| 1 | L1₹2.9 CrAdmitted-Finance N K TOWER NEAR KARGICHOWK DEHRADUN UTTARAKHAND | DEHRADUN | UTTARAKHAND | 248001 | ₹2.9 Cr | L1 | Admitted-Finance |
| 2 | L2₹3.3 Cr+₹37.5 L (12.8%)Admitted-Finance 5 A WEST REST CAMP DEHRADUN | ₹3.3 Cr+₹37.5 L (12.8%) | L2 | Admitted-Finance |
| 3 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Others-Earnest money, Tender Cost, bid validity Stamp Paper and other required documents not received |
| 4 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Others-Earnest money, Tender Cost, bid validity Stamp Paper and other required documents not received |
| Sl No | Description | Qty | Unit | M/S DOON INFRASTRUCTURE L2 | ANSHUMAN CONSTRUCTION COMPANY PVT LTD L1 |
|---|---|---|---|---|---|
| 1.00 | Earthwork in Hill Road (Hill Side Cutting/filling)
Excavation in Hilly Area for widening/restoration of existing road including defect cutting in all types of soils and rocks with earth and boulders and blasting boulders met at site true to lines as per plan, x-section L-section camber superelevation as required , also including uprooting and cutting of bushes dressing of road surface to the required level and slopes with all lead lifts and safe disposal of surplus excavated material at suitable dumping places by mechanical means / manual means indicated in the drawing without damaging forest and forest land including slip clearance during hill site cutting as directed by engineer in charge. also Including disposal at sutaible place by tipper surplus materials as per direction of engineer in charge
(As per P.W.D S.O.R Misc. Item No. 1-1-1, 1-1-2 and 1-1-3-A) | 1 | Job | 7,60,000 ₹7,60,000 | 7,20,000 ₹7,20,000 Lowest |
| 2.00 | Excavation in foundation for retaining & breast walls in all types of soils and rocks including lead, lift and disposal of surplus material as per direction of engineer - in - charge | 866.15 | Cum | 350 ₹3,03,152.5 | 334 ₹2,89,294.1 Lowest |
| 3.00 | Makjng Super Elevation by cutting of hill side in all sorts of soil/rock which may be met during execution of work as per Plan L-Section including disposal of all excavated material all leads and lifts dressing of road surface after cutting work removal & uprooting of trees. Also including all material, labour, T&P etc. Required for proper completion of the work. | 483.75 | Cum | 120 ₹58,050 | 98.75 ₹47,770.31 Lowest |
| 4.00 | Random Rubble stone masonary in Coolie walling including supply of all material, labour, T&P etc. required for proper completion of the work.(As per PWD Uttarakhand specifications) 30408 16-6 | 792.69 | Cum | 1,300 ₹10,30,497 | 1,240 ₹9,82,935.6 Lowest |
| 5.00 | Random Rubble Stone Masonry laid in 1:6 cement and sand mortar, in breast walls, retaining walls, parapets, scuppers, etc. including supply of all material, labour, T&P and royaltiies etc.(Asper PWD Uttarakhand specifications) | 707.36 | Cum | 3,700 ₹26,17,232 | 3,438.5 ₹24,32,257.36 Lowest |
| 6.00 | Random Rubble Masonary laid dry in breast wall,retaining wall, parapets,scupper etc. Including supply of all materials,labour,T & P & royality etc,required for proper complition of work.(As per PWD Uttarakhand specifications) | 495.69 | Cum | 2,200 ₹10,90,518 | 1,913 ₹9,48,254.97 Lowest |
| 7.00 | Cement plum masonry with 40% plum & 60% 1:3:7 cement concrete including supply of all material, labour, T&P etc. required for proper completion of the work.(As per PWD Uttarakhand specifications)For Parapet | 369.58 | cum | 4,300 ₹15,89,194 | 4,018.1 ₹14,85,009.4 Lowest |
| 8.00 | H.P stone filling in back of wallls including cost of all materials ,royality.t&p etc. complete. Rate as per S.I. No. | 106.29 | Cum | 840 ₹89,283.6 | 808 ₹85,882.32 Lowest |
| 9.00 | Construction of katcha drain including supply of all material, labour, T&P etc. required for proper completion of the work. | 4,200 | Rmt | 45 ₹1,89,000 | 37.5 ₹1,57,500 Lowest |
| 10.00 | PCC 1:3:6 in Foundation Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days. | 54.8 | Cum | 6,000 ₹3,28,800 | 5,728.5 ₹3,13,921.8 Lowest |
Tender Value
Refer Docs
EMD Value
₹6.1 L
Closing Date
18 Nov 2021, 3:00 pmClosed
S.E. 8th circle PWD New Tehri
Office of the S.E. 8th circle PWD New Tehri
Strengthening Premix Carpeting by Hot mix Plant and Seal coat etc. of NarendraNagar Dagar Soni Fart M/R under state sector in Vidhansabha NarendraNagar of District Tehri Garhwal including 3 year maintenance after proper completion of the work.
2021_pwd_37762_1
5472/03Cash-Tender-8/2021 Dated 16-09-2021
Open Tender
Civil Works - Roads
Item Rate
545 days
Narendranagar Block (Tehri Garhwal)
As per NIT, Technical Bid and BOQ
2 documents required · 2 mandatory
₹5,900
EE CD PWD Narenderanagar
₹6.1 L
S.E. 8th circle PWD New Tehri
30 Nov 2021
25 Oct 2021
18 Nov 2021
25 Oct 2021
18 Nov 2021
25 Oct 2021
29 Oct 2021
Amount
Earthwork in Hill Road (Hill Side Cutting/filling) Excavation in Hilly Area for widening/restoration of existing road including defect cutting in all types of soils and rocks with earth and boulders and blasting boulders met at site true to lines as per plan, x-section L-section camber superelevation as required , also including uprooting and cutting of bushes dressing of road surface to the required level and slopes with all lead lifts and safe disposal of surplus excavated material at suitable dumping places by mechanical means / manual means indicated in the drawing without damaging forest and forest land including slip clearance during hill site cutting as directed by engineer in charge. also Including disposal at sutaible place by tipper surplus materials as per direction of engineer in charge (As per P.W.D S.O.R Misc. Item No. 1-1-1, 1-1-2 and 1-1-3-A)
Excavation in foundation for retaining & breast walls in all types of soils and rocks including lead, lift and disposal of surplus material as per direction of engineer - in - charge
Makjng Super Elevation by cutting of hill side in all sorts of soil/rock which may be met during execution of work as per Plan L-Section including disposal of all excavated material all leads and lifts dressing of road surface after cutting work removal & uprooting of trees. Also including all material, labour, T&P etc. Required for proper completion of the work.
Random Rubble stone masonary in Coolie walling including supply of all material, labour, T&P etc. required for proper completion of the work.(As per PWD Uttarakhand specifications) 30408 16-6
Random Rubble Stone Masonry laid in 1:6 cement and sand mortar, in breast walls, retaining walls, parapets, scuppers, etc. including supply of all material, labour, T&P and royaltiies etc.(Asper PWD Uttarakhand specifications)
Random Rubble Masonary laid dry in breast wall,retaining wall, parapets,scupper etc. Including supply of all materials,labour,T & P & royality etc,required for proper complition of work.(As per PWD Uttarakhand specifications)
Cement plum masonry with 40% plum & 60% 1:3:7 cement concrete including supply of all material, labour, T&P etc. required for proper completion of the work.(As per PWD Uttarakhand specifications)For Parapet
H.P stone filling in back of wallls including cost of all materials ,royality.t&p etc. complete. Rate as per S.I. No.
Construction of katcha drain including supply of all material, labour, T&P etc. required for proper completion of the work.
PCC 1:3:6 in Foundation Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.
Stone masonry in cement mortar for substructure complete as per drawing & technical specification Clauses 702, 704, 1202 and 1204 Random rubble masonry In cement mortar (1:5) 12-4-3-3
Plastering with cement mortar (1:4), 15 mm thick on brickwork in substructure as per technical specification clauses 613.4&1204
Plain/reinforced cement concrete in substructure complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 ans 1204 RCC grade M 25
Supplying, fitting, and placing HYSD bar reinforcement in substructrue complete as per drawing and technical specifications Clauses 1002, 1010 and 1202. (The reinforcement steel shall be procured from original (primary) steel producers as per clause no. 2011.3.1 of MORD specifications (First Revision'2014) and IS 1786:2008 clause no. 1.6)
Providing weepholes in brick masonry/stone masonry, plain/reinforced concrete abutment, wing wall, return wall with 100 mm dia AC pipe extending through the full width of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing and technical specification Clauses 614, 709, 1204.3.7 12-9
Granular sub-base/base/surface course with local materials (Table 400.13) by mix in place method normal Construction of granular sub-base by providing local material spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at once and compacting with smooth wheel roller to achieve the desired density complete as per Clause 401.4 as per Technical Specification Clause 408.Using naturally occuring gravel
Providing, laying, spreading & compaction of stone aggregates of cu.m specific sizes to WBM specifications including spreading in uniform thickness, hand packing, rolling with power roller 8-10 tonn in stages to proper grade & camber, applying & brooming requisitet ype of screening / binding materials to fill up the intristices of coarse aggregates,watering & rolling making necessary earthenbund to protect edges lighting, guarding & barricatings, &maintenance of diversions etc.[Grading of no-2] (45-63 mm Size)
Providing, laying, spreading & compaction of stone aggregates of specific sizes to WBM specifications including spreading in uniform thickness, hand packing, rolling with power roller 8-10 tonn in stages to proper grade & camber, applying & brooming requisite type of screening / binding materials to fill up the intristices of coarse aggregates,watering & rolling making necessary earthen bund to protect edges lighting, guarding & barricatings,& maintenance of diversions etc.[Grading of no-3] (22.4 - 53 mm Size)
For Road Side Patries, Construction of Embankment with Material Obtained from Roadway Cutting Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of Tables 300.1 and 300.2 as per Technical Specification Clause 301.5
Providing and applying primer coat Low porosity with bitumen emulsion (SS-1) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70-1.0 kg/sqm using mechanical means as per Technical Specification Clause 502
Tack Coat Providing and applying tack coat with bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.25 kg per sqm on the prepared granular surfaces treated with primer & cleaned with hydraulic broom as per Technical Specification Clause 503.
Providing, Laying and rolling of Open-Graded Premix Carpet of 20 mm thickness composed of 13.2 mm to 5.6 mm aggregates to required line, grade and level to serve as wearing course on a previously prepared base with 30/40 TPH batch type hot mix plant using crushed aggregates of specific grading premixed with bituminous binder, transporting the hot mix to work site, laying with a hydrostatic paver finisher to the required grade, level and alignment, rolling with three wheel 80-100 KN static rollers to achieve the desired compaction, finished to required level and grade as per Specification Clause 508 complete in all respects. This work has to be executed by hot mix plant , Paver finisher etc. or as per Instruction of the Engineer in charge.
Seal CoatProviding and laying seal coat sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall using Type B as per Technical Specification Clause 510 Type B 5-12-A-B-1 Bitumen (VG-10)
Cement Concrete (PCC M-30) Pavement:-Construction of Un-reinforced, Cement concrete pavement, thickness as per design, over a prepeared sub base with 43 grade cement or any other type PCC Grade M-30, coarse and fine aggregates conforming to IS: 383,maximum size of coarse aggregate not exceeding 25 mm, mixed in a concrete mixer of not less then 0.2 cum capacity and appropriate weigh batcher using approved mix design, laid in approved fixed side formwork (Steel channel, laying and fixing of wedges, steel plates including levelling the formwork and laying and fixing of 125 micron thick polythene film, as per drawing), spreading the concrete with shovels, rakes, compacted using needle, and plate vibrators, finished in continuous operation and curing of concrete slabs for 14 days, using curing compound where specified and water finishing to lines and grade as per drawings and technical specifications.
Reinforced cement concrete M15 grade kilometre stone/local stone of standard design as per IRC:8 fixing in position including painting and printing, etc as per drawing and Technical Specification Clause 1703 Ordinary Kilometer Stone (Precast) S.O.R. No. 39234 10-10-(ii)
Reinforced cement concrete M15 grade kilometre stone/local stone of standard design as per IRC:8 fixing in position including painting and printing, etc as per drawing and Technical Specification Clause 1703 200 m stone (precast) 200 m stone (precast)
Providing edge stones of Size 450x350x100 mm on valley side of formation as per drawing and technical specification clause 1608.2.6
White washing of parapet walls of CD work and tree truncks White washing two coats on parapet walls and tree trunks including preparation of surface by cleaning scraping etc. as per technical specifications Clause 1915
Type - A, "W" : Metal Beam Crash Barrier Providing and erecting a "W" metal beam crash barrier comprising of 3 mm thick corrugated sheet metal beam rail, 70 cm above road/ground level, fixed on ISMC series channel vertical post, 150 x 75 x 5 mm spaced 2 m centre to centre, 1.8 m high, 1.1 m below ground/road level, all steel parts and fitments to be galvanised by hot dip process, all fittings to conform to IS:1367 and IS:1364, metal beam rail to be fixed on the vertical post with a spacer of channel section 150 x 75 x 5 mm, 330 mm long complete as per clause 810 ( if Concrete Required for Vertical post Fixing will be pai
Providing and Laying of Mechanically Woven Double Twisted Hexagonal shaped Gabions (Zinc plus PVC coated), of size 3mX1mX1m with two diaphragms at 1m interval, having mesh opening 100mmx120 mm, mesh wire diameter 2.7mm/3.7mm, edge/selvedge wire diameter 3.4/4.4 mm and lacing wire diameter 2.2/3.2 mm. (The work includes filling boulders in the gabions).
MAINTENACE AFTER COMPLETION OF WORK (FIRST YEAR )
Clearance of land slides in soil and ordinary rock by a bull-dozer D 80 A-12, 180 HP and disposal of the same on the valley side complete as directed by the Engineer-in-charge.
Maintenance of DrainsThe maintenance of drains include erosion, repair, clearing, cleaning, reshaping, regrading, deepening of side drains as well as catch water drains as per technical specification Clause 1907.
Maintenance of Hume pipe Culvert by way of Clearing, Cleaning, Erosion repair, repairs to cracks, parapet wall and protection work as per drawing and technical specification Clause 1908
Trimming of grass and weeds from the shoulders/berms and disposing off the same to suitable locations as per technical specifications Clause 1914
Maintenance of Earhen shoulder (stripping of excess soil) Stripping excess soil from the shoulder surface to achieve the approved level and compacting with plate compactor at OMC as per drawings and Technical Specification Clause 1903
White washing of parapet walls of CD work and tree truncks White washing two coats on parapet walls and tree trunks including preparation of surface by cleaning scraping etc. as per technical specifications Clause 1915
MAINTENACE AFTER COMPLETION OF WORK (SECOND YEAR )
Clearance of land slides in soil and ordinary rock by a bull-dozer D 80 A-12, 180 HP and disposal of the same on the valley side complete as directed by the Engineer-in-charge.
Maintenance of DrainsThe maintenance of drains include erosion, repair, clearing, cleaning, reshaping, regrading, deepening of side drains as well as catch water drains as per technical specification Clause 1907.
Maintenance of Hume pipe Culvert by way of Clearing, Cleaning, Erosion repair, repairs to cracks, parapet wall and protection work as per drawing and technical specification Clause 1908
Trimming of grass and weeds from the shoulders/berms and disposing off the same to suitable locations as per technical specifications Clause 1914
Maintenance of Earhen shoulder (stripping of excess soil) Stripping excess soil from the shoulder surface to achieve the approved level and compacting with plate compactor at OMC as per drawings and Technical Specification Clause 1903
White washing of parapet walls of CD work and tree truncks White washing two coats on parapet walls and tree trunks including preparation of surface by cleaning scraping etc. as per technical specifications Clause 1915
MAINTENACE AFTER COMPLETION OF WORK (THIRD YEAR )
Clearance of land slides in soil and ordinary rock by a bull-dozer D 80 A-12, 180 HP and disposal of the same on the valley side complete as directed by the Engineer-in-charge.
Maintenance of DrainsThe maintenance of drains include erosion, repair, clearing, cleaning, reshaping, regrading, deepening of side drains as well as catch water drains as per technical specification Clause 1907.
Maintenance of Hume pipe Culvert by way of Clearing, Cleaning, Erosion repair, repairs to cracks, parapet wall and protection work as per drawing and technical specification Clause 1908
Maintenance of Road SignsMaintenance of road signs by way of cleaning and repainting of mandatory / requlatory / cautionary / informatory and place identifications sign board as perdrawings and technical specification Clause 1910
Maintenance of 200 metre and km stonesMaintenance of 200 metre km stone by way of refiting of tilted stones repairing with cement mortar, cleaning, repairing and lettering on 200 metre km stone and 5th km stone as per drawing and technical specification Clause 1912
Trimming of grass and weeds from the shoulders/berms and disposing off the same to suitable locations as per technical specifications Clause 1914
Maintenance of Earhen shoulder (stripping of excess soil) Stripping excess soil from the shoulder surface to achieve the approved level and compacting with plate compactor at OMC as per drawings and Technical Specification Clause 1903
White washing of parapet walls of CD work and tree truncks White washing two coats on parapet walls and tree trunks including preparation of surface by cleaning scraping etc. as per technical specifications Clause 1915
Repair to pot holes and removal of loose material, trimming of sides, cleaning of surface by providing tack coat, 20 mm thick pre-mix carpet and seal coat type B specification Clause 1904.2
M/S DOON INFRASTRUCTURE
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .