Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹3.9 LAccepted-AOC | ₹3.9 L | 1 | Accepted-AOC LOWEST |
| 2 | Rejected-Technical | - | - | Rejected-Technical HIGHER |
| 3 | Rejected-Technical | - | - | Rejected-Technical HIGHER |
| Sl No | Description | Qty | Unit | GEORGEKUTTY JOSEPH L1 | Saju Thomas L3 | SUNNY K A L2 |
|---|---|---|---|---|---|---|
| 1.00Drainage | ||||||
| 1.00 | 3.5.2:Excavation in Soil with Dozer with lead upto 100 m <br> Excavation for roadway in soil by mechanical means including cutting and pushing the earth to site of embankment upto a distance of 100 m, including trimming bottom and side slopes in accordance with requirements of lines, grades and cross-sections. | 92.7 | cum | 59.75 ₹5,538.83 | 61.87 ₹5,735.35 | 60.91 ₹5,646.36 |
| 1.00 | 3.8.1:Excavation in ordinary Rock by manual means <br> Excavation in ordinary rock using manual means including loading in a truck and carrying of excavated material to embankment site with a lift upto 1.5 m and lead upto 50 m as per Technical Specification Clause 302.3.5. | 33.3 | cum | 520.24 ₹17,323.99 | 538.7 ₹17,938.71 | 530.29 ₹17,658.66 |
| 1.00 | 11.4.2.1:Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 <br>II. P.C.C grade M 15 <br> (i) Nominal mix (1:2.5:5) | 44.1 | cum | 7,106.26 ₹3.1 L | 7,358.4 ₹3.2 L | 7,243.45 ₹3.2 L |
| 1.00 | 11.4.3.1:Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203<br>III. P.C.C. grade M 20 (i) Nominal mix (1:2:4) | 4.2 | cum | 7,716.65 ₹32,409.93 | 7,990.5 ₹33,560.10 | 7,865.64 ₹33,035.69 |
| 1.00 | 11.4.4:Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203<br> IV. R.C.C grade M 20 | 1.62 | cum | 8,012.66 ₹12,980.51 | 8,297.01 ₹13,441.16 | 8,167.35 ₹13,231.11 |
| 1.01 | 11.8:Supplying, fitting and placingTMT bar reinforcement in foundation complete as per drawings and technical specifications Clauses 1000 and 1202 | 0.13 | tonne | 82,078.64 ₹10,670.22 | 84,991.4 ₹11,048.88 | 83,663.35 ₹10,876.24 |
Tender Value
₹4.2 L
EMD Value
₹10,579
Closing Date
25 Feb 2025, 1:00 pmClosed
Assistant Engineer
LSGD Sub division Thodupuzha
Thodupuzha BP 2024-25 Proj No 105/25 Kannadikandam Vattakuzhi road drainage construction
2025_LSGD_740216_1
105/LSGD/TDPA/2024-25
Open Tender
Civil Works - Others
180 days
Purappuzha
Please refer Tender documents.
7 documents required · 7 mandatory
₹935
Yes
₹10,579
Yes
17 Jun 2026
19 Feb 2025
26 Feb 2025
19 Feb 2025
25 Feb 2025
19 Feb 2025
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1189841.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid