16 Mar 2026, 6:00 pmClosed
Executive Engineer, Saurashtra Branch Canal Division No.6/1,Morbi
Maintenance and repair of Distributaries D-23 to D-26 and its all minor of Morbi Branch Canal for F.Y. 2026-27
279376
13 of 2025-26
Open
Civil Works - Canal
Works
Morbi
7 documents required · 7 mandatory
₹2,832
Yes
Executive Engineer SBC Dn No. 6/1, Morbi
₹1 L
Yes
21 Feb 2026
21 Feb 2026
21 Feb 2026
16 Mar 2026
21 Feb 2026
BILL OF QUANTITIES
BILL OF QUANTITIES
1. The bill of Quantities shall be read in conjunction with the Instructions to Bidder,
Conditions of Contract, Technical Specifications and Drawings.
2. The quantities given in the Bill of Quantities are estimated and provisional and are
given to provide a common basis for bidding. The basis of payment will be the actual
quantities of work ordered and carried out, as measured by the Contractor and verified
by the Engineer and valued at the rates and prices tendered in the priced Bill of
Quantities, where applicable, and otherwise at such rates and prices as the Engineer
may fix within the terms of the Contract.
3. The rates and prices tendered in the priced Bill of Quantities shall, except in so far as it
is otherwise provided under the Contract, include all construction plant, layout,
supervision, materials, erection, maintenance, insurance, profit, taxes and duties,
together with all general risks, liabilities and obligations set out or implied in the
4. The rates and prices shall be quoted entirely in Indian Currency.
5. A rate or prices shall be entered against each item in the Bill Quantities, whether
quantities are stated or not. The cost of Items against which Contractor has failed to
enter a rate or price shall be deemed to be covered by other rates and prices entered in
the Bill of Quantities (in case of Item rate contract).
6. The whole cost of complying with the provisions of the Contract shall be included in
the items provided in the priced Bill of Quantities, and where no Items are provided
the cost shall be deemed to be distributed among the rates and prices entered for the
related items of Work.
7. General direction and descriptions of work and materials are not necessarily repeated
or summarized in the Bill of Quantities. References to the relevant sections of the
contract documentation shall be made before entering rates or prices against each item
in the Bill of Quantities.
8. The method of completed work of payment shall be in accordance with the
specification for canal work Road and Bridge works. For building works
specifications for building are to be followed.
9. Errors will be corrected by the Employer for any arithmetic error pursuant to Clause
29 of the Instructions to Bidder.
10. Rock is defined as all materials which, in the opinion of the Engineer, required
blasting, or the use of metal wedges and sledgehammers, or the use of compressed air
drilling for its removal, and which cannot be extracted by ripping with a tractor of at
least 150 kw with a single rear mounted heavy duty ripper.
BILL OF QUANTITIES
(A) Percentage Rate Tender (Up to INR 50 Cr.)
Name of Division: Executive Engineer, S.B.C. Dn. No. 6/1, Morbi.
Name of Maintenance & Repair of Distributaries D-23 to D-26 and it’s all Minors of Morbi Branch
Work :- Canal for F.Y. 2026-27.
Description of Item Qty. Unit Rate in Amount in
Item No. Rs. Rs.
Earthwork / Back filling with selected earth brought 4032 cum 141.00
from out side borrow area or from excavated useful
1 material incl. watering ramming, Compaction with
pneumatic temping and all lead and lift etc complete.
Dismantalling the C.C. lining including disposing off
2 the dismantled materials as directed etc. complete.
(a) 7.5 cm Lining in Bed & Slope 16462.17 Sq.mt 87.00
(b) 12.5 cm Lining in Bed & Slope 638.45 Sq.mt 145.64
Providing and Laying in position nominal mix 16462.17 Sq.mt 372.43
Plain/Reinforced Cement Concrete Lining of 1:2:4
using cement,sand and crushed aggregate in Bed, Side
Slopes and curvature including batching, mixing,
transporting, placing, vibrating, smooth finishing,
membrane curing (by curing compound only) as
directed with all lead & lift etc. complete including
dressing the bed and trimming the canal section and
minor filling with murrum / earth / soil as per site
condition to correct profile incl.providing bitumen
joints at specified interval (Without Using Paver
Machinaries & without sleepers). For 7.5 cm thick
canal lining in Bed/Slope (Without Using Paver
Machinaries & without sleepers)
Providing and Laying in position nominal mix 665.00 Sq.mt 620.72
Plain/Reinforced Cement Concrete Lining of 1:2:4
using cement,sand and crushed aggregate in Bed, Side
Slopes and curvature including batching, mixing,
transporting, placing, vibrating, smooth finishing,
membrane curing (by curing compound only) as
directed with all lead & lift etc. complete including
dressing the bed and trimming the canal section and
minor filling with murrum / earth / soil as per site
condition to correct profile incl.providing bitumen
joints at specified interval (Without Using Paver
Machinaries & without sleepers). For 12.5 cm thick
canal lining in Bed/Slope (Without Using Paver
Machinaries & without sleepers)
Excavation in all sort of strata and formations incl. 1500.00 cum 83.00
depositing the unuseful excavated stuff as and where
directed incl sorting and stacking useful materials as
directed upto 30 mt lead etc. complete incl.
dewatering. ( Depth 0 TO 3.0 mt )
(For all type canal & foundation trenches of C.D.
works )A) IN OVERBURDEN INCL. HARD
Providing and laying CC 1:2:4 grade using cement, 3.84 cum 4303.00
sand and crushed metal including providing and
erecting necessary form work, centering, vibrating,
smooth finishing, watering and curing as directed with
all leads and lifts etc. complete. (b) Super structures.
Providing, supplying, Lowering, and laying ISI
Standard R.C.C. NP-3 Class pipes in standard lengths
of following Diameter suitable for either collar joints
or rubber ring joints including all taxes, insurance,
transportation, freight charges, octroi, inspection
charges, loading, unloading, conveyance to Site, and
7 jointing in proper position, grade and alignment at all
level as directed by Engineer-in-charge including all
labour, giving hydraulic testing as per ISI code.
NOTE:- One collar should be supplied with each full
length plain ended RCC pipe, cost included in rates
below. One rubber ring should be supplied with each
full length socketed pipe, cost included in rates below.
Providing and fixing welded wiremesh 1.8 mm x 3105.92 sqmt 85.73
8 65mm x 65 mm with 30 gsm galvanized coating
confirming to IS 280 -2006 as per specification.
Providing and Laying HDPE Geomembrane in bed and 3105.92 sqmt 50.81
slopes of canal at required level below lining as
per drawing and as directed etc. complete. (a)
micron - Type-I For smooth Geomembrane
Providing,cutting,bending,binding and fixing in 2.225 MT 66268.00
position as per drawing.TMT BAR , Fe-415
10 reinforcement for R.C.C. works and anchor bars incl
cost of black annealed 16 to 18 BWG M.S.. Wire
etc.complete with all lead and lift.
Clearing the silt from canal /drain bed by digging the 6030.99 cum 166.00
same to the required bed level and gradient including
depositing the excavated earth regularly on spoil bank
for utilizing the same for preparing the bund after
bracking the clods as and where directed for lead upto
30 mt and lift as under(B) Depth 0 to 3.0 mt
Desilting of various structures of canal and distribution 755.27 cum 296.00
system including depositing the same as directed with
12 all lift and lead for canal syphone,air vent,Turn Out
Kundies etc complete.
Total cost of work Rs.
I/We am/are willing to carry out the work at… ....................... %above/below percent(Should
be written in figures and words) of the estimated rate mentioned above. Amount of my /our
tender works out as under.
Estimated amount put to tender Estimated amount put to tender
Deduct………%below Add………%Above
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
21.02.2026 SBD M&R D-23 TO D-26 - Copy (1).pdf
BOQ 21.02.2026 SBD M&R D-23 TO D-26 - Copy (1).pdf
D-22-26 TENDER NOTICE-ADVT-ok - Copy.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .