湩潴洠歡慷整楴桧⁴潪湩ⱴ琠獥楴杮琠敨氠湩潴琠敨爠煥極敲牰獥畳敲敲瑣晩楹杮愠祮搠晥捥獴渠瑯捩摥楷桴畯⁴慣獵湩湡⁹慤慭敧潴愠祮漠桴牥甠楴楬楴獥湩汣摵湩桴档牡敧楨敲愠摮挠湯敶慹据景琠潯獬汰湡⁴湡慭整楲污潴琠敨氠慥楳整慢汩湩畯⁴慷整Ⱳ氠杩瑨湩Ⱨ眠瑡档湩Ⱨ爠扩潢敦据湩Ⱨ挠畡楴湯戠慯摲ⱳ琠慲晦捩搠癩牥楳湯敮散獳牡⁹捳晡潦摬湩湩汣摵湩桴潣瑳漠灳捥慩獬戠瑵攠捸畬楤杮挠獯⁴景瀠灩湡獡瀠牥琠敨搠物捥楴湯漠敤慰瑲敭瑮污漠晦捩牥瑥潣灭敬整堮〱⸰〵㌮ㄮ刺捥楴楦慣楴湯漠敬歡条獥漠〵浭䜠䤮楐数湩攠灸獯摥瀠牯楴湯祢爠灥慬楣杮氠湥瑧獨甠⁰潴ㄠ〮祢挠瑵楴杮敲潭楶杮愠摮猠慴正湩桴慤慭敧潰瑲潩牦浯琠敨攠楸瑳湩楬敮眠瑩潨瑵挠畡楳杮愠祮搠浡条獥琠桴敲慭湩湩潰瑲潩湡灳捥慩獬愠摮挠湯敶楹杮愠摮爠灥慬楣杮眠瑩⹇⹉倠灩獥漠畳瑩扡敬猠穩湡潪湩楴杮戠⁹桴敲畲敷摬湩潴洠歡慷整楴桧⁴潪湩ⱴ瀠楡瑮湩桴敷摬摥瀠牯楴湯整瑳湩桴楬敮琠桴敲畱物摥瀠敲獳牵ⱥ爠捥楴祦湩湡⁹敤敦瑣潮楴散Ɽ眠瑩潨瑵挠畡楳杮愠祮搠浡条獥琠湡⁹瑯敨瑵汩瑩敩ⱳ椠据畬楤杮琠敨挠慨杲獥栠物湡潣癮祥湡散漠潴汯ⱳ瀠慬瑮愠摮洠瑡牥慩獬琠桴敬歡猠瑩ⱥ戠楡楬杮漠瑵眠瑡牥楬桧楴杮慷捴楨杮楲扢湯映湥楣杮慣瑵潩潢牡獤牴晡楦楤敶獲潩Ɱ渠捥獥慳祲猠慣晦汯楤杮椠据畬楤杮琠敨挠獯⁴景猠数楣污畢⁴硥汣摵湩潣瑳漠楰数愠摮愠数桴楤敲瑣潩景搠灥牡浴湥慴景楦散獲攠捴Ⱞ挠浯汰瑥͘〰㔮⸰⸳㨲敒瑣晩捩瑡潩景氠慥慫敧景㘠洵⹇⹉倠灩獥椠硥潰敳潰瑲潩獮戠⁹敲汰捡湩敬杮桴灵琠⸱洰戠⁹畣瑴湩Ⱨ爠浥癯湩湡瑳捡楫杮琠敨搠浡条摥瀠牯楴湯映潲桴硥獩楴杮氠湩楷桴畯⁴慣獵湩湡⁹慤慭敧潴琠敨爠浥楡楮杮瀠牯楴湯愠摮猠数楣污湡潣癮祥湩湡敲汰捡湩楷桴䜠䤮楐数景猠極慴汢楳敺愠摮樠楯瑮湩祢琠牨敥爠湵眠汥楤杮琠慭敫愠眠瑡牥琠杩瑨樠楯瑮慰湩楴杮琠敨眠汥敤潰瑲潩Ɱ琠獥楴杮琠敨氠湩潴琠敨爠煥極敲牰獥畳敲敲瑣晩楹杮愠祮搠晥捥獴渠瑯捩摥楷桴畯⁴慣獵湩湡⁹慤慭敧潴愠祮漠桴牥甠楴楬楴獥湩汣摵湩桴档牡敧楨敲愠摮挠湯敶慹据景琠潯獬汰湡⁴湡慭整楲污潴琠敨氠慥楳整慢汩湩畯⁴慷整Ⱳ氠杩瑨湩Ⱨ眠瑡档湩Ⱨ爠扩潢敦据湩Ⱨ挠畡楴湯戠慯摲ⱳ琠慲晦捩搠癩牥楳湯敮散獳牡⁹捳晡潦摬湩湩汣摵湩桴潣瑳漠灳捥慩獬戠瑵攠捸畬楤杮挠獯⁴景瀠灩湡獡瀠牥琠敨搠物捥楴湯漠敤慰瑲敭瑮污漠晦捩牥瑥潣灭敬整堮〱⸰〵㌮㌮刺捥楴楦慣楴湯漠敬歡条獥漠〸浭䜠䤮楐数湩攠灸獯摥瀠牯楴湯祢爠灥慬楣杮氠湥瑧獨甠⁰潴ㄠ〮祢挠瑵楴杮敲潭楶杮愠摮猠慴正湩桴慤慭敧潰瑲潩牦浯琠敨攠楸瑳湩楬敮眠瑩潨瑵挠畡楳杮愠祮搠浡条獥琠桴敲慭湩湩潰瑲潩湡灳捥慩獬愠摮挠湯敶楹杮愠摮爠灥慬楣杮眠瑩⹇⹉倠灩獥漠畳瑩扡敬猠穩湡潪湩楴杮戠⁹桴敲畲敷摬湩潴洠歡慷整楴桧⁴潪湩ⱴ瀠楡瑮湩桴敷摬摥瀠牯楴湯整瑳湩桴楬敮琠桴敲畱物摥瀠敲獳牵ⱥ爠捥楴祦湩湡⁹敤敦瑣潮楴散Ɽ眠瑩潨瑵挠畡楳杮愠祮搠浡条獥琠湡⁹瑯敨瑵汩瑩敩ⱳ椠据畬楤杮琠敨挠慨杲獥栠物湡潣癮祥湡散漠潴汯ⱳ瀠慬瑮愠摮洠瑡牥慩獬琠桴敬歡猠瑩ⱥ戠楡楬杮漠瑵眠瑡牥楬桧楴杮慷捴楨杮楲扢湯映湥楣杮慣瑵潩潢牡獤牴晡楦楤敶獲潩Ɱ渠捥獥慳祲猠慣晦汯楤杮椠据畬楤杮琠敨挠獯⁴景猠数楣污畢⁴硥汣摵湩潣瑳漠楰数愠摮愠数桴楤敲瑣潩景搠灥牡浴湥慴景楦散獲攠捴Ⱞ挠浯汰瑥͕〰㔮⸰⸳㨴敒瑣晩捩瑡潩景氠慥慫敧景ㄠ〰洠䥇倠灩獥椠硥潰敳潰瑲潩獮戠⁹敲汰捡湩敬杮桴灵琠⸱洰戠⁹畣瑴湩Ⱨ爠浥癯湩湡瑳捡楫杮琠敨搠浡条摥瀠牯楴湯映潲桴硥獩楴杮氠湩楷桴畯⁴慣獵湩湡⁹慤慭敧潴琠敨爠浥楡楮杮瀠牯楴湯愠摮猠数楣污湡潣癮祥湩湡敲汰捡湩楷桴䜠⁉楐数景猠極慴汢楳敺愠摮樠楯瑮湩祢琠牨敥爠湵眠汥楤杮琠慭敫愠眠瑡牥琠杩瑨樠楯瑮慰湩楴杮琠敨眠汥敤潰瑲潩Ɱ琠獥楴杮琠敨氠湩潴琠敨爠煥極敲牰獥畳敲敲瑣晩楹杮愠祮搠晥捥獴渠瑯捩摥楷桴畯⁴慣獵湩湡⁹慤慭敧潴愠祮漠桴牥甠楴楬楴獥湩汣摵湩桴档牡敧楨敲愠摮挠湯敶慹据景琠潯獬汰湡⁴湡慭整楲污潴琠敨氠慥楳整慢汩湩畯⁴慷整Ⱳ氠杩瑨湩Ⱨ眠瑡档湩Ⱨ爠扩潢敦据湩Ⱨ挠畡楴湯戠慯摲ⱳ琠慲晦捩搠癩牥楳湯敮散獳牡⁹捳晡潦摬湩湩汣摵湩桴潣瑳漠灳捥慩獬戠瑵攠捸畬楤杮挠獯⁴景瀠灩湡獡瀠牥琠敨搠物捥楴湯漠敤慰瑲敭瑮污漠晦捩牥瑥挠浯汰瑥Η〰㔮⸱㨳楄捳湯敮瑣湩慷整潣湮捥楴湯映潲敳癲捩慭湩污湯獁桰污⁴潲摡眠瑩潨瑵挠畡楳杮愠祮搠浡条潴琠敨攠楸瑳湩楬敮椠据畬楤杮挠慨杲獥漠慥瑲潷歲攠捸癡瑡潩湩愠汬欠湩獤漠潳汩映牯攠灸獯湩潣湮捥楴湯瀠楯瑮椠据畬楤杮琠牡挠瑵楴杮⼠挠湯敲整挠瑵楴杮慭楫杮琠敨搠獩潣湮捥楴湯瀠楯瑮眠瑡牥琠杩瑨挠慨杲湩湡整瑳湩潴琠敨爠煥極敲牰獥畳敲敲瑣晩楹杮愠祮搠晥捥獴渠瑯捩摥愠摮爠晥汩楬杮琠敨琠敲据敨獵湩硥慣慶整慥瑲湩氠祡牥潮⁴硥散摥湩〲浣搠灥桴椠据畬楤杮挠湯潳楬慤楴杮攠捡慬敹獲戠⁹慲浭湩Ⱨ眠瑡牥湩Ⱨ爠浥癯湩桴畳灲畬潳汩映潲桴潷歲猠瑩ⱥ眠瑩潨瑵挠畡楳杮愠祮搠浡条獥琠湡⁹瑯敨硥獩楴杮甠楴楬楴獥湩汣摵湩桴档牡敧景栠物潦潴汯湡汰湡ⱴ挠湯敶慹据景琠潯獬愠摮洠瑡牥慩獬琠桴敬歡猠瑩ⱥ戠楡楬杮漠瑵眠瑡牥楬桧楴杮慷捴楨杮楲扢湯映湥楣杮慣瑵潩潢牡獤牴晡楦楤敶獲潩畢⁴硥汣摵湩潣瑳漠慭整楲污湡獡瀠牥琠敨搠物捥楴湯漠敤慰瑲敭瑮污漠晦捩牥瑥挠浯汰瑥 䐀獩潣湮捥楴湯õ伀㥄㘹ㄸ㈯㈰ⴵ〲㘲䐺獩慭瑮楬杮愠摮爠汥祡湩〵㘯‵浭䜠⁉楐数潣灭敬整眠瑩⹇⹉映瑩楴杮湩汣摵湩牴湥档湩湡敲楦汬湩瑥戠瑵攠捸畬楤杮挠獯⁴景瀠灩獥愠摮映瑩楴杮潦汢捯档捥楫杮瑥挠浯汰瑥獡瀠牥搠物捥楴湯漠敤慰瑲敭瑮污漠晦捩牥ú伀㥄㘹〸㈯㈰ⴵ〲㘲䐺獩慭瑮楬杮愠摮爠汥祡湩㔱㈯⼵㈳㐯洰䥇倠灩獥挠浯汰瑥楷桴䜠䤮楦瑴湩獧椠据畬楤杮琠敲据楨杮愠摮爠晥汩楬杮攠捴畢⁴硥汣摵湩潣瑳漠楰数湡楦瑴湩獧映牯戠潬正挠敨正湩Ⱨ攠捴潣灭敬整愠数楤敲瑣潩景搠灥牡浴湥慴景楦散獲Ⱞ〱⸰㌵ㄮ愮场獡楨杮传午⽒䱇剓甠楳杮戠潲浯ⱳ戠畲桳獥愠摮戠敬捡楨杮瀠睯敤祢攠杮条湩潣汯敩ⱳ猠牣扵楢杮琠楷散慷桳湩湡汣慥楮杮甠楳杮映敲桳眠瑡牥湩汣摵湩楳敤眠污ⱬ映潬牯猠慬湡潣畬湭ⱳ搠獩潰楳杮琠敨琠敨猠畬牲⁹ 慷瑳慭整楲污睡祡映潲桴浩敭楤瑡牰浥獩獥愠摮眠瑩楨桴湩瑩慩敬摡漠〵牦浯琠敨瀠牥灩敨祲漠桴慴歮楷桴畯⁴慣獵湩湡⁹慤慭敧琠桴硥獩楴杮猠牴捵畴敲愠摮椠獮慴汬瑡潩獮档牡敧湩汣摵湩桴灯牥瑡潩景瘠污敶ⱳ挠湯敶慹据湡楨敲挠慨杲獥漠潴汯湡獡瀠牥琠敨搠物捥楴湯漠桴敤慰瑲敭瑮漠晦捩牥瑥挠浯汰瑥猀浱Ϻ〰㔮⸷㨱敒瑣晩楹杮琠敨氠慥慫敧湩戠牯湩潰湩⁴景瀠扵楬慴⁰潣湮捥楴湯椠据畬楤杮攠牡桴眠牯硥慣慶楴湯椠污楫摮景猠楯潦硥潰楳杮琠敨戠牯湩潰湩⁴湩汣摵湩潣据敲整⼠琠牡挠瑵楴杮楤浳湡汴湩桴慤慭敧慳摤敬瀠敩散挬瑵楴杮愠摮爠浥癯湩慤慭敧潰瑲潩景瀠灩楬敮昬硩湩敮⁷慳摤敬瀠敩散氬祡湩〲㈯‵浭倠䍖ㄠ䬰⽧浣′楰数椠汰捡景搠浡条摥瀠牯楴湯漠楰数愠摮挠湯敮瑣湩楷桴攠楸瑳湩楰数氠湩ⱥ整瑳湩桴楬敮琠桴敲畱物摥琠獥⁴牰獥畳敲敲瑣晩楹杮愠祮搠晥捥獴渠瑯捩摥愠摮爠晥汩楬杮琠敨琠敲据敨獵湩硥慣慶整慥瑲湩氠祡牥潮⁴硥散摥湩〲浣搠灥桴椠据畬楤杮挠湯潳楬慤楴杮攠捡慬敹獲戠⁹慲浭湩Ⱨ眠瑡牥湩Ⱨ爠浥癯湩桴畳灲畬潳汩映潲桴潷歲猠瑩ⱥ眠瑩潨瑵挠畡楳杮愠祮搠浡条獥琠湡⁹瑯敨瑵汩瑩敩ⱳ椠据畬楤杮琠敨挠慨杲獥漠楨敲愠摮挠湯敶慹据景琠潯獬汰湡獴愠摮洠瑡牥慩獬琠桴敬歡猠瑩ⱥ戠楡楬杮漠瑵眠瑡牥楬桧楴杮慷捴楨杮楲扢湯映湥楣杮慣瑵潩潢牡獤牴晡楦楤敶獲潩Ɱ椠据畬楤杮挠獯⁴景瀠灩湡慳摤敬瀠敩散愠摮愠数桴楤敲瑣潩景搠灥牡浴湥慴景楦散獲攠捴潣灭敬整딮〱⸰㠵ㄮ刺捥楴祦湩桴敬歡条獥椠敶瑲捩污瀠灩景瀠扵楬慴⁰潣湮捥楴湯椠据畬楤杮攠牡桴眠牯硥慣慶楴湯椠污楫摮景猠楯潦硥潰楳杮琠敨瀠灩汥湩湩汣摵湩潣据敲整⼠琠牡挠瑵楴杮畣瑴湩湡敲潭楶杮搠浡条摥瀠牯楴湯漠
pipe, fixing new 20/25 mm GI pipe and specials in place of damaged portion of pipe and connecting with existing pipe line, testing the line to the required pressure, rectifying any defects noticed and refilling the trenches using excavated earth in layers not exceeding 20cm depth including consolidating each layers by ramming, watering, removing the surplus soil from the work site, without causing any damages to any other utilities, including the charges of hire and conveyance of tools, plants and materials to the leak site, bailing out water, lighting, watching, ribbon fencing, caution boards, traffic diversion, including cost of pipe and specials and as per the direction of departmental officers etc. complete./OD99679/2025-2026:Repairing leaks on 200/250 mm Sluice valve by removing cover of valve replacing damaged gland packing, refitting the valves after repairs including all repair charges of valve, bailing out water, labour for cleaning valve, removing and replacing RCC/CI lid /cover of valve chamber etc.jobÃOD99678/2025-2026:Repairing leaks on 80/100/125/150mm Sluice valve by removing cover of valve, conveying spindle, spindle nut, valve nut etc to work shop and repairing, spindle nut ,conveying to site replacing new gland packing if required, refitting the valves after repairs including all repair charges of valve, operation of valve, bailing out water, labour for cleaning valve, removing and replacing RCC/CI lid/cover of valve, chamber etc complete6OD99677/2025-2026:Repairing leaks on 80/100/125/150 mm Sluice valve by removing cover of valve replacing damaged gland packing, refitting the valves after repairs including all repair charges of valve, bailing out water, labour for cleaning valve, removing and replacing RCC/CI lid /cover of valve chamber etc.¼OD99674/2025-2026:Repairing leaks on 200/250mm Sluice valve by removing cover of valve, conveying spindle, spindle nut, valve nut etc to work shop and repairing, spindle nut ,conveying to site replacing new gland packing if required, refitting the valves after repairs including all repair charges of valve, operation of valve, bailing out water, labour for cleaning valve, removing and replacing RCC/CI lid/cover of valve, chamber etc complete2100.59.1:Cutting the bituminous / concrete roads with cutting machine for a minimum depth of 200mm along the sides of proposed alignment of the pipe to be laid without causing any damage to other utilities, including the charges for hire and conveyance of tools and plant, cost of consumables and charges for lighting, watching, ribbon fencing, caution boards, traffic diversion, and as per the direction of departmental officers etc. complete, before carrying out the demolition of bituminous / concrete road by mechanical means and carrying out the excavation.Ã100.59.2:Refilling the trenches with a wet mix of close graded granular materials (Stone aggregate - 25mm nominal size - 17.5%, Stone aggregate - 10mm nominal size - 17.5%, Crushed Stone - 2.36mm to 12.5mm - 25%, Stone chippings / screenings - 4.75mm nominal size - 20%, Stone chippings / screenings - 150 micron nominal size - 20%), mixing properly after adding sufficient quantity of water, refilling in layers not exceeding 150mm, compacting properly at Optimum Moisture Content with Surface Plate Vibrator and disposing the excavated material etc. complete, including traffic control, providing caution boards and as per direction of Engineer-in-charge for road restoration works in pipeline leak sites.È100.59.3:Restoring the road surfaces by providing and laying factory made cold bitumen-aggregate pot-hole repair mix in two layers of 25mm thick (total 50mm thick), by cleaning the surface with brooms etc. to remove dust/debris/water etc, placing the premix, compacting properly with hand-rammer etc. complete, including traffic control, providing caution boards and as per direction of Engineer-in-charge for road restoration works in pipeline leak sites.â16.42:Cement concrete 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 40 mm nominal size
stage.html
html • 0.02 MB
cancelled_1.pdf
pdf • 0.42 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
KWAGeneralConditionsforeTenderingV5.pdf
PDF • 0.69 MB
Tendernotice_1.pdf
PDF • 1.66 MB
Tendernotice_2.pdf
PDF • 0.61 MB
BOQ_1367845.xls
BOQ • 0.38 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .