CHIEF ENGINEER (G)
The works of Providing and Fixing of tap connection in bathroom of C-type quarter from direct water supply and Misc. Civil Work ( As and when required ) at GTPS
234397
EW-246
Open
Miscellaneous Works
Works
Gandhinagar
2 documents required · 2 mandatory
₹1,770
Gujarat State Electricity Corporation Limited Payable at Gandhinagar
₹11,560
18 Oct 2025
18 Oct 2025
18 Oct 2025
30 Jan 2026
18 Oct 2025
Name of Work:“ The works of Providing and Fixing of tap connection in
bathroom of C-type quarter from direct water supply and Misc. Civil Work ( As
and when required ) at GTPS.”
AT GSECL Gandhinagar TPS
EW- 246 PUR-F-006 RFQ-73782
NAME OF WORK: “The works of Providing and Fixing of tap connection in bathroom
of C-type quarter from direct water supply and Misc. Civil Work ( As
and when required ) at GTPS.”
DESCRIPTION PAGE NO.
ACKNOWLEDGEMENT OF TENDER FEE /EMD. 3 To
TENDER NOTICE.
DECLARATION FORM CUM UNDER TAKING TO BE
SIGNED BY BIDDER
RTGS DETAILS OF BIDDER
PROJECT SYNOPSIS
SCOPE OF WORK AND SITE CONDITION
SPECIAL NOTE FOR PRE-QUALIFICATION
GENERAL INSTRUCTION TO THE TENDERER
GENERAL CONDITIONS OF CONTRACT
TERMS AND CONTRACT FOR WORKS 76 To
GENERAL SAFETY RULES & LIST OF SAFETY TOOLS
PERFORMA FOR BANK GUARANTEE
INTEGRITY PACT
CERTIFICATE – A
ANNEXURE – I (DETAILS OF BANK FOR SOLVEANCY &
SPECIAL CONDITIONS FOR USE OF CEMENT
APPROVED NAME OF MANUFACTURERS OF 91 To
GENERAL GUIDELINES RELEVANT TO I.S.
GENERAL SPECIFICATIONS
TECHNICAL SPECIFICATION
DETAIL SPECIFICATION
SCHEDULE-B 110 To
Safe Maintenance Procedure
EW- 246 PUR-F-006 RFQ-73782
ACKNOWLEDGEMENT OF TENDER FEE /EMD
TENDER NOTICE
EW- 246 PUR-F-006 RFQ-73782
GUJARAT STATE ELECTRICITY CORPORATION LIMITED
Gandhinagar Thermal Power Station, Gandhinagar, India–382041.
[email protected] Website: www.gsecl.in
CIN:U40100GJ1993SGCO19988
e- Tender for the
“The works of Providing and Fixing of tap connection in bathroom of C-type
quarter from direct water supply and Misc. Civil Work ( As and when required
TENDER FEE PAID VIDE DEMAND DRAFT NO. _________________________________
EARNEST MONEY DEPOSIT PAID VIDE D.D. NO. _______________________________ DATED
1. The undersigned reserves the right to reject any or all tenders without
assigning any reasons thereof.
2. The Tender fee will be accepted in form of Demand Draft and Earnest Money Deposit
will be accepted in form of Demand Draft or Bank Guarantee of any bank as prescribe in
ANNEXURE- I drawn in favour of “GUJARAT STATE ELECTRICITY CORPORATION
LTD.” payable at Gandhinagar TPS
Chief Engineer (Gen)
Signature Of Contractor GSECL: GTPS
EW- 246 PUR-F-006 RFQ-73782
GUJARAT STATE ELECTRICITY CORPORATION LIMITED
Gandhinagar Thermal Power Station, Gandhinagar, India–382041.
[email protected] Website: www.gsecl.in
CIN:U40100GJ1993SGCO19988
Tender Notice No: For Civil works
CE [Generation], Gandhinagar, TPS invites “On-line Tenders” (e-tendering) for the work of “The works of
Providing and Fixing of tap connection in bathroom of C-type quarter from direct
water supply and Misc. Civil Work ( As and when required ) at GTPS.”. Tender Papers &
Specifications may be down loaded from Web site https://gsecl.nprocure.com(For view, down load
and on line submission) and GUVNL / GSECL web sites www.gsecl.in (For view only).All tender
documents are to be upload (Notarized / self-attested copies of original – as specified in tender document)
through online only (mandatory) on (n) procure portal excluding Tender fee and EMD Tender fee and EMD
are to be submitted physically by Registered Post A.D. or Speed Post addressed to: CHIEF ENGINEER
(GENERATION), GUJARAT STATE ELECTRICITY CORPORATION LTD, THERMAL POWER STATION,
GANDHINAGAR-382041, GUJARAT. “NO COURIER SERVICE OR HAND DELIVERY” will be accepted.
Tender Estimated E.M.D.
Name of Work Time Limit Fee Rs.+
No. Cost Rs. Rs.
EW- The works of
246 Providing and Rs.385319.01 04 (Four) Rs. 1500+ Rs.
Fixing of tap (In word Three Lac Months 270 = Rs. (Eleven
connection in Eighty Five Thousand from the 1770/-(one Thousand five
Three hundred date of thousand Hundred sixty
Nineteen Rupees and written seven only)
type quarter order to hundred
zero one paisa only.)
from direct commence seventy
water supply the work. (Non
and Misc. Civil Refundable)
when required )
180 Days [From the opening
1 Validity of Tender
of Technical Bid].
Last Date for Online tender / offer submission through
2 As per Tender Notice
(n)Procure only up to 18:00 Hrs(This is Mandatory)
Last Date for physical receipt of cover for DD / Bank
3 Guarantee / Online payment reference for Tender Fee and As per Tender Notice
EMD only up to 15:00 Hrs Through RPAD or Speed Post Only
Date of opening of online Technical Bid, all relevant
documents submitted through online process, Cover for
4 Tender fee and EMD at 15:30 Hrs (Online technical bid will As per Tender Notice
be opened for Bidders who have submitted Cover for Tender
Tentative date of on-line opening of price bid (if possible) at Party has to be in touch with
15.30 hrs. website www.nprocure.com
and also with e-mail sent by
Chief Engineer (Gen)
Signature Of Contractor GSECL: GTPS
EW- 246 PUR-F-006 RFQ-73782
1) Only following listed documents must be upload in n-process online only. No physical documents are to be
submitted except tender fee and EMD cover. Price Bid shall not be submitted in Hard copy.
1. Demand Draft for Tender Fee and EMD (Original) cover only to submit through RPAD/Speed post only.
2. The bidder shall have a separate Provident Fund Code of RPFC in the name of company. The bidder, who does
not possess such separate P.F. code, shall not be considered for acceptance of tender. The contractor has to
submit attested copy of such certificate showing P.F. code along with the tender.
3. Attested copy of PAN No.
4. Attested copy of work experience certificate for the similar works executed.
5. List of work in progress.
6. Attested copy of firm registration [Applicable only to the firms registered under Company Law]
7. Attested copy of partnership deed. [Applicable only to the partnership firms.]
8. Attested copy of power of attorney, if any, for signing the bid document.
9. Attested copy of balance sheet of profit & Loss account duly audited by Chartered Accountant of at least
financial years, if work estimate is more than Rs. 50 Lacks.
10. The Last three-year Annual Accounts, Positive Net worth certificate, and Average Annual Turnover certificate
would be obtained from the bidder. Details of equipment, tools and plants immediately available with the
tenderer for use of this work.
11. Details of technical personnel.
12. Undertaking duly Notarized as per attached Declaration Form
13. Any other documents required to verify technical, financial capability of the bidders & other Credentials
15. Attached The Copy Of GST Registration.
All such documents should be strictly uploaded in N-procure only expect Tender Fee and EMD details cover.
Otherwise the offer will not be considered and no any further communication in the matter will be entertained.
2) In case any deviation is found in Data / Details / Documents uploaded on N-procure online offer (e-tendering)
documents then such tender will not be considered and no any further communication in the matter will be
entertained. Tenders must be un-conditional. Conditional Tenders will be rejected.
3) Further bidders are requested to submit Technical Bid documents and price – bid i.e. Schedule-B on line only
and not to submit the Technical bid and price bid in physical form expect Tender Fee and EMD details cover.
This is mandatory. If Technical bid document and price bid is submitted in physical form expect Tender Fee
and EMD details cover, same will not be opened and only on-line Uploaded/submitted Technical bid document
and price will be considered for evaluation. The bidder is requested not to upload/submit the by online
(n)procure while bid submission on in (n)procure tender document, condition of the contract,
specification & other relevant documents, except documents as stated here above. Instead of the
same, the bidder shall upload on (n) procure scan copy of the duly Notarized Undertaking as stated below
declaration form on the stamp paper of Rs. 300/-. However, bidder may download tender document &
preserve with them in Hard Copy for their future reference. Later on, L1 bidder shall be asked to
collect the tender documents from the tender inviting authorities for the purpose of contract
agreement execution and place their signature with seal of the company.
4) It is mandatory for all the bidders to submit their tender documents viz. on-line (e-tendering) and uploading on
(n) procure in scheduled time. Tender documents submitted in physical form will not be accepted and
considered expect Tender Fee and EMD details cover. Also, all bidders shall submit required Physical
documents as stated in Tender Notice
5) GSECL reserves the rights to reject any OR all tenders without assigning any reasons thereof.
6) Tender Notice Number & name of the work shall be clearly written on the covers of containing the Tender Fee
7) Technical / Price Bids will be opened on the day and time indicated in the tender notice by an Officer nominated
by the Purchaser in the presence of such of the bidders who wish to be present. Any technical questions,
information and clarifications that may be required pertaining to this tender should be referred to the CHIEF
ENGINEER (GEN.) Gandhinagar TPS. Also during pre-bid meeting (if arranged) the same may please be
The exemption in payment of Tender Fee & EMD shall be given to the,
1. Micro & small-scale enterprises which participate directly in tendering process for the
product which they are manufacturing / service which they are providing and have
Udyam registration for items / service under procurement.
2. Start-ups which participate directly in tendering process for the product which they are
manufacturing/service which they are providing and re-cognized by DPIIT under the
Start-up India Program and has obtained Udyam registration.
3. Organization which has registration certificate for the manufacturing product of the
tender, from Gujarat Khadi Gramodyog Board or Khadi and Village Industries
Commission(K.V.I.C)or Commissioner of Cottage Industries.
EW- 246 PUR-F-006 RFQ-73782
4. Board/Corporations/PSUs of the Central/State Government for their own manufactured
5. State Government recognized organizations like(i) organizations for blinds, dumb and
deaf, disabled, mentally disabled persons;(ii)women's self-help group recognized by
Gujarat Livelihood Promotion Company; which participate directly in tendering process for
the product which they are manufacturing / service which /they are providing.
Chief Engineer (Gen)
Signature Of Contractor GSECL: GTPS
EW- 246 PUR-F-006 RFQ-73782
DECLARATION FORM CUM UNDER TAKING TO
BE SIGNED BY BIDDER
RTGS DETAILS OF BIDDER
PROJECT SYNOPSIS
SCOPE OF WORK AND SITE CONDITION
SPECIAL NOTE FOR PRE-QUALIFICATION
GENERAL INSTRUCTION TO THE BIDDER
EW- 246 PUR-F-006 RFQ-73782
(To be uploaded on (n) procure online process duly notarized on Rs. 300/- Non –
Judicial Stamp Paper)
DECLARATION FORM
Name of Work: “The works of Providing and Fixing of tap connection in bathroom
of C-type quarter from direct water supply and Misc. Civil Work ( As and when
required ) at GTPS.”
Tender No/ RFQ No:
1. I/We hereby declare that I/We have carefully studied the entire tender placed on the
WEB site and conditions of contract, specifications and other documents of this work
mentioned in the tender and abide by the same. Also, I/We hereby agree to execute the
same accordingly.
2. I/We hereby abide to execute the contract agreement by downloading the copies of the
conditions of contract, specifications and other documents of this work of otherwise I/we
will get copy of the same from the office of the tender inviting authority and the same will
be acceptable to me/us.
3. I/We hereby accept and confirm that any dispute on this regard shall not be entertained
by the tender inviting authority.
4. I/We hereby declare that I/We have visited the work site and fully acquainted
myself/ourselves with the local situations regarding materials, labour and other factors
pertaining to the work before submitting the tender.
5. I/We hereby confirm that our offer is Un-conditional and without any technical &
commercial deviations.
6. Should this tender be accepted, I /We hereby agree to abide by to fulfill all the terms-
conditions and provision of the Tender and Contract for Works as applicable and default
thereof, to forfeit and to pay to the Gujarat State Electricity Corporation Limited the sums
7. The full value of the “Earnest Money Deposit” paid herewith should be absolutely forfeited
to the Corporation, should I/ we do not deposit the specified amount of specified Security
Deposit is to be recovered from the first RA bill.
EW- 246 PUR-F-006 RFQ-73782
8. If, I fail to submit all required documents with application or tender copy ( in each tender
) then my tender will be cancelled, which is binding to me.
9. If, full or part work will be given to me, it will be accepted to me with same terms, rate &
10. I, ______ proprietor / owner / partner / Authorized Agent of M/s. ______ do hereby also
declare and undertake as under:
a) That in capacity of independent contractor for M/s. ______ (Sub-Contractor of
M/s. ______ ) worked as contractor at GSECL, ___________Thermal Power Station for
the nature of work of ______ against work Order No. ______ Dt. ______., I have
complied with the provisions of all laws as applicable. I have paid the wages for the
month/s of my contractual period which is / are not less than the minimum rates as
applicable, to all my employee/s and no other dues are payable to my employee/s.
b) That I have covered all the eligible employee/s under the Employees‟ Provident
Funds and Miscellaneous Provisions Act, 1952 and deposited the contributions under my
PF Code No. ______, place: ______ for the month/s of my contractual period and as
such no amount towards contribution whatever is payable.
c) I further declare and undertake that in case any liability pertaining to any of my
worker, labour, employee/s is/are to be discharged by the principle employer i.e. Gujarat
State Electricity corporation Limited, ___________Thermal Power Station due to my
lapse, I undertake to reimburse the same or the principle employer is authorized to
deduct the same from my dues as payable.
d) I further declare and undertake the legal consequences which may arise in future
under the said work order awarded, and I bond myself to resolve the same at the risk
and cost of M/s. ______.
authorized signatory of M/s ______________________________________________
their proprietor / any partner / any directors of the firm is not stop deal and / or banned
for business dealing and / or black listed by GUVNL and / or their any subsidiary
company viz. GSECL / GETCO / DGVCL / MGVCL / UGVCL / PGVCL as well as
Government and / or Semi Government company / department.
Seal & Signature of the Bidder
Phone / Mobile/ Fax No. & Company‟s Seal
EW- 246 PUR-F-006 RFQ-73782
e- Tender for the work of “The works of Providing and Fixing of tap connection
in bathroom of C-type quarter from direct water supply and Misc. Civil Work ( As
and when required ) at GTPS.”
RTGS DETAIL OF BIDDER
Following RTGS details shall be submitted by agency along with the tender for direct
deposit of payment to the beneficiary account. Bidder has to submit the details as under:
1 Name of Bidder :-
2 Address for correspondence :-
4 Phone / Mobile No. :-
5 Name of Beneficiary :-
6 Bank Account Number of :-
7 Name of Bank of beneficiary :-
8 Name of Bank, branch & address :-
9 Type of account :-
10 Bank Code :-
11 RTGS Code :-
12 IFSC Code :-
EW- 246 PUR-F-006 RFQ-73782
Project Synopsis and Data
1) Location :- Gandhinagar Thermal power station
2) Purchaser :- GUJARAT STATE ELECTRICITY CORPORATION
3) Engineer :- Chief Engineer(Gen)
4) Site of Project :- Gandhinagar,Gujarat State
5) Nearest town :- Gandhinagar
6) Nearest Railway Station :- Gandhinagar Capital(Ahmedabad is situated at
a distance of about 30.00Km)
7) Nearest Port :-
8) Nearest Air Port :- Ahmedabad-20Km(Approx)
9) Access Road :-
10) Site Elevation from MSL :- RL 81.5 M(floor level)
11) Meteorological Data
Ambient Air temperature
1] Highest monthly mean of daily :- 350 C
Max. Temperature
2] Maximum dry bulb :- 450 C
Temperature ( In 0C)
3] Minimum dry bulb :- 8.60 C
Temperature ( In 0C)
1] Average annual rainfall :- 1000 to 1200mm
2] For 01 hour ( In mm) :- 75 to 100mm
3] For 24 hour ( In mm) :- 250mm
Wind velocity
1] Maximum wind velocity :-
2] Wind direction – N,NE & SW :-
3] For 24 hour ( In mm) :-
Relative Humidity
1] Annual mean humidity ( In %) :- 50 to 60%
2] Maximum humidity (In %) :- 98%
3] Minimum humidity (In %) :- 2%
4] Type of Atmosphere :- Dry
12) DESIGN DATA
Seismic Data :-
Zone :- Zone-III as per IS 1893-1975
Ambient temperature :-
Other Data :-
EW- 246 PUR-F-006 RFQ-73782
SCOPE OF WORK AND SITE CONDITIONS
The main scope of work is “The works of Providing and Fixing of tap connection in
bathroom of C-type quarter from direct water supply and Misc. Civil Work ( As
and when required ) at GTPS.” Work shall be carried out as per items specification and
as directed by E.I.C. The work includes all materials, tools, tackles, scaffolding required &
successful completion of work.
Under the scope of this tender the agency has to carry out the subject work, various civil
works as per all items of Schedule B and as per detail technical specifications items. The
quantities taken under individual items are very tentative. However the agency has to carry
out the works as per the Company’s requirements anywhere in Power House area.
The agency has to carry out the works as per item & specifications of the tender by providing
all materials of best quality and of standard manufactures as the samples approved by EIC
and providing best workmanship through expert manpower.
The agency has to carry out the works as per the priority & schedule given by EIC time to
time even in on or off working hours of the office. The agency will take complete care and
will not damage any other structure in premises of company.
The agency has to carry out all the works by taking all due cares of safety, security norms,
with all risks including scaffolding, strutting, shoring, etc up to any height irrespective of
quantum of the work.
Contractor has to make arrangement for workable site condition with the co operation of
departments of company and agencies, all necessary arrangement to get work permit is to
be made by contractor. Day to day cleaning is required after completion of job. The removed
materials and any other unwanted materials are to be transported and taken away as
instructed by E.I.C.
All safety measures shall be taken by the contractor with his own cost.
The major works involvement generally mentioned as here under---
The works of providing and Fixing of tap connection in bathroom of C-type quarter from direct
Misc plumbing work.
Chief Engineer (Gen)
Signature Of Contractor GSECL: GTPS
EW- 246 PUR-F-006 RFQ-73782
Registration in VMS System
Additional Note: Vendor gets to register in VMS System through vms.guvnl.com. For
registration following documents are required and mail to [email protected] and
[email protected]. After registration vendor have to upload the invoice in the VMS system
for smooth functioning of payment.
Documents required for Registration:
(2) GST Certificate Copy
(4) Full Name of Vendor
EW- 246 PUR-F-006 RFQ-73782
SPECIAL NOTE FOR PRE-QUALIFICATION
Name of work: - “The works of Providing and Fixing of tap connection in bathroom
of C-type quarter from direct water supply and Misc. Civil Work ( As and when
required ) at GTPS.”
The tender documents are of two separate bids i.e. technical and price bids. Bidder is requested
to submit the technical bid with the following credentials for post-qualification.
1. Contractor should produce evidence of having experience of having successfully completed
similar works as defined hereunder during the last seven years ending last day of the month
previous to the one in which tender is invited ongoing works, satisfactory progress within
stipulated time, etc. secured from Govt., /Semi Govt., along with certified copies of documentary
evidence, preferably photo copy of work experience certificate secured from GSECL/ GETCO /
DISCOMS / GEB / Central / State Government/Semi- Government. The experience should be
either of the following-
a. Three similar completed works each costing not less than the amount equal to 40% of the
estimated cost.
b. Two similar completed works each costing not less than the amount equal to 50% of the
c. One similar completed works each costing not less than the amount equal to 80% of the
2. Similar work means : General civil construction & maintenance work.
3. Contractor has to submit satisfactory work completion certificate of the client. Experience
certificate of work executed with private firm shall not be accepted. Experience as a
joint venture or sub-contractor is not allowed and price bid of such bidders will be
4. To pay EMD in form of DD OR in form of B.G. given by bank as described in the Annexure – I.
All the bidders will be required to pay Tender Fees plus 18% GST and EMD as mentioned in the
Tender Document either in Demand Draft, Pay Order or Bank Guarantee (only for EMD) in favour of
Gujarat State Electricity Corporation Limited payable at Gandhinagar, Gujarat. The scanned copy
of original document shall have to be uploaded online with the bid and RPAD or Speed Post only
addressed to The Chief Engineer (G), Gujarat State Electricity Corporation Limited, Thermal
Power Station, Gandhinagar-382041.
5. Tender Fee: The tender fee shall be accompanied in the form of DD.
The exemption in payment of Tender Fee & EMD shall be given to the,
1. Micro & small-scale enterprises which participate directly in tendering process for the product
which they are manufacturing / service which they are providing and have Udyam registration for
items / service under procurement.
2. Start-ups which participate directly in tendering process for the product which they are
manufacturing/service which they are providing and re-cognized by DPIIT under the Start-up
India Program and has obtained Udyam registration.
3. Organization which has registration certificate for the manufacturing product of the tender, from
Gujarat Khadi Gramodyog Board or Khadi and Village Industries Commission(K.V.I.C)or
Commissioner of Cottage Industries.
4. Board/Corporations/PSUs of the Central/State Government for their own manufactured
5. State Government recognized organizations like(i) organizations for blinds, dumb and deaf,
disabled, mentally disabled persons;(ii)women's self-help group recognized by Gujarat Livelihood
Promotion Company; which participate directly in tendering process for the product which they
are manufacturing / service which /they are providing.
Vendor Registration with GSECL is not compulsory for submitting this tender.
EW- 246 PUR-F-006 RFQ-73782
(1) If any Bank Guarantee submitted against EMD/security deposit/PBG, same should be valid one
year from the date of expiry of BG. Bank Guarantee should be confirmed through Structured
Financial Messaging system (SFMS). SFMS allows intra/interbank message transfer system of
banking. Our bank details are as under.
ACCOUNT NAME GSECL
BANK NAME & BRANCH BOB, SECTOR-21, GANDHINAGAR
IFSC CODE BARB0GANDHI
6. The Last three-year Audited Annual Accounts, Positive Net worth certificate, and Average Annual
Turnover certificate certified by charted accountant as Per Qualification Requirement.
7. Separate employee’s provident fund code number towards registration of firm with
Regional P.F. Commissioner.
8. Attested copy of relevant document duly signed and sealed on each and every page shall be
9. Declaration form in original duly notarized on stamp paper of Rs. 300/- (As referred in Tender
10. Attach copy of GST Registration.
11. Bidder shall have to submit the PAN card No for Income Tax with documentary proof.
12. Details of the partnership deed.
13. Details of Tools, tackles, equipment and personals available with firm relevant to the
job/subject matter.
14. Copy of the updated valid labor contract license from the appropriate authorities and updated
workman group insurance policy covering labor engaged.
15. The tenderer shall have to produce the document of last three years annual account, i.e. profit
& loss account and balance sheet, if the estimated cost of tender is more than 50 lakhs along
with technical bid.
16. Details of skilled/semi-skilled persons presently employed by the contractor having sufficient
knowledge of similar jobs.
17. TPI should be mandatory to submit as per cl no.5 of Section B (i.e General Instruction to the
The above documents will be analyzed and after satisfaction, the price bid will be opened. GSECL
may verify the documents, experience certificates from authority who have issued such
certificates / details.
On opening of Technical Bid, if any required attested documents are missing in technical bid
submitted by the bidder, and tender inviting authority is in the opinion that in absence of these
documents sufficient competition is not possible, in that case to have fair competition, the
tender inviting authority may inform only once by Registered post to bidder/bidders to
submit the missing required documents within stipulated time limit and failing which
bidder/bidders will be declared technically disqualified for not submitting the required
documents along with technical bids without any further notice. However, document will
be considered valid only if it is for the period of last day of month previous to the one in which
tenders are invited.
Chief Engineer (Gen)
Signature Of Contractor GSECL: GTPS
EW- 246 PUR-F-006 RFQ-73782
GENERAL INSTRUCTIONS TO THE BIDDERS
1. SUBMISSIOIN OF TENDER
The tender should be uploaded/ submitted online on n-procure process.
Technical bid cover:- This cover shall contain all relevant attested qualifying documents as prescribed
in tender notice along with tender fee & EMD. Bidder shall have submit Tender Fee and EMD cover only,
All other require document to be upload on online (n)procure process only
Note: - If attested copies of qualifying documents stated as prescribed in tender notice are not
found in on-line Technical bid, but same should be submitted by mail during scrutiny will be treated
as final to consider the bid for pre-qualification. Any missing documents, if required will be asked
from the bidder as mentioned in this tender elsewhere. If party has not submitted tender in online is
liable to be ignored.
“Please note that the Notarized / self-attested copies of original required documents should be
invariably uploaded in n-procure portal before due date and time in pdf form (Scanned copy). This is
mandatory. No physical documents are required to be submitted except tender fee and EMD.
The price bid shall have to be submitted online only. The percentage rates and price shall be written
both in words, and figures and the units in words. In case of any ambiguity or mistakes, the unit rates
and prices written in words shall be considered as final.
Offered rate shall include cost of all Materials, wastage of material , Labours for all leads and lifts,
Supervision, setting out works, Machinery and equipment with its mobilization / demobilization,
transportation charges, Clearing of the site both prior to commencement and after completion of work.
Consumables such as, but not limited to petrol, oil, diesel, lubricants, drill bits, pipes, ropes etc.
Construction facilities such as scaffolding, tarpaulins, wind break, etc., Overheads / profits of Contractor
for due performance of the work under this contract.
Applicability of goods and service tax:-
1) The tenders shall be evaluated on firm price and cost with GST and cess as applicable unless otherwise
mentioned in the tender documents.
2) IF the supplier/contractor have opted for the composition scheme of GST, the same must be clearly
specified with valid declaration and certificate from department. In the event of withdrawal/ cessation of
the supplier from composition scheme during the tenure of the contract, the rate(i. e. price) mentioned
in the price bid shall be final and any additional GST will have to be borne by the tenderer himself, In no
case additional amount towards GST or otherwise will be paid/reimbursed to supplier/contractor.
3) The bidder shall have to inform their GST no. of the registered place(s) where from the bidder intends to
supply the goods/services, meaning there by the bidder has to supply the goods/services from the
relevant declared/ registered place(s) of supply only.
4) The bidder shall not include GST in their quoted rates; but the bidder has to separately indicate the GST
rate, amount in the price bid schedule.
5) In-case Govt notification comes for change in GST , the same will be applicable.
6) Bidder should indicate GST no.( copy of GST registration to be enclosed) and PAN NO. (copy of PAN to
be enclosed) Tenders submitted without GSTIN No by the firms, the offer will be rejected without
entering into further correspondence.
Further information required, if any, can be had from the office of the Chief Engineer, GSECL, GTPS.
But it must be clearly noted that the tenders must be received complete in every respect by the due
i. The bidder must clearly quote rates in figure as well as in words. In case of any discrepancy, whatever
written in words shall prevail.
ii. No deviation in terms & conditions, Schedule-B and technical specifications will be entertained. Any
ignorance for this shall not relieve the contractor from his contractual liability arising as per tender
documents and conditions contained in it.
iii. The bidders are required to quote only firm prices. No variation will be accepted on price/ raw
EW- 246 PUR-F-006 RFQ-73782
materials/ finished products or on any other cause.
iv. The bidders should note that the completion of above mentioned works in all respect in accordance
with the time limit given is very important and should be strictly adhered to. The work is to be
completed in time limit from the date of issue of written order to commence the work by the Chief
Engineer (Gen.), GSECL, Gandhinagar TPS.
v. The bids should be valid for a minimum period of 180 Days from the date of opening of technical bid.
During this period tenderer shall not be allowed to withdraw their tender and if withdrawn, the Earnest
Money Deposit submitted with the tender will be forfeited.
vi. The works covered under these specification shall be carried-out and governed by “Tender and
contract for Works” booklet appended herewith except where conditions specified in this
specifications.
vii. The successful bidder shall have to enter in to an agreement for contract as per G.S.E.C.L rules on a
stamp paper of Rs.300/- and necessary stamp duty charge shall be borne by the
contractor/consultant.
viii. The complete specification comprises of the following.
Bill of Quantities (Schedule-B), instructions to the bidders, Tender specifications and scope of work,
Tender and contract for Works booklet, General Conditions, Instructions to bidder & Technical
specifications. All these sections are complimentary to each other. The particulars and requirements
contained herein shall cover the execution of the works covered under these specifications.
ix. The tenderer must visit the site of works and see for him self the site conditions regarding availability
of approach road during all seasons and other matters affecting the above works before submitting the
x. The submission of tender by a contractor implies that he has read these instructions the conditions of
contract etc. and has himself aware of the scope and specifications of the work to be done and of
conditions and local conditions and other factors bearings on the execution of the works. GSECL will
not therefore after acceptance of contractor's rate pay any extra charge for any other reason; in case
the contractor is found later on to have misjudged the site condition.
xi. GSECL‟s authorized officers who accepts tender, shall have the right of rejecting all or any of the
tenders and will not be bound to accept the lowest offer nor to assign any reason whatsoever for the
rejection of any tender or all tenders.
xii. Bidders shall provide evidence of their continued eligibility to the satisfaction of the owner.
xiii. Bidders shall not be listed under a declaration of ineligibility for corrupt or fraudulent Practices issued
by the Govt., the list of black listed Contractors announced by GSECL (erstwhile GEB) Govt. of Gujarat
or its Public Sector undertakings or the contractors who are under stop dealing in GUVNL and /or their
any subsidiary company viz. GETCO/MGVCL/UGVCL/PGVCL/DGVCL.
xiv.The bid, and in case of a successful bid, the Form of Contract Agreement, shall be signed with the
name of Firm / company which will be legally binding on all partners / parties.
xv.If the application is made by an individual, it shall be signed by the individual above his full typed
written name and current address.
xvi.If the application is made by a proprietary firm. It shall be signed by the proprietor above his full
typed written name and the full name of his firm with its current address.
xvii.If the application is made by a partnership firm, it shall be signed by all the partners of the firm
above their full type written names and current addresses or alternatively by partner holding power
of attorney for the firm in which case a certified copy of the power of attorney shall accompany the
application. A certified copy of the partnership deed, full names and current addresses of all the
partners of the firm shall also accompany the application.
xviii. If the application is made by a limited company or a Corporation, it shall be signed by the
authorized person holding power of attorney for signing application in which case a certified copy of
the power of attorney shall accompany the application. Such Limited company or Corporation
may be required to furnish satisfactory evidence of its existence before the pre-qualification evaluation.
They should also furnish Articles of Memorandum of Association. If the application is made by group of
companies, it shall be signed by the authorized person. The authority letter shall be accompanied with
the application.
1. SECURITY DEPOSIT.
In tender process for L1 bidder(lowest bidder) security deposit will be charged as per
EW- 246 PUR-F-006 RFQ-73782
Category of the Unit Security Deposit
Works up to Rs. 5 Works More than Rs.
Enterprise or Organization Exempted 3% of Order End Cost
which are exempted from
paying Tender Fee & EMD
For all other Enterprises 5% of Order End Cost 5% of Order End Cost
ELIGIBILITY FOR EXEMPTION:
1. Micro & small-scale enterprises which participate directly in tendering process for the product
which they are manufacturing / service which they are providing and have Udyam registration
for items / service under procurement.
2. Start-ups which participate directly in tendering process for the product which they are
manufacturing/service which they are providing and re-cognized by DPIIT under the Start-up India
Program and has obtained Udyam registration.
3. Organization which has registration certificate for the manufacturing product of the tender, from
Gujarat Khadi Gramodyog Board or Khadi and Village Industries Commission(K.V.I.C)or
Commissioner of Cottage Industries.
4. Board/Corporations/PSUs of the Central/State Government for their own manufactured items.
5. State Government recognized organizations like(i) organizations for blinds, dumb and deaf,
disabled, mentally disabled persons;(ii)women's self-help group recognized by Gujarat Livelihood
Promotion Company; which participate directly in tendering process for the product which they are
manufacturing / service which /they are providing
Note: Security Deposit will be collected from the successful tenderer at the rates mentioned above.
This may be recovered by deduction through running bills of the contractors and / or by treating the
Earnest Money Deposit (Bid Security) paid at the time of submission of the tender.
6. The Bank Guarantees will be executed on the standard form prescribed by the corporation. In case of the
Bank Guarantees furnished / submitted, they should have clear one time validity till the completion of the
order in all respects and up to the expiry of Guarantee period from the date of the work completion. Bank
Guarantee for Interim period will not be allowed. If by any reasons the work period is extended then
contractor should undertake to renew the Bank Guarantee at least one month before the expiry of the
validity failing which GSECL will be at liberty to encash the same.
“It shall be mandatory to submit security deposit as per above table within 10 days from the
date of issue of Letter of Intent before order placement. In case when successful bidder not
at all responding within notice period or withdraws his offer then his EMD shall be forfeited
and he will not be allowed to participate in the tenders invited from the same office for the
period of One year for that place from where tender is invited.”
If the Tenderer fails to pay the Security Deposit or defaults in execution of the orders
placed or if GSECL suffers any financial loss due to this, then GSECL will be at liberty to adjust
the amount from other orders of the same firm or by encashing the Bank Guarantee.
All the costs of the stamp papers, other than required for payment is to be made through SIDBI /
ICICI by Board, are to be borne by you as per the Govt. of India‟s latest guidelines.
The security deposit shall be released on finalization of final bill / successful completion of the work.
The same shall be paid in DD or in the form of Bank Guarantee on any of the banks describe in Annexure-I as
per the GoG notification issued from time to time will be applicable. Total S.D. equivalent 5% of contract value is
to be recovered from the first RA bill.
2. MAINTENANCE:
i] The contractor shall be responsible to make good and remedy at his own expense any defect which
may develop or may be noticed before the period mentioned hereunder from the certified date of
completion. The same shall be attended within 15 days of receipt of the notice. In the case of failure
on the part of the contractor, the Engineer-in-charge may rectify or remove or re-execute the work at
the risk & cost of the contractor. The Engineer-in-charge shall be entitled to appropriate the whole or
any part of the amount of security deposit towards the expenses, if any, incurred by him in
rectification, removal or re-execution. The defects liability period shall be as under,
a) For all works costing up to Rs. 50,000 (amount put to tender), the period shall be 03 months
from the certified date of completion.
EW- 246 PUR-F-006 RFQ-73782
3. TIME LIMIT FOR WORK:
The scheduled time limit for the completion of work shall be 04 (Four) calendar months from the date
of issue of letter to commence the work. However extension in time limit will be granted by GSECL for
the genuine reasons only as per terms of the contracts.
4. TERMS OF PAYMENTS:
Contractor shall be paid RA bill after observing GSECL‟s general procedure and submission of bill by the
agency. Also, 75% payment shall be made immediately within a week period on receipt of recorded bill
by Account Section without checking of detail bill and compliance of queries & statutory requirement.
However, remaining balance 25% amount shall be released only after through checking of detail bill
and compliance of various quarries, statutory compliance etc. The above payment term is applicable to
all the bills of general civil works & ARC/BRC works, provided the bills are recorded regularly and
submitted to Account Section within Ninety [90] days. If the contractor fails to submit the bills
regularly in such a way so that the same cannot be recorded and submitted to account section within
Sixty [60] days, ad-hoc payment as stated above, may not be released and payment will be released
as per GSECL‟s general procedure. The period of Sixty [60] days shall be considered from the date of
receipt of last R.A. Bill by Account Section.
5. Applicable for Works tender having estimated cost above Rs 25 Lakhs (without Tax)):
“All bidders shall submit the details/documents in support of Technical Qualification Requirements
duly certified and verified for authenticity from Specified Third-Party Inspection Agency (TPIA) or
Statutory Auditor of their Company or Practicing CA/CA Firm along with a certificate regarding
verification of authenticity of documents as per the format placed at Appendix 1. All the documents
submitted by the bidder in support of meeting Technical QR shall be digitally signed by the Specified
Third-Party Inspection Agency (TPIA) or Statutory Auditor of their Company or Practicing CA/CA
Firm. In case documents are certified & verified for authenticity through TPIA, the verification and
certification of authenticity of documents is acceptable from any of the following TPI As:
1. M/s Competent Inspectorate and Consultants Pvt. Ltd, Hyderabad, India.
2. M/s Gulf Lloyds Industrial Service India Pvt. Ltd.-Ahmedabad.
3. M/s International Certifications Services.
4. M/s Intertek India Pvt. Ltd.
5. M/s SGS India Pvt. Ltd.
6. M/s Moody International (India) Pvt. Ltd.
7. M/s TUV SUD South Asia (P) Ltd.
8. M/s TUV Rheinland (India) Pvt Ltd.
9. M/s Bureau Veritas (india) Pvt. Ltd.
10. Hertz Inspection & services Pvt. Ltd.
11. IRCLASS Systems and Solutions Pvt. Ltd.
The Bidder shall be responsible to get their documents/ credentials verified & certified by the
Specified Third- Party Inspection Agency (TPIA) or Statutory Auditor of their Company or Practicing
CA/CA Firm in support of Technical QR. All the costs pertaining to third party verification and
certification (including those by statutory auditors) shall be borne by the Bidder. GSECL shall have
no liability (financial or otherwise) towards the same and shall not be liable for any claim/ dispute
between the bidder and the Specified Third-Party Inspection Agency (TPIA) or Statutory Auditor of
their Company or Practicing CA/CA Firm.”
The following website may be referred for contact details of above TPIAs:
http://nabcb.qci.org.in//accreditation/reg_bod_inspection_bodies.php.
This is to be implemented immediately.
EW- 246 PUR-F-006 RFQ-73782
Undertaking from Third Party Inspection Agency/Statutory Auditor or Practicing
(On letter head digitally signed by a person duly authorized to Sign on behalf of the firm)
Power Station ……………….
Subject: Authentication of veracity of documents submitted by M/s …… in support of
Meeting the Qualifying Requirements
Ref: Tender no. …………………..
Name of the Package/ Tender: ………………………………………
M/s. ……………… (here in after called Bidder) having Registered office at …………………… intend
to participate in above referred tender of GSECL.
The tender condition stipulates that the bidder shall submit supporting Documents
pertaining to Qualifying Requirement duly verified and certified by Third-Party Inspection
Agency (TPIA) or Statutory Auditor of their Company or Practicing CA/CA Firm as per the
list mentioned in the bidding documents.
In this regard, it is hereby confirmed that we have examined the following documents,
which are also attached with this letter. The same has been verified from the Original
Documents and / or Client for authenticity.
We hereby confirm that the following documents are found to be genuine and authentic.
1. Doc ref. no. ……….. Dated …….. (Name of Documents)
2. Doc ref. no. ……….. Dated …….. (Name of Documents)
All the aforesaid documents have been digitally signed by us as a certificate of authenticity.
We further confirm that we neither have any vested interest in aforesaid tender nor have
any conflict of interest in respect of above tender.
This certificate is issued at the request of M/s ………………. (Bidder) for the purpose of
participating in the subject tender/s
EW- 246 PUR-F-006 RFQ-73782
The rights and liabilities of the contractor shall not be assigned or transferred by them without the
consent in writing of the GSECL to any other person, firm or organization.
7. The successful Bidder, on receipt of letter of intent will submit within a week's time his planning /
programme of works, for scrutiny of the GSECL in a Bar Chart format, clearly indicating GSECL's inputs
also. Contractor will plan his works such that simultaneous work should progress in such a way that
entire job is completed in scheduled time limit on all the fronts released by GSECL.
8. The successful bidder will have to depute his authorized representative to attend progress review
meetings to be held at GSECL, Gandhinagar TPS without any extra cost.
9. The Contractor will be responsible for complying with all rules and regulations and labour laws
applicable to him and the GSECL will not be responsible for any lapses committed by them. If there is
any claim from any Government authority pertaining to the contract, the same amount will be
deducted from the Contractor's bill.
10. The time limit for completion of work is stipulated as in the tender will be adhered to.
11. The Contractor's rates should be firm and no variation clause is to be quoted by the Contractor
and GSECL will not accept the same, during contractual period including extended time limit if any.
12. BIDDER TO STUDY, ANALYSE & CONSIDER:
a) The information given in this specification is in good faith and meant to serve as a guide to
the Bidder. It is, therefore, imperative that Bidder shall obtain and examine for himself all the data,
information and particulars required for the satisfactory execution of the work under this tender. The
submission of a bid by Bidder implies that he has fully read the specifications, bid drawings, instruction
to the bidder along with Contract Document and Conditions of Contract, applicable labour laws, safety
norms etc., and has made himself aware of the scope and the specifications for the work to be
performed and local conditions and other features which have a bearing on the cost and execution of
the work. This specification is intended as a general description of quality envisaged for materials and
workmanship and of the finished work. It is not intended to cover minute details. The work shall be
executed in accordance with the best modern practice and to the complete satisfaction of the
Purchaser. Special techniques approved by the Purchaser shall be used if and where found necessary.
This specification shall have precedence if anything contrary to this is stated elsewhere in the contract
documents. The Purchaser‟s decision shall be final and binding on the contractor on any issue arising
out of such discrepancies.
b) Inspection of site by bidder:
Before submission of his bid, Bidder shall inspect the site, examine and obtain all information required
and satisfy himself regarding matters such as:
weather characteristics,
Location of site and access, right of way, means of communication & mode of Transport to site,
The type and number of equipment and facilities required
The quantity of various items of the work.
The availability and rates of material.
Labours condition.
Local working conditions, obstructions and hindrances that may arise etc.
Power house, which is under running conditions.
Required GSECL‟s security checks.
All materials brought to site only after making entries in security register at Control gate
c) These factors are likely to affect the satisfactory completion of work and or cost thereof. The
submission of a bid by the Bidder will be construed as evidence that such an examination was
made and any later claims/ disputes in regard to rates quoted shall not be entertained or
considered by the GSECL.
d) The site visit shall be done by the bidder on his own responsibility and all liabilities including
cash, arising out of the site visit shall be at the bidder‟s account.
e) Contractor‟s scope of work shall also include making all necessary arrangements for access to
work sites, stores and site offices etc. from the nearest approach road to facilitate transportation
of man power, machinery and equipment duly considering the existing site conditions. No extra
claims / costs will be entertained by GSECL.
f) The bidder shall carefully study the work to be carried out & consider all the factors & shall take
into account &consider all the factors such as lead, lift haulage of materials, sequence of
EW- 246 PUR-F-006 RFQ-73782
construction, etc. & shall allow for all such information / data in the rates quoted.
g) The GSECL will not pay any extra charges or rate for any reason in case the contractor claims,
after acceptance of contract to have misjudged the site condition. Ignorance of the intents and
contents of the specification document and site conditions shall not be accepted by the Owner as
basis for any claims for compensation.
h) BIDDER shall inspect the site, examine and obtain all information required and satisfy himself
regarding matters such as sub-surface conditions, water records, access to site, communication,
transport, right of way, the type and number of equipment and facilities required for the
satisfactory completion of work, the quantity of various items of the work, the availability and
rates of material, local working conditions, uncertainties of weather, obstructions and hindrances
that may arise etc. which may affect the work or cost thereof, before submission of his bid.
Ignorance of site conditions shall not be accepted by the ENGINEER IN CHARGE as basis for any
claim for compensation.
i) The rates quoted by BIDDER shall be based on his own knowledge and judgment of the
conditions and hazards involved and shall not be based on any representations of the Engineer in
Charge. No claim on this account shall be admitted by the GSECL.
j) The bidders shall submit on online in n-procure with their offer without any deviations in general
terms and conditions of the contract or in technical specifications.
k) Tenders received after the time and date specified in the tender notice will not be accepted.
Once the offer is submitted by bidder before due date of submission, the bidder shall not be
allowed to submit revised/ additional/ modified offer even before due date and time of
submission of tender. However, if the date of issue and/or submission of tender are extended by
the Corporation due to any reason, the bidder may submit if their wishes the
revised/additional/modified offer before extended due date and time of submission.
l) The Corporation reserves the right to accept any tender irrespective of whether it is lowest or not
or to reject all the tenders without assigning any reasons thereof. Tenders deferring from the
technical specifications or the method of bidding in a radical manner may also be rejected.
m) The bidder shall be presumed to have carefully examined the drawings, conditions &
specifications of work & to have fully acquainted themselves with all details of the site
conditions, locations, materials, geological & weather characteristics, labour conditions & in
general all the necessary information and data etc. pertaining to and need for the work.
n) This specification is intended as a general description of quality envisaged for materials and
workmanship and of the finished work. It is not intended to cover minute details. The work shall
be executed in accordance with the best modern practice and to the complete satisfaction of the
Purchaser. Special techniques approved by the Purchaser shall be used if and where found
necessary. This specification shall have precedence if anything contrary to this is stated
elsewhere in the contract documents. The Purchaser‟s decision shall be final and binding on the
contractor on any issue arising out of such discrepancies.
o) Each bidder shall also submit a 'Declaration' to the effect that the tenderer is an engineering
construction firm or an association of firm or firm which has successfully carried out large works
of this nature and has adequate organization and experienced personnel to handle this type and
magnitude of work. Information should also be given regarding the constitution of the firm; it‟s
authorized, subscribed & paid up capital, the date & place of registration, the place of business,
the names of the directors and other relevant information.
p) It is the intent of the ENGINEER IN CHARGE to incorporate these specification documents in the
final „Contract‟. BIDDERS are required to review these documents and clearly state in their
proposals their acceptance of the same.
q) Each page of the bid document including the bid drawings shall be signed, stamped and dated in
ink by the BIDDER as a token of having examined the same. Any correction in price and the
rates entered in the Schedule of Price shall also be signed and dated by the BIDDER in ink,
before submitting the bid. Non-compliance with this condition will make the bid liable for
r) All safety measures as required to be adopted as per the Statutory Regulations and the Safety
Rules of the Plant shall be strictly followed by the Contractor during the execution of the
Contract. The Contractor shall set up a suitable safety organization of his own in this regard.
s) In connection with the execution of the Contract, the Contractor shall comply with all applicable
statutory Rules & Regulations including employment of labours at site.
EW- 246 PUR-F-006 RFQ-73782
t) The Contractor shall carry out any and all such works, as may be required, for civil work to be
completed in all respect as per the Contract Specification.
u) If the GSECL Engineer-in-Charge is not satisfied with the progress of work at site, he shall direct
the Contractor to depute more numbers of supervisory personnel/workers to meet the
completion schedules as per the Contract. Upon receiving such direction, Contractor shall deploy
additional personnel within 7 days without any extra cost.
v) The GSECL may during the progress of work, order the removal of part or whole of the work
executed, found not in accordance with the specifications/ instructions. No extra claims shall be
entertained for re-executing or altering of such work.
13. SAFETY MEASURES:
The contractor shall ensure the safety of workers, material and structure including existing
structures during execution of the contract. Safety measures shall be followed during operations
of equipments/machinery being used. No separate payment shall be made for the safety
measures and the quoted rates shall include the cost for all safety measures.
14. COMPLETENESS:
Any technical services as set forth here in above and which might not have been specifically
mentioned in this Contract relating to the work or in the specifications and which are not
expressly excluded therefore but which are necessary for the performance in accordance with
the specifications as an integral part of the painting and misc. Civil works shall be rendered by
the Contractor without any extra cost.
15. TOTAL RESPONSIBILITY
The Contractor shall be solely responsible for the entire technical works / services irrespective of
works / services have been made /rendered by him.
16. PAYMENT TO THE LABOURES:
(a) Contractor has to pay the CPF as well as salary to his skilled/unskilled manpower by cheque A/c payee
only, as per minimum wages & prevailing applicable rules on or before 7th day of next month.
(b) Contractor has to produce challan of PF with list of employees.
(c) Contractor shall have to make payment to his labours in presence of Personal Officer (Estt.) GSECL,
Gandhinagar TPS.
17. CONTRACT AGGREMENT ON ACCEPTANCE:
The successful contractor will have to sign an agreement as per the Gujarat State Electricity
Corporation Ltd.'s rules on stamped paper and the necessary stamp duty charges shall be
borne by the contractor.
On acceptance of the tender the name (s) of the accredited representative (s) of the tenderer
who would be responsible for taking instructions from the Engineers of the GSECL shall be
communicated to Chief Engineer (Gen.) Gandhinagar Power Station, Gujarat State Electricity
Corporation Limited.
18. Unsatisfactory progress of the work:
If the work is found not progressing as per the requirement or found not satisfactory then
GSECL will take such action to get the work done through the other agency at agency‟s risk and
cost with 15% supervision charges and same will be recovered from agency.
19. The EMD will be returned promptly to the unsuccessful bidder except that of L1, L2 & L3 till
the successful contractor pays the Security Deposit as mentioned in tender document or after
the expiry of the validity of the offer, whichever is earlier.
The EMD will be returned to the successful tenderer after he furnishes the Security Deposit for
the tender work. If he fails to furnish the SD, his EMD shall be forfeited and the tenderer will
not be allowed to participate in the tenders invited by this office for a period of ONE Year in
respective Power Station.
The EMD in form of Bank Guarantee shall be valid for Ten Months from the date of
submission of the tender.
20. Effect and validity of Bid: The submission of bid with these documents and specification shall
constitute an agreement that bidder shall have no cause of action or claim against the GSECL for
rejection of his bid. The GSECL shall always be at liberty to reject or accept, split any bid or bids
at its sole discretion and any action will not be called into question and the bidder shall have no
claim in that regards against the GSECL.
21. Stop Deal / Banned for business dealing / Blacklisting :-
Has submitted fake, false or forged documents/certificates
Has revised/ withdrawn price bid after opening of Techno-commercial bid, until and unless it is
EW- 246 PUR-F-006 RFQ-73782
Has tempered with the stipulated tendering procedure.
Has refused to accept Letter of Acceptance / Purchase order / Work Order after the same is
issued by the company within the validity period and as per agreed terms and conditions,
Has committed breach of contract or has failed to perform a contract or has abandoned the
Has failed to provide suitable expertise for the work as per pre-scheduled program.
Has failed to submit all the necessary tests reports / documents within time scheduled / as per
company‟s time limit, as mentioned in the LOA, if the Letter of Acceptance (LOA) is placed
subject to submission of type reports / documents to the firm.
Has indulged in construction and erection of defective works.
Has supplied inferior quality / defective materials and refused to replace with stipulated time
frame, as specified by the company,
Has substituted materials in lieu of materials supplied by the company or has not returned or
has short returned or has unauthorisely disposed of materials / documents / drawings / tools
or plants or equipment supplied by the Company,
Has involved in malpractices such as bribery, corruption, fraud, canvassing and pilferage,
Has unauthorisely obtained official company information or copies of documents, in relation to
the Tender / Contract.
Has failed to follow the stipulated mode of communication, if specified by the tendering
authority / Purchaser.
Has parted with, leaked or provided confidential / proprietary information of the company
given to the firm only for its use (in discharge of its obligations against an order) to any third
party without prior consent of the Company,
Any other ground for which in the opinion of the Company makes it undesirable to deal with
In case the state Government directs the Company to place a firm in stop dealing / banned for
business dealing / blacklisting.
Chief Engineer (Gen)
Signature Of Contractor GSECL: GTPS
EW- 246 PUR-F-006 RFQ-73782
GENERAL CONDITIONS OF CONTRACT
EW- 246 PUR-F-006 RFQ-73782
GENERAL CONDITIONS OF CONTRACT
1. DEFINITIONS :
(a) The Contract means the documents forming the tender and acceptance thereof, together
with the documents referred to therein or individual work order in the case of term
contract, including these conditions, schedules and/or additional conditions attached to the
form of tender or individual works, order, rate schedule, the specifications and the
drawings and all these documents, as applicable, taken together shall be deemed to form
(b) The “Tender Document” means the form of tender, the applicable schedules and/or
additional conditions and the specifications and/or drawing as issued to the contractors for
the purpose of preparing tender.
(c) The expression “Works” or “Work” when used in the condition of contract shall, unless
there be something in the subject or context repugnant to such construction means, the
works or the work contracted to be executed under or in virtue of the contract whether
original or altered.
(d) The “Contractor” means the individual or firm or Corporation, whether incorporated or not,
undertaking the words and shall include his or its legal personal representatives, successors
and permitted assignees.
(e) “Corporation” means The Gujarat State Electricity Corporation Ltd. and the “Accepting
Officer” means the Officer who is authorized to sign and signs the contract on behalf of the
(f) The letter “EE” means Executive Engineer who in the case of measurement and lump sum
contract, direct the contract and the letters “SE” means Superintending Engineer and “GM”
means General Manager who administers and in the case of the term contracts, directs the
(g) The “Engineer-in-charge” means all officers of the Corporation appointed by the General
Manager to supervise the works or part of the works.
(h) “Approved” and “Directed” means the approval or direction of the Chief Engineer (Gen),
Gandhinagar TPS to Superintending Engineer or the person deputed by him for the
particular purpose.
(i) “BS.” means “British Standards” as issued by the British Standards Institution. “A.S.”
means the “American Standards” as issued by the American Standards Institution, and
“I.S.” means the “Indian Standards” as issued by the Indian Standards Institution.
Wherever the above-mentioned abbreviations are referred to, in the specifications and/or
work orders, they mean the addition with all amendments current at the date of issue of
tender document of work orders.
(j) In the case of measurement and terms of contract “Specifications” mean those contained in
Gujarat State Electricity Corporation Ltd. scheduled together with any amendments etc.
embodied in the tender documents. “Drawing” refers to those incorporating the tender
documents and/or any work orders referred therein.
(k) The “Contract Sum” means the sum accepted or the sum calculated in accordance with the
prices accepted in the tender and/or the contract rate as payable to the contractor for the
full and entire executing and completion of works.
(l) “The date for completion” is the date or dates of completion of the work or any part of the
works set out or ascertained in accordance with the individual work orders and the tender
documents or any subsequent agreed amendments thereto.
2. CONTRACTOR TO INFORM HIMSELF FULLY:
A. Notwithstanding anything contained to the contrary in the specifications or tenders in
subsequent exchange of correspondence, the conditions of contract shall be binding on the
Contractor and any change or variation expressed or implied, however made in the said
conditions, shall not be valid or operative unless expressly sanctioned by the Corporation.
The Contractor shall be deemed to have fully informed himself and to have special
knowledge of the provisions of the conditions of the Contract herein contained.
B. The contractor shall be deemed to have carefully examined the work and site conditions,
the general conditions, the special conditions, specifications, schedules and drawing and
EW- 246 PUR-F-006 RFQ-73782
shall be deemed to have visited the site of the works and to have fully informed
himself regarding the local conditions.
C. If there shall have any doubt as to the meaning of any portion of these general
conditions or special conditions of the scope of work of the specifications or any other
matter concerning the contract, he shall in good time before submitting his tender, send
for the particulars thereof and submit them to the Engineer-in-charge in writing in order
that such doubt may be removed.
3. CONTRACT DRAWING AND SPECIFICATIONS:
The contractor will be entitled to receive one set of agreement along with one certified copy
of accepted tender.
The drawings which form part of these specifications show the work to be done in as much
detail as is possible at the present stage. They will be supplemented by such additional
detailed drawings as may be necessary as the work progresses. The contractor shall
perform the work on these features and in accordance with these additional or revised
drawings as the case may be and at the applicable rates as per the contract.
The contractor shall check all drawings carefully and shall bring to the notice to the
Engineer-in-charge immediately of any errors or omissions discovered. The contractor shall
not take advantages of errors or omissions of any kind in the drawings supplied.
4. INPUTS BY GSECL:
The electric power supply and connection for construction / work purpose shall be given at
one mutually agreed point at work site free of cost by the GSECL. Further extension for
construction site as well as bore well site for using construction water will have to be
carried out by the contractor as per requirement at their cost. The necessary electric
charges will be paid by the contractor as per rates prevailing from time to time in the
respective DISCOM.
1. If there are any surplus quarters available after meeting the requirement of GSECL's staff,
then GSECL will consider allotment of quarters on rent as per GSECL's rule.
2. The contractor will have to make their own arrangement of water for construction
work as well as for their labourers at his own cost. If possible, water for construction
purpose only at one point as decided by EIC and recovery for water charges shall be
affected at the 2 % of the item of which water is used or by quantity measured by
meter reading of water meter installed by contractor, rate of water supply will be
charged at prevailing purchase rates of GSECL, for water supplied by GSECL is used
as certified by EIC. In case of agency is installing bore well and pumps at his cost,
after completion of work agency will hand over the bore well in good condition with
pumps to the GSECL.
5. DATA TO BE FURNISHED BY CONTRACTOR:
The contractor shall submit to the Executive Engineer for approval within one week of the
date of contract, a layout plan of construction plant and equipment for the execution
of work which the contractor proposes to adopt at site.
Prior to commencement of work, the contractor shall submit to the Executive Engineer for
approval, plans in triplicate showing the location of Major plant shop and storage
buildings, storage yards, offices, contractor's power house including its services and
housing facilities which he proposes to put up at site and also indicate the programme of
The successful bidder on receipt of letter of intent will submit within a week's time his
planning/programme of works for scrutiny of GSECL in a PERT/Bar chart format, clearly
indicating GSECL inputs also.
Contractor will plan his works such that on all the fronts released by GSECL, simultaneous
work should progress in such a way that entire job is completed in scheduled time limit.
No change in the approved layout shall be carried out without specific written approval of
the Executive Engineer.
6. ERRORS, OMISSIONS AND DISCREPANCIES:
In all cases of errors, omissions, doubts or discrepancies in the dimensions, or
discrepancies in the drawings and items of work in specification, reference shall be made
to the Executive Engineer whose elucidation and elaboration shall be considered as
EW- 246 PUR-F-006 RFQ-73782
authoritative. The contractor shall be held responsible for any error that may occur in the
work thorough lack of such reference and precautions.
7. SECURITY DEPOSIT:
SECURITY DEPOSIT: In tender process for L1 bidder (lowest bidder) security
deposit will be charged as per table below:
Category of the Unit Security Deposit
Works up to Rs. 5 Works More than Rs.
Enterprise or Organization Exempted 3% of Order End Cost
which are exempted from
paying Tender Fee & EMD
For all other Enterprises 5% of Order End Cost 5% of Order End Cost
ELIGIBILITY FOR EXEMPTION:
1. Micro & small-scale enterprises which participate directly in tendering process for the
product which they are manufacturing / service which they are providing and have
Udyam registration for items / service under procurement.
2. Start-ups which participate directly in tendering process for the product which they are
manufacturing/service which they are providing and re-cognized by DPIIT under the
Start-up India Program and has obtained Udyam registration.
3. Organization which has registration certificate for the manufacturing product of the
tender, from Gujarat Khadi Gramodyog Board or Khadi and Village Industries
Commission(K.V.I.C)or Commissioner of Cottage Industries.
4. Board/Corporations/PSUs of the Central/State Government for their own
manufactured items.
5. State Government recognized organizations like(i) organizations for blinds, dumb and
deaf, disabled, mentally disabled persons;(ii)women's self-help group recognized by
Gujarat Livelihood Promotion Company; which participate directly in tendering process
for the product which they are manufacturing / service which /they are providing
Note: Security Deposit will be collected from the successful tenderer at the rates mentioned above.
This may be recovered by deduction through running bills of the contractors and / or by treating the
Earnest Money Deposit (Bid Security) paid at the time of submission of the tender.
After issue of Work order and Date of commencement, if successful bidder failed to start the
work then, RPAD notice will be issued to the successful bidder mentioning that on failing to start
the work within next 07 days from the date of issue of RPAD Notice the EMD will be forfeited and
he will not be allowed to participate in the tenders invited from Gandhinagar TPS office for the
period of One year.
The security deposit of the contract value shall be released on finalization of final bill / successful
completion of the work/ completion of maintenance period.
All damages, costs, charges, expenses and other sums which may be or may become due or
payable by the contractor to the Corporation under the terms of the contract, may be deducted
from the cash in the proceeds of sale of the securities/bank guarantee so deposited (which the
officer or person to whom the same may be endorsed as aforesaid is hereby authorized to sell/to
encase for that purpose) or from the interest of any such securities or from any sums due or
which may become due to the contractor by the Corporation or from the whole or the balance
unpaid as aforesaid of the encase securities so deposited being repaid or transferred and
returned as the case may be, to the contractor on finalization of final bill OR after 06 (six)
months of successful completion of the work, whichever later OR on furnishing of the
Performance Bond amounting to 5% of contract value against the defect liability period as
mentioned in this document elsewhere.
If entire security deposit is paid in approved form of Bank Guarantee should be remain valid
during the contractual period and such bank Guarantee should not be reduced on the basis of
the work actually done.
8. USE OF LAND:
EW- 246 PUR-F-006 RFQ-73782
The land required for office, godowns and for labour camp if not available with GSECL,
then the contractor has to arrange the same at his cost. GSECL will give the land only if
the spare land is available with the following conditions.
The contractor shall be permitted to use for the bonafide purpose of execution of this
contract free of cost. The contractor shall be permitted to use for the bonafide purpose of
execution of this contract free of cost.
1. Site required for the construction of the work.
2. Required approach road. The contractor shall make their own arrangements for the
necessary approach, road, for transport of their materials and be responsible for the
compensation on account of damage to crop etc. and shall till completion of work.
3. He will be charged the rent at the annual rate of rupees one hundred per every acre
or part thereof, for the construction of temporary hutments and his store yard.
However area required for such purpose may be clearly indicated in this offer.
All areas of operation, including those for his staff and labour colonies handed over to
the contractor shall be cleared and handed over back in good condition to the Engineer
except areas under works as per this contract or those for which specific approval has
been obtained from the Engineer. The contractor shall make good to the satisfaction of
the Engineer any damage or alternation made to areas which he has to hand over
back or to other property land handed over to him for purpose of this work.
Temporary structures may be erected by the contractor for storage sheds, offices,
residence etc. for noncommercial use on the land, handed over to him at his own
expense and with the permission of the Engineer. These structures shall comply with
the regulation that may be in force and/or specified by the Engineer with regard,
thereto. In any circumstances for constructing temporary structures for contractor's
use, GSECL's free supply materials shall not be used. If it is found that GSECL's free
supply materials are used for other than approved project drawings work, same will be
recovered at penalized rate.
The contractor shall preserve all existing vegetation such as trees on or adjacent to the
sites which do not interfere with the construction as determined by the Engineer.
The contractors shall take all possible precautions in felling trees authorized for
removal to avoid any unnecessary damage to vegetation and trees not to be felled and
to structures under construction, or to workmen, and shall be responsible for any
damage if it occurs in such operations
All produce from cutting of trees; grass etc. shall be the property of GSECL and shall
be stocked at the place specified by the Engineer. No claim shall be made for such
cutting and stacking of trees or grass etc. by the contractor
The contractors shall not unnecessarily or for use as fuel, cut any trees brush wood,
grass or other vegetation nor shall set fire there to without the written permission of
the Engineer. When such permission is given, the contractor shall take necessary
measures to prevent damage or to prevent fire spreading to surrounding property, and
shall be responsible for any such damage, if cause.
The land shall as herein before mentioned be handed back to Engineer in Charge
immediately after the completion of the work under this contract. Also no land shall be
held by the contractor longer than the Engineer shall deem necessary and the
contractor shall, on due notice by the Engineer, vacate and return the land which the
Engineer may certify as no longer required by the contractor for purpose of the work.
9. START OF WORK:
The contractor shall not enter upon or commence any portion of work except with the
written authority or instructions of the Executive Engineer or his subordinate in charge of
the work, failing such the contractor shall have no claim to ask for measurement or
payment for work and shall be responsible for any claims or damages that may arise due
to such unauthorized commencement or entry.
10. COMPENSATION FOR THE DELAY:
The time allowed for carrying out the work as entered in the tender shall be strictly
observed by the contractor and shall be reckoned from the date on which the order to
commence work is given to the contractor. The work shall throughout the stipulated
period of contract be proceeded with all due diligence (time being deemed to be the
essence of contract) and for delay, the contractor shall pay compensation, an amount
equal to ½ (half) percent per one week for the contract amount or part thereof, including
taxes & duties ( i.e. End cost of contract amount including taxes & duties) and maximum
EW- 246 PUR-F-006 RFQ-73782
up to 10 % of the order value, including taxes & duties ( i.e. End cost of contract amount
including taxes & duties) or such smaller amount as per the decision of the Competent
Authority of the GSECL The penalty will be invariably deducted from the bills of the
contractor and no refund will be given unless the competent authority approves the
reduction. The reasons for delay, attributable to GSECL as well as to party will be brought
out clearly while putting the proposal for waiver/reduction in penalty.
11. ACTION WHEN WHOLE OF SECURITY DEPOSIT IS FORFEITED:
In any case in which under any clause or clauses of this contract the contractor shall have
tendered himself to pay compensation amounting to the whole of his security deposit
(whether paid one sum) or in the case of abandonment for the work owing to serious
illness or death of the contractor or any other cause, the Executive Engineer on behalf of
the Corporation, shall have powers to adopt (a) below and any of the following courses
under (b) and (c) as he may deem best suited to the interest of the Corporation.
(a) To rescind the contract (for which rescission notice of 10 days) in writing to the contractor
under the hand of the Executive Engineer shall be conclusive evidence and in that case the
security deposit of the contractor shall stand forfeited and absolutely at the disposal of the
Corporation. To employ labour paid by the Corporation, to supply materials, to carry out
the works or any part of the work debiting the contractor with the cost of the labour and
the price of the materials (as to the correctness of which cost and price, the certificate of
the Executive Engineer shall be final and conclusive against the contractor) and crediting
him with value of the work done in all respects in the same manner and at the same rates
as if it had been carried out by the Contractor under the terms of this contract and in that
case the certificate of the Executive Engineer as to the value of the work shall be final and
conclusive against the contractor.
(b) To order that the work of the contractor be measured up and to take such part thereof, as
shall be unexecuted, out of his hands and to give it to another contractor to complete, in
which case, any expenses, which may be incurred in excess of the sum, which would have
been paid to the original contractor, if the whole work would have been executed by him
(as to the amount of which excess expenses, the certificate in writing of the Engineer-in-
charge shall be final, conclusive and shall be borne and shall be paid by the original
contractors and shall be deducted from any money due to him by the Corporation under
the contract or otherwise from his security deposit of his proceeds sale thereof or a
sufficient part thereof.
(c) In the event of the above courses being adopted by the Executive Engineer, the contractor
shall have no claim to compensation for any loss sustained by him by reason of his having
purchased or procured any materials or entered into any engagements or made any
advances on account of or with a view to the execution of the work or the performance of
the contract. And in case the contract shall be rescinded under the provision aforesaid, the
contractor shall not be entitled to recovery or be paid any sum for any works thereof
actually performed by him under this contract unless and until the Executive Engineer shall
have certified in writing the performance of such work and the amount payable to him in
respect thereof and he only be entitled to be paid the amount so certified.
12. NOTICE UNDER UNSATISFACTORY PROGRESS:
If the progress of a particular portion of the work is unsatisfactory, and also if as per the
opinion/observation of the Executive Engineer (whose decision shall be final) in charge
that the general progress of work is not satisfactory, then Executive Engineer in charge
shall be entitled to take action under clause 11 (c) after giving the contractor ten days‟
notice in writing and the contractor will have no claim for compensation for any loss
sustained by him owing to such action.
13. ACTION IN THE CASE OF DEFAULT BY THE CONTRACTOR :
In any case in which any of the powers conferred upon the Executive Engineer by Clauses 11 and
12 hereof shall have exercisable and the same shall not have been exercised, the non-exercised
thereof shall not constitute a waiver of any of the conditions hereof and such powers shall not
withstanding be exercisable in any further case of default by the contractor of which, by any
clauses hereof, he is declared liable to pay compensation amounting to the whole of his security
deposit and liability of the contractor for past and future compensation shall remain unaffected in
the event of the Executive Engineer taking action under sub-clause (a) or (c) of Clause 11, he
EW- 246 PUR-F-006 RFQ-73782
may if he so desires, take possession of all or any tools, plants, materials, and stores in so upon
the work or the site thereof belonging to the contractor, or procured by him and intended to be
used for the execution of the work of any part thereof paying for allowing for the same in
account at the contract rates, or in the case of a contract rates not being applicable of current
market rates to be certified by the Executive Engineer whose certificate thereof shall be final. In
the alternative, the Executive Engineer may by notice in writing to contractor or his clerk of
works, foreman or other authorized agent, require him to remove such tools, plant, materials or
stores from the premises within a time to be specified in such requisition, the decision to the
contractor failing to comply with any such requisition, the decision of the Executive Engineer as
to the expense of any such removal and the amount of the proceed and expense of any such
sale, be final and conclusive against the contractor.
14. EXTENSION OF TIME LIMIT
If the contractor shall desire an extension of the time limit for completion of the work on the
ground of his having been unavoidably hindered in its execution or on any other ground, he shall
apply in writing to the Executive Engineer and the Executive Engineer may, if in his opinion there
are reasonable grounds for granting extension, recommend such extension as he may think
necessary or proper. The decision of the competent authority in this regard shall be final, and
binding to the contractor. Any delay attributed to Corporation, shall be thus compensated only by
way of extending the limit.
15. COMPLETION CERTIFICATE
On completion of the work, the Contractor shall be furnished with Completion Certificate by the
Executive Engineer. No such certificate shall be given nor shall be the work considered to be
completed until works are taken over and/or duly tested and put to operation as the case may
be, nor until the work shall have been measured by the Engineer-in-Charge or where the
measurement have been taken by his subordinates until they have received the approval of the
Executive Engineer the said measurement being binding and conclusive against the contractor.
16. EFFECT OF THE CERTIFICATE :
No payment shall be made for any work estimated to cost less than Rs.1,000 till after the whole
of said work shall have been completed and a certificate of completion given. But in the case of
works estimated to cost more than Rs.1,000, contractor shall on submitting a monthly bill
thereof, be entitled to receive payments. Proportionate to the part of the work then approved
and passed by the Engineer-in-Charge, whose certificate of such approval and a passing of the
sum so payable shall be final and conclusive against the contract. All such intermediate payment
shall be regarded as payment by way of advance against the final payment only and not as
payments for work actually done or completed and shall not preclude the Engineer-in-charge
from requiring bad, unsound, imperfect or unskillful work to be removed and taken away and
reconstructed or re-erected nor shall any such payment be considered as admission of the due
performance of the contract or any part thereof in any respect of the occurring of the claim nor
shall conclude, determine or effect in any way the powers of the Engineer-in-Charge as to the
final settlement and adjustment of the accounts otherwise or in any other way, vary or affect the
contract. The final bill shall be submitted by the contractor within one month of the date fixed for
completion of work; otherwise the certificate of the Engineer-in-charge of the measurement and
of total amount payable for the work shall be final and binding on all parties.
of total amount payable for the work shall be final and binding on all parties.
17. PAYMENT TO CONTRACTORS :
The rates for several items of works estimated to cost more than Rs.1,000 agreed to within shall
be valid only when the item concerned is accepted, having been completed full, in accordance
with the sanctioned specification. In case, where the items of the work, are not accepted, as so
completed, the Engineer-in-charge, may make payment on account of such items at such
reduced rates, as he may consider reasonable in the preparation of final or running accounts bills
and it will be binding to the contractor.
The Bill Shall be submitted by the contactor each month on or before the date fixed by the
Engineer-in-charge, for all works, executed in the previous month and the Engineer-in-charge
shall take or cause to be taken the requisite measurement for the purpose or having the same
verified and the claim so far as it is admissible, shall be adjusted, if possible, within Fifteen days
from the presentation of the bills. If the contractor does not submit the bill, within the time fixed,
as aforesaid, the Engineer-in-charge may depute a subordinate to measure up the said work in
EW- 246 PUR-F-006 RFQ-73782
the presence of the contractor or his duly authorized agent, whose counter signature in the
measurement shall be sufficient warrant and the Engineer-in-charge may prepare a bill from such
list which shall be binding on the contractor in all respects. In case if contractor/ representative
does not remain present on specified date for taking measurement than EIC may take the
measurement one sided and the same shall be binding to the contractor irrespective whether he
has signed or not.
19. SUPPLY OF MATERIALS TO CONTRACTOR [APPLICABLE ONLY WHERE MATERIAL IS
TO BE SUPPLIED BY CORPORATION AS MENTIONED IN SCHEDULE A ]
If the specification of the estimated work provides for use of any special description of material
to be supplied from the Corporation‟s stores or if it is required that the contractor shall use
certain stores to be provided by the Engineer-in-charge, (such material and stores and the prices
to be charged thereof as hereinafter mentioned being so far as practicable for the convenience of
contractor but not so as in any way to control, the meaning or effect of this contract specified in
the schedule or memorandum hereto annexed). The contractors shall be supplied with such
materials and stores as may be required from time to time be used by him for the purpose of the
contract only and the value of the full quantity of materials and stores so supplied shall be set off
or deducted from any sum due or thereafter to become due to the contractor, under the contract
or otherwise or from the security deposit or the proceeds of sale thereof if the deposit is held in
government securities the same or a sufficient portion thereof, shall be sold for the purpose. All
materials supplied to the contractor shall remain the absolute property of the Corporation and
shall on account be removed from the site of work and shall at all times be open to inspection by
the Engineer-in-charge. Any such materials unused and in perfectly good condition at time of
completion or determination of the contract shall be returned to the Corporation‟s store if the
Engineer-in-charge so requires by notice in writing given under his hand but the contractor shall
not be entitled to return any such materials except with such consent and he shall have no claim
for compensation on account of any such materials supplied to him as aforesaid but remaining
unused by him or for any wastage in or damaged thereto. The contractor shall be responsible for
the loss, destruction or deterioration of the materials, stores or articles supplied to him by the
Corporation even if such loss, destruction or deterioration has occurred under any circumstances
whatsoever beyond his control as if the materials, stores or articles so supplied were his
20. WORKS TO BE EXECUTED IN ACCORDANCE WITH SPECIFICATIONS, DRAWING,
The contractor shall execute the whole and every part of work in the most substantial and
workman like manner and both as regarding materials and in every other respect in strict
accordance with the specification. The contractor shall also confirm exactly, fully and faithfully to
the designs, drawings and instructions in writing relating to the work signed by the Engineer-in-
charge and lodged in his office and to which the contractor shall be entitled to have access for
the purpose of inspection at such office, or on the site of the work during office hours and the
contractor shall, if he so requires, be entitled at his own expense to make or cause to be made
copies of the specification and of all such designs, drawings and instructions as aforesaid.
21. ALTERATIONS IN SPECIFICATIONS AND DESIGNS NOT TO INVALIDATE CONTRACTS
The Executive Engineer shall have powers to make any alterations, or additions to the original
specification, designs and instructions that may appear to him to be necessary or advisable
during the progress of the work and the contractor shall be bound to carry out the work in
accordance with any instruction in this connection which may be given to him in writing, signed
by the Engineer-in-charge and such alterations shall not invalidate the contract. Any additional
work which the contractor may be directed to do in the manner above specified as part of the
work shall be carried out by the contractor on same conditions in all respect on which he agreed
to do the main works and at the same rates as are specified in the tender for the main work.
Where, however, the work is to be executed according to the designs, drawings and the
specifications recommended by the contractor and accepted by the competent authority, the
alteration above referred to shall be within the scope of such designs, drawings and
specifications appended to the tender.
22. RATES FOR WORKS NOT ENTERED IN ESTIMATE OR SCHEDULE OF RATE OF THE
EW- 246 PUR-F-006 RFQ-73782
If the additional and altered work includes any class of work for which no rate is specified in this
contract, then such class of work shall be carried out at the rates entered in the Schedule of
Rates of the Corporation or at the rate mutually agreed upon between the Executive Engineer
and the Contractor, whichever are lower. If the additional or altered work for which no rate is
entered in the Schedule of Rates of the Division is ordered to be carried out before the rates
agreed upon then the contractor within seven days of date of receipt by him of the order to carry
out the work should inform the Executive Engineer for the rate which it is his intention to charge
for such class of work and if the Executive Engineer does not agree to this rate, he shall be
noticed in writing, be at liberty to cancel his order to carry out such class of work and arrange to
carry it out in such manner as he may consider advisable provided always that if the rates shall
have been determined as lastly herein before mentioned then in such case he shall only be
entitled to be paid in respect of the work carried out or expenditure incurred by him prior to the
date of the determination of the rate as aforesaid according to such rate or rates as shall be fixed
by the Executive Engineer in the event of disputes, the decision of the General Manager of the
Corporation will be final.
23. EXTENSION OF TIME LIMIT IN CONSEQUENCE OF ADDITION OR ALTERATION
The time limit for the work shall be extended in the proportion that the increase in its cost
occasioned by alterations or additions bears to the cost of the original contract work and the
certificate of the Engineer-in-charge as to such proportions shall be conclusive.
24. NO COMPENSATION FOR ALTERATION IN OR RESTRICTION OF WORK TO BE
If at any time, after the execution of the contract documents, the Engineer-in-charge shall, for
any reason whatsoever, requires the whole or any part of the work, as specified in the tender, to
be stopped for any period or shall not require the whole or part of the work to be carried out at
all or to be carried out by the contractor, he shall give notice in writing of the fact to the
contractor who shall thereupon suspend or stop the work totally or partially as the case may be
in any such case, except as provided here under. The contractor shall have no claim to any
payment or compensation whatsoever on account of any loss in profit or advantage which he
might have derived from the execution, of the work in full but which he did not so derive in
consequence of the full amount of work not having been carried out or on account of any loss
that he may be put to on account of materials purchased or agree to be purchased or for
unemployment of labour recruited by him. He shall not also have any claim for compensation by
reason of any alterations having been made in the original specification, drawings, designs and
instructions which may involve any curtailment of the work as originally contemplated. Where,
however, materials have already been purchased or agreed to be purchased by the contractor
before receipt by him of said notice, the Executive Engineer provided they are not in excess or
requirement and are of approved quality and/or shall be compensated for the loss, if any, that he
may put to in respect of materials agreed to be purchased by him. The amount of such
compensation to be determined by the Executive Engineer, whose decision shall be final. If the
contractor suffers any loss on account of his having to pay, his labour charges during the period,
during which the stoppage of work has been ordered under this clause the contractor shall on
application be entitled to such compensation on account of labour charges as the Executive
Engineer whose decision shall be final, may consider reasonable provided that the contractor
shall not be entitled to any compensation on account of labour charges if, in the opinion of the
Executive Engineer, the labour could have been employed by the contractor elsewhere for the
whole or part of the period during which the stoppage of the work has been ordered as
25. NO CLAIM FOR COMPENSATION ON ACCOUNT OF LOSS DUE TO DELAY IN SUPPLY OF
MATERIALS BY CORPORATION
The contractor shall not be entitled to claim any compensation from Corporation for the loss
suffered by him on account of delay by Corporation in the supply of materials entered in
Schedule A where such delay is caused by:
Difficulties relating to supply of railway wagons.
Force Majeure
EW- 246 PUR-F-006 RFQ-73782
Any other reasonable cause beyond the control of Corporation, including shortage of materials to
be supplied by the Corporation and difficulties in time by reaching at the site of any materials
In the case of such delay in the supply of materials, Corporation shall grant such extension of
time for the completion of the works as shall appear to the Executive Engineer to be reasonable
in accordance with the circumstances of the case. The decision of the Executive Engineer as to
the extension of time shall be accepted as final by the contractor.
26. TIME LIMIT FOR COMPENSATION CLAIMS
Under no circumstances, whatsoever, shall the contractor be entitled to any compensation from
Corporation on any account unless the contractor has claimed in writing to the Executive
Engineer within one month of the cause thereof.
27. ACTION AND COMPENSATION PAYABLE IN CASE OF BAD WORK
If at any time, before the security deposit is refunded to the contractor, it shall appear to the
Executive Engineer or his subordinate in charge of the work that any work has been executed
with unsound, imperfect or unskillful workmanship or with materials of inferior quality or that any
materials or articles provided by him for the execution of the work are unsound or of inferior
quality to that contract for or are otherwise not in accordance with the contract, it shall be lawful
for Engineer-in-charge to intimate this fact in writing to the contractor and then notwithstanding
the fact that the work, materials, or articles complained of, may have been inadvertently passed,
certified and paid for, the contractor shall be bound forthwith to rectify or remove and
reconstruct the work so specified in whole or any part, as the case may require or if so required
shall remove the materials or articles so specified and provided other suitable materials or articles
at his own charge and cost, and in the event of his failing to do so within a period to be specified
by the Engineer-in-charge in the written intimation aforesaid the contractor shall be liable to pay
compensation at the rate of one percent on the amount of the estimate for every day not
exceeding ten days during which the failure so continues and in the event of any such failure as
aforesaid, the Engineer-in-charge may rectify or remove or re-execute the work or remove and
replace the materials or articles complained of, as the case may be, at the risk and expense in all
respects of contractor should the Engineer-in-charge consider that any such inferior work or
materials as described above may be accepted, or made use of, it shall be within his discretion to
accept the same as such reduced rates as he may fix thereof.
Provided that in the case of any work of which visible check is not possible if the Engineer-in-
charge or his subordinate in charge of the work feels that such work has been executed with
unsound, imperfect or unskillful workmanship or with materials of inferior quality, he shall take
sample tests at random, cost of which shall have to be borne by the contractor and if after taking
such test part of such work is found to be defective in any respect or to have been executed with
materials of inferior quality then the contractor shall pay for the whole work such amount as may
be fixed by the office of the Engineer-in-charge on the basis of the lowest quality of work found
by him in such sample tests.
28. WORK TO BE OPENED TO INSPECTION, CONTRACTOR OR RESPONSIBLE AGENT TO
All works under execution or in pursuance of the contract shall at all times be open to the
inspection and supervision of the Executive Engineer and his subordinate and contractor shall at
all times, during the usual working hours and at all other times at which reasonable notice of the
intention of the Executive Engineer or his subordinate to visit the works shall have been given to
the contractor, during which period either he should be present to receive order and instruction,
or have a responsible agent duly authorized agent shall be considered to have the same force
and effect as if they had been given to the contractor himself.
29. NOTICE TO BE GIVEN BEFORE WORK IS COVERED UP
The contractor shall give not less than five days‟ notice in writing to the Executive Engineer or his
subordinate in charge of the work, before covering up or otherwise placing beyond the reach of
measurement of any work, in order that the same may be measured and correct dimensions
thereof, taken before the same is so covered up or placed beyond the reach of measurement and
shall not be covered up or placed beyond the reach of measurement and work without the
consent in writing of Executive Engineer or his Subordinate in charge of work. If any work shall
be covered up or placed beyond the reach without such notice having been given or consent
EW- 246 PUR-F-006 RFQ-73782
obtained, the same shall be uncovered at the contractor‟s expense and in default thereof no
payment or allowance shall be made for such work or for the materials with which the same was
30. CONTRACTOR’S LIABILITIES
The contractor shall supply, at his own cost, all materials (except such special materials, if any as
may be supplied from the Corporation stored in accordance with the contract). Plant, tools,
appliances, implements, ladders, cordage, tackle, scaffolding and any temporary works which
may be required for the proper execution of the work, in the original, altered or substituted form
and whether included in the specification and other document forming part of the contract or
referred to in these conditions or not and which may be necessary for the purpose of satisfying
and complying with the requirements of the Engineer-in-charge as to any matter on which under
these conditions, he is entitled to be satisfied or which he is entitled to require together with
carriage thereof to and from the work. The contractor shall also supply without any charge the
requisite number of persons of setting out works and counting, weighting and assisting in the
measurement of examination at the time and from time to time of the work or materials, failing
this the same may be provided by the Engineer-in-charge at the expenses of the contractor and
the expenses may be deducted from any money due to the contractor under the contract or from
his security deposit or the proceeds of sale thereof or of a sufficient portion thereof, the
contractor shall provide all necessary fencing and light required to protect the public from
accident and shall also be bound to bear expenses of defense of every suit, action or other legal
proceedings of law that may be brought by any person for injury sustained. Owing to neglecting
of the above precautions and to pay any damage and cost which may be awarded in such suit,
action or proceedings to any such person or which may with the consent of the contractor be
paid in comprising any claim by any such person.
31. CONTRACTOR LIABLE FOR ALL DAMAGE
Compensation for all damage done intentionally or unintentionally by contractor‟s laborer,
whether in or beyond the limit of Corporation‟s property, shall be estimated by the Executive
Engineer or such other office as he may appoint and the estimates of the Executive Engineer,
subject to the decision of the Superintending Engineer, on appeal, shall be final and the
contractor shall be bound to pay the amount of the assessed compensation demand, failing
which, the same will be recovered from the contractor as damages or deducted by the Engineer-
in-charge from any sums that may be due to or become due from Corporation to the contractor
under this contract or otherwise.
The contactor shall bear the expenses of defending any action or other legal proceeding that may
be brought by any person for injury sustained by him owing to negligence of precautions for
prevent the spread of fire and he shall also pay any damage and cost that may be awarded by
the court, if in consequence.
32. RESCISSION OF CONTRACT AND FORFEITURE OF DEPOSIT
The contractor shall not assign or sublet, without the written approval of the Engineer-in-charge
and if the contractor assign, or sublet his contract, or attempt to do so or become insolvent or
commence any proceedings to be adjudicated as insolvent or make any composition with
creditors, attempt to do so, the Engineer-in-charge may, by notice in writing rescind the contract.
Also, if any bribe, gratuity, gift, loan, perquisite, reward or advantage pecuniary or otherwise
shall either directly or indirectly be given, promised or offered by the contractor or any of his
servants, or agents, or any person to the employee of the Corporation in any way relating to his
office or indirectly interested in the contract, the Executive Engineer may, by ten days‟ notice in
writing, rescind the contract. In the event of a contract being rescinded the security deposit of
the contractor shall there upon stand forfeited and be absolutely at the disposal of the
Corporation and the same consequences shall ensure as if the contract has been rescinded under
Clause 11 thereof and in addition the contractor shall not be entitled to recover or be paid for
any work thereof actually performed under the contract.
33. COMPENSATION
All sums payable by a contractor by way of compensation under any of these conditions shall be
considered as a reasonable compensation to be applied to the use of Corporation without
reference to the actual loss or damage sustained and whether any damage has not been
EW- 246 PUR-F-006 RFQ-73782
34. CHANGE IN THE CONSTITUTION OF FIRM TO BE NOTIFIED
In case of tender by partners of a Firm, any change in constitution of firm shall be forthwith
notified by the contractor to the Executive Engineer for his information.
35. WORKS UNDER DIRECTION OF SUPERINTENDING ENGINEER
All works to be executed under the contract shall be executed under the direction and subject to
the approval of Superintending Engineer /Engineer-in-charge for the time being who shall be
entitled to direct at what point or points and in what manner they are to be commenced and
from time to time to be carried on.
36. DECISION OF SUPERINTENDING ENGINEER TO BE FINAL
Except where otherwise specified in contract and subject to the power delegated to him by
Corporation under the Corporation‟s rules, then in force, the decision of the Superintending
Engineer/EIC for the time being shall be final, conclusive and binding on all the specifications,
designs, drawings and instructions herein before mentioned and as to the quality of workmanship
or material used on or as to any other question, claim, right matter or thing whatsoever in any
way arising out of or relating to the contract, designs, drawings, specifications, estimates,
instructions, orders or these conditions or otherwise concerning, the works or the execution or
failure to execute the same, whether arising during the progress of the work or after the
completion or abandonment thereof.
37. ARBITRATION
Dispute Resolution Mechanism: For works contracts and composite Contracts, the arbitration
mechanism shall be governed by the Gujarat Public Works Contracts Disputes Arbitration Tribunal
Act, 1992 as per below details.
sub clause 37(1) Amicable Settlement : Any dispute, difference, controversy or claim
between the Parties arising out of or relating to this contract with reference to the construction,
interpretation, breach, termination or validity thereof (hereinafter referred as "the Dispute") shall,
upon the written request of either Party be referred to the authorized representatives of the
Disputing Parties for resolution. The authorized representatives shall promptly meet and attempt
to negotiate in good faith a resolution of the Dispute within thirty days of the service of the
sub clause 37(2) Arbitration: If the Parties fail to amicably resolve the disputes or differences
or contrary claims as indicated herewith in sub clause (1) of Clause 37 arising under or in
connection with the present works contracts, whether pertaining to works contracts alone or
works and procurement both, the same shall be referred to arbitration under the Gujarat Public
Works Contracts Disputes Arbitration Tribunal Act, 1992."
38. STORES TO BE OBTAINED FROM CORPORATION [APPLICABLE ONLY WHERE
MATERIAL IS TO BE SUPPLIED BY CORPORATION AS MENTIONED IN SCHEDULE A]
The contractor shall obtain from the Corporation stores, such articles as are mentioned in
schedule “A” which may be required for the work or any part of the work or in making up any
articles required therefore or in connection therewith, unless he has obtained permission in
writing from the Executive Engineer or obtained such stores and articles from elsewhere. The
value of such stores and articles as may be supplied to the contractor by the Engineer-in-charge
will be debited to the contractor in his account at the rate shown in the schedule “A” attached to
the contract and if they are not entered in said Schedule, they shall be debited to him at cost
price which for the purpose of this contract shall include cost of carriage and all other expenses
whatsoever which may have to be incurred in obtaining delivery of the same at the stores
aforesaid and further overhead charges 15%.
The Contractor shall be responsible for the loss, destruction or deterioration of the materials,
stores or articles supplied to him by the Corporation, even if such loss, destruction or
deterioration has occurred under any circumstances whatsoever beyond his control as if the
materials, stores or articles so supplied were his property. The contractor shall be responsible for
returning the residual materials after completion of the contract and it fails to return, the balance
materials supplied to him by the Corporation, the cost of the residual materials will be recovered
from the contractor at the market rate or stock issue rate whichever be higher at the time of
materials account plus 15%.
39. LUMP SUMS IN ESTIMATE
When the estimate on which tender is made, includes lump sums in respect of parts of the works
the contractor shall be entitled to payment in respect of the items of works involved or the part
EW- 246 PUR-F-006 RFQ-73782
of the work in question at the same rates as are payable under this contract or such items or if
the part of work in question is not in the opinion of the Engineer-in-charge capable of
measurement the Engineer-in-charge may at his discretion pay the lump sum amount entered in
the estimate and the certificate in writing of the Engineer shall be final and conclusive against the
contractor with regard to any sum or sums payable to him under the provision of this clause.
40. LUMP SUM TENDERS
Whenever lump sum tenders have been invited for buildings or other structures of the same
type, design, the contractor shall submit his bill stated in Clause No. 18 and the Engineer-in-
charge not below the rank of work, Executive Engineer shall certify by general measurement or
by other method considered suitable to him, the value of work done and the contractor shall be
paid monthly a sum equal to 90% of the total value the work so certified, since the last payment,
after deducting a part or whole of the secured advance if not already paid for the materials
utilized on the works. An additional secured advance for any fresh materials utilized on the
works. An additional secured advance for any fresh materials brought on site will also be paid if
certified by the officer not below the rank of Executive Engineer. After the work is completed
final bill would be paid on the certification of officer not below the rank of Executive Engineer,
that the work, is done according to drawing and specifications attached to the tender. If any
additions and alterations have been carried out, detailed measurement in respect thereof shall be
recorded and extra payment or deductions are regulated as per item rates quoted by the
contractor while submitting the tender and if there are any items in the additions and alterations
for which the contractor has not quoted a rate, the payment shall be as per Clause 39 above.
41. ACTION WHERE NO SPECIFICATION
In the case of any class of work for which there is no such specification as is mentioned, such
work shall be carried out in accordance with the PWD and in the event of there being no PWD
specification, the work shall be carried out in all respects in accordance with the instructions and
requirements of the Engineer-in-charge of the Corporation etc.
42. NO CLAIM FOR VARIATION IN QUANTITIES OR WORK
Quantities shown in the tender are approximate and no claim shall be entertained for quantities of
work actually executed, being either more or less up to any extent than those entered in the
tender or less than those entered in the tender or estimate.
43. NO CLAIM FOR COMPENSATION FOR DELAY IN STARTING WORK
No compensation shall be allowed for any delay caused into starting of work on account of
acquisition of land and in the case of clearance for works or any delay in according sanction to
44. NO CLAIM FOR COMPENSATION FOR DELAY IN EXECUTION OF WORK
No compensation shall be allowed for any delays in execution of the work on account of water
standing in borrow pits or compartment. The rates are inclusive for hard or cracked soil,
excavation in mud, sub-soil water or water standing in borrow pits and no claim for any extra
rate shall be entertained unless otherwise expressly specified and mentioned in the tender.
45. EMPLOYMENT OF TECHNICAL PERSONS:
The contractor shall keep one full time qualified Civil Engineer at the site, who shall be fully
authorized to receive and comply with such instructions, as given by the Executive Engineer. The
contractor shall intimate the name of such Engineer with his qualifications and experience. The
Executive Engineer shall have the right to demand the removal of any technical personnel, skilled
or unskilled workmen, who in his opinion are considered to cause bad workmanship in the
execution of works or to cause indiscipline.
46. INDUSTRIAL LABOUR LAWS
LABOUR LAWS TERMS AND CONDITIONS
1) The contractor should not be allowed to engage 50 or more contract labourers without valid
labour license under The Contract Labour (Regulation & Abolition) Act, 1970 & The Contract
Labour (R & R)(Gujarat) Rules 1972 from the Assistant Commissioner of Labour , Gandhinagar
(the said number i.e. 50 or more includes Supervisor and other staff)
2) The contractors shall have to obtain group insurance policy under Employee Compensation
Act, 2010 before starting the work.
3) All Contractors shall have to make the payment of wages to the Contract Labours engaged
by them, on or before expiry of 7th of every month through either by A/c Payee Cheque or by
crediting the wages in their bank accounts. The Contractor shall supply copy of Bank Statement
EW- 246 PUR-F-006 RFQ-73782
duly stamped by the Concerned Bank as a token of proof towards payment of Wages to HR
Department. Contractor shall intimate the Date & Mode of Payment in advance to LWO / IRO.
Contractor are also required to get the wage register of respective month certified from LWO /
IRO as per the provision laid down under the Contract Labour (R&A) Act, 1970. Any default will
result in cancellation of contract forthwith or else the contractor shall be punishable to the extent
of Rs. 100/- per day by way of fine.
4) Apart from payment of wages through bank, contractors should also make all other
payments like advances, bonus, leave encashment etc. to their labours through Banks.
5) The contractor shall give his telephone number, address, emails to the GSECL authority, so
that in case of labour unrest etc. the contractor can be contacted.
6) Maternity benefits and leave as per the provision of the Maternity Benefits Act.
7) If any workman engage by contractor meet with fatal or non-fatal accident while on duty,
then contractor shall be liable to pay compensation to legal heir or to the workman as case may
be as per Employees compensation act,2010.
8) The attendance of all contract labours of ARC / BRC contracts is to be monitored through
Bio-metric punching system only.
9) It shall be the duty of the Contractor or his Supervisor to ensure the supply of specified
number of manpower and to ensure their Bio-Metric punching and reporting at the location of
work. Non-reporting or non-availability at the location of work shall be considered as non-
punching and suitable actions can be taken by User department, including levy of penalty.
10) The contractors shall comply with the provisions of E.S.I. Act wherever applicable as per the
prevailing provisions of the Act and as amended from time to time.
11) The contractor shall be responsible and liable to pay difference in wages, if any, and /or
observe the revised service conditions that may be awarded by the Honorable court effective
from the date directed in the award to concerned Protected workmen.
12) The contractor shall require to maintain regular Labour record/ documents/ registers and
shall pay all benefits to Labour force as per applicable statutory laws and contractor shall require
to obtain clearance certificates to this effect from HR Officer of GSECL.
13) The contractor will make arrangements at his own cost to insure all men, materials and
equipment employed for this work. The GSECL will not be responsible for any loss or damage
either to the contractor‟s personnel or his equipment.
14) Dispute, if any, taking place between the contractor and laborers must be intimated to
LWO/IRO/DGM, GTPS immediately.
15) Any casualty will also have to be borne by the contractor for the period the contract
16) The Contractor shall also indemnify GSECL for injury or damage to third party other
than employees of the GSECL, contractor or sub – contractor.
17) Contractor / Agency shall have to issue the contractual appointment letter for a specific
period to their Labour engaged during the contract period each and every instance & should
narrated clear out terms & conditions for the liabilities of the concerned employees.
18) Contractor shall produce certified copy of appointment letter of each worker deployed
at GSECL, GTPS.
19) Gate pass shall not be issued without Employee insurance for work inside or outside of
factory. Engineer in charge has to ensure employee compensation insurance before
commencement of work.
20) Wages rates for contract laborers are applicable as per The Minimum Wages Act,
& The Minimum Wages (Gujarat) Rules 1961 The contractor shall have to pay wages to workers
as notified by Government of Gujarat., from time to time.
21) It should be ensured that all the labours engaged by contractor are covered under the
Employees' Provident Funds & Miscellaneous Provisions Act, 1952 and their contributions are
remitted regularly to the concerned RPFC. The Xerox copies of challan along with ECR and
remittance slip in this regards should be submitted regularly in G.S.E.C.L. office.
22) In case the contractor having more than one contract in the same Power station, the
contractor shall have to submit contract wise separate list of the workmen & maintain relevant
registers and records accordingly and submit the same to the Concerned Section & HR
department as per applicable labour laws.
EW- 246 PUR-F-006 RFQ-73782
23) The Interstate Migrant Workers Act, 1979 & The Inter state Migrant Workers (Gujarat)
Rules 1981 shall be complied by contractor in case 05 or more outstate worker/ employees is
required to engaged at GSECL GTPS TPS.
24) Person below the age of 18 years and above 60 years should not be employed for the
25) No female worker shall be employed in the night shift between 7.00 P.M. to6.00 A.M.
26) The contractor shall maintain a valid labour license under the contract labour
(Regulation and Abolition) Act for employing necessary man power to be required by contractor.
In the absence of such license the contract shall be liable to be terminated without assigning any
reasons thereof.
27) The contractor shall at his own expense comply with all labour laws and keep the
G.S.E.C.L. Indemnified in respect thereof.
28) Contractor shall obtain valid Identity cards for their workmen as prescribed under the
Factories Act 1948 and Gujarat Factories Rules, 1963 from Factory Manager or Authorized
representative of Company in prescribed form by submitting required documents before
commencement of work.
29) Payment of retrenchment compensation, Notice pay and other liabilities as per The
Industrial Disputes Act, 1947 & Gujarat Rules 1966. Any payment to the contractor's labours
arising out of any claim or disputes under the Industrial Dispute Act 1947 or any other labour
30) Payment of compensation in case of accidental injury shall be made by contractor as per the
Employee Compensation Act,
31) If the female workmen are more than 30 numbers engaged then provision of crèches and
Maternity leave as per the provision of the Maternity benefit Act, 1961shall be complied.
32) Contractor shall comply the Provision laid down under the payment of Bonus Act, 1965 for
their workmen engaged at GTPS and submit the relevant records to GSECL office.
33) The contractor must possess separate P.F. code for the above subject work.
34) Provisions of The Building and other Construction Workers (Regulation of
Employment and Conditions of Service) Act, 1996 and Gujarat Building and Other Construction
Workers (Regulation of Employment and Condition of Service) Rules, 2003 shall be complied by
contractor if contract is awarded outside the factory premises i.e. colony area & other than factory
premises before execution of work compliance shall be submitted if 10 or more workers are
engaged .Necessary documents such as registration certificate under BOCW Act etc
shall be submitted by contractor. Contractor shall obtain Gate passes for the work of carried out in
Colony area & other than factory premises from Security Section after following due procedure
from GSECL Office.
35) Paid leave facility at the rate of one day for every 20 days worked by the contract labour shall
be provided by the contractor to his workers as per factory act. ,1948. It shall be duly verified and
approved/certified by the authorized officer of the GSECL.
36) The contractor shall employ adequate number of experienced staff at site for daily supervision
and for maintaining of various registers and records required under the law and contracts. No
payment for such supervision shall be admissible.
37) If any Agency found having involved in any kind of malpractices such as less payment to its
employees, irregularity in computation of duty hours, less deduction of Provident Fund & default in
other statutory compliances or in maintaining required manpower as per Contract terms or failure
in legal compliances the Company will have the right to terminate the contract of such Agency
immediately without giving any notice. In such circumstances security deposit shall be forfeited.
38) If any complaints related to legal /statutory compliances received against contractor from its
workmen or otherwise, contractor shall be responsible to resolve the same immediately, non-
resolving the same company shall withheld his pending dues until the complaints is resolved.
39) In case the contractor‟s work is found unsatisfactory or contractor abandons, stops, or creates
hurdle during the contract period, the GSECL will be entitled to terminate the contract. In case of
default the work will be got done through other agencies at the risk and cost of contractor and
GSECL shall be entitled to recover such expenses from defaulting contractor by such methods as
deemed fit. The contractor shall not however, be entitled to terminate the contract or stop works
undertaken by him before expiry of the contract period due to any reason whatsoever.
40) Under the contract, the contractor shall either himself be present on site or should nominate
EW- 246 PUR-F-006 RFQ-73782
persons in writing, who must be available at site and who should be authorized to take decision
about the works and mutual consultation from time to time. In the absence of any responsible
man of contractor at the time of any emergency adhoc decision of Engineer-in-charge will be
binding to the contractor
41) CONTRACTOR TO INDEMNIFY THE GSECL
The contractor shall indemnify and keep indemnified the GSECL, and every member, officer and
employees of the GSECL, also Engineer-in-charge and his staff against all actions, proceedings,
claims, demands, costs and expenses whatsoever arising out of or in connection with the matter
referred in above clauses and elsewhere and against all actions, claims demands, cost and
expenses which may be made against the GSECL by any workman/ employees of contractor or any
sub contractor and or from any liability any wise to any workman/employees of the contractor or
sub-contractor under any laws, rules or regulation having in force of law including but not limited
to claims against the owner under workmen compensation Act, 1923. The Employee‟s Provident
Fund Act.1952, and/or the contract labour (Abolition and Regulation)Act, 1970 & various labour
laws applicable.
The GSECL shall not be liable for or in respect of or in consequence of any accident or injury to
any workmen or other person in the employment of the contractor or his sub-contractor, and the
contractor shall indemnify and keep indemnified the GSECL against all such damage and
compensation and against all claims, demands proceedings costs, charges and expenses
whatsoever in respect of or in relation thereto.
42) EMPLOYEE'S COMPENSATION & EMPLOYER'S LIABILITY INSURANCE
The contractor has to take Employee Insurance under the Employee
Compensation Act, 2010 for all workmen engaged by him for GSECL work contract (Location &
Order wise) and copy of the same shall be produced to GSECL prior to start work. Insurance shall
be affected for all the contractor‟s employees engaged in the execution of these contracts. If any
of the work is sublet, the contractor shall required the sub-contractor to provide Employee's
compensation and Employer's liability insurance for the latter‟s employees unless such employees
are covered under the contractor‟s insurance. It shall be liability of contractor for employees of his
sub-contractor.
43) Any other rules and regulation, conditions, Circulars etc., that are in force at present and that
may be framed by the GSECL From time to time in connection with contracts will be binding and
acceptable to contractor.
44) All relevant records i.e. registers, forms, valid licenses etc shall be maintained up to date as
per applicable all labour laws and kept ready at GSECL site office for inspection at any time or
submitted in-time to the concerned authorities as per applicable various labour laws by contractor.
45) It is the responsibility of the contractor to ensure that contractor‟s employees maintain strict
discipline as regards security, methods of safe working etc, and not to cause any hindrance to
smooth running of power station or in execution of duties by GSECL staff. Any lapse in this regard
will be viewed seriously and contract is liable to be terminated. If any of contractor‟s staff is found
unsuitable or not behaving properly, the contractor shall have to remove him from the work-site
on demand by GSECL. To keep harmonious industrial relations amongst contract labours is the
sole responsibility of the contractor. Any breach of the same will be viewed seriously.
46) Before starting the work, the contractor should contact Industrial Relation Officer/ Labour
Welfare Officer for fulfilling Labour Laws Compliances and obtaining the gate passes of all contract
labourers as per procedure laid down.
47) The contractor shall deposit 15 days salary at the rate of last drawn salary for every
completed year of services for each worker for the liabilities of the gratuity. (* applicable to
ARC/BRC works contract only).
The above instructions should be followed scrupulously to avoid undue litigation for non
Compliance of Labour Law.
Follow the following procedure at each milestone for the execution of works contract.
(A) On Commencement of Contractual Work:
EW- 246 PUR-F-006 RFQ-73782
(1) The Contractors shall have to obtain Photo-Gate-Pass as per Factory Act, 1948 before the
commencement of contractual work awarded. Contractor shall have to apply for the gate passes in
triplicate in a prescribed application form which is to be available with user Section for the entry of
workmen in the premises of GSECL including Colony premises.
(2) Such application shall have to be proceed for the approval of Factory Manager. After obtaining
approval of Factory Manager, contractor shall have to prepare the Gate Passes and obtain the
signature of Factory Manager / Authorized representative of company as per factory Act,1948.
(3) If Labours are required to be engaged in Emergency during Public Holiday or any other
day, Contractors Can apply for Temporary Gate-Pass for the maximum period of only three days
with recommendation of respective EE/SE and the same shall have to be regularized after
following the procedure of Gate Pass applications by Chief Engineer. It is to note that No
Temporary Gate-Pass shall be issued for the work other than acute emergency to carry out the
work in power station premises. Emergency work is to be justified by concerned user section and
same shall be approved by Chief Engineer.
(4) The Contractor shall have to obtain the Group Insurance Policy under the Employee
Compensation Act, 1923 prior to commencement of work. No pass whether temporary or Valid
shall be issued without insurance policy under Employee compensation Act,2010
(5) The Contractor who intend to engaged 50 or more labours to carry out the awarded
contractual work then necessary - Form No. V under the Contract Labour (R& A) Act, 1970 / Form
No. VI under the Interstate Migrant worker (employment regulation) rule 1979 as applicable is to
be obtained from HR Department for the purpose of obtaining Labour License from the Licensing
(6) Contractor shall submit Registration certificate under The Building and other Construction
Workers (Regulation of Employment and Conditions of Service) Act, 1996 and Gujarat Building and
Other Construction Workers (Regulation of Employment and Condition of Service) Rules, 2003 if
contract is awarded outside the factory premises i.e. colony area & other than factory premises
before execution of work if 10 or more workers are engaged.
(B) During Contractual Work under the progress:
(1) Bill Recording Officer/Engineer of User department shall have to ensure as to whether
contractor has engaged minimum number of contract workmen per day as per the terms of work
(2) All Contractors shall have to make the payment of wages to the Contract Labours engaged
by them on or before expiry of 7th of every month through either by A/c Payee Cheque or by
crediting the wages in their bank accounts preferably situated in the premises of GSECL. The
Contractor shall supply copy of Bank Statement duly stamped by the Concerned Bank as a token
of proof towards payment of Wages to HR Department.
(3) Contractors has to comply & maintain All statutory documents / registers at site under the
provision of labour laws such as CLRA Act, EPF & MP Act,1952, Minimum wages Act, Payment of
wages Act, Bonus Act, Gratuity Act, Factory Act, etc & other applicable labour laws.
(C) Submission of Statutory documents to ensure the compliances:
1) The Contractor shall have to submit following statutory documents, work order wise, under
the labour laws with invoice to the recording officer of user department for ensuring the
compliances of provision of labour laws for the respective execution of contract period and same is
required to be forwarded to HR Department in Office note .(Copy attached).
List of documents are given below:
1. Copy of Attendance register – with name & address of establishment, Name of work and site
(duly signed & stamp by Contractor and sub- contractor) - Form XVI.
2. Copy of Wage Payment Sheet – with signature of workmen, (duly signed & stamped by
Contractor sub-contractor)- Form XVII.
3. Copy of Bank Statement of Wage Payment for the proof of wage payment (Duly signed &
Stamp by Concern Bank and contractor and sub contractor
4. Copy of PF Challan along with ECR Statement of respective period. (High light n employees
EW- 246 PUR-F-006 RFQ-73782
5. EPF Remittance Slip
6. Bonus register with payment details ( If Applicable)
7. Leave Encashment Register with payment details (If applicable )
8. Undertaking for labour law compliances on non- judicial stamp paper of Rs.300/- to be
submitted with notarized at the time of processing the final bill.
Contractor shall specify the Name of Work, Place of Work and Work order number in Muster Roll-
Form No. XVI & Wage Register – Form No XVII as Prescribed under the Contract Labour (R&A)
Act, 1970 & rules thereof.
2) The Recording Officer/ Engineer of User department shall furnish the details and statutory
documents in the form of prescribed Office Note as enclosed in Annexure „‟A‟‟ and the same should
be submitted to LWO / IRO/PO /DGM for onward action. (Copy Enclosed) .
3) In case of running contracts, if the contractor does not fulfill the requirement of documents
(PF Challan, Wage Registers etc), RA Bill shall not be processed until the documents are submitted.
4) On submission of relevant documents to LWO /IRO/PO/DGM by Office Note. The same will be
intimated to Accounts Section for Compliances of Labour Laws.
5) If contractor failed to submit above documents in that case his payment of Bill shall be
withheld by GSECL, GTPS and on submission of the required documents the said bill shall be
released by GSECL GTPS.
6) Original copies of above mentioned documents and other legal documents as per requirement
shall be produced before Dy. G.M. (HR) / IRO / LWO / In-charge of H.R. Department as and when
7) The GSECL will be entitled to deduct directly from the bill to be paid to the contractor, any
sum or sums payable by the contractor and which sum/sums the GSECL is required to pay as a
principal employer on account contractor‟s default in respect of all liabilities referred to in above
8) GSECL shall entitled to fulfill statutory liabilities under applicable laws being a principal
employer if contractor, its Sub Contractor fails to comply statutory compliance towards his
workmen. The amount of the same can be recovered from pending dues of contractor with
appropriate penalty and administrative charges / Service charges.
9) Office correspondence will be carried out in English / Gujarati. The English version will be the
correct one and the same only will held good for legal matters.
10) Any other rules and regulation, conditions, etc., that are in force at present and that may be
framed by the GSECL From time to time in connection with contracts will be binding and acceptable
11) Contractor have to follow gate pass procedure in view of guideline issued by GSECL Corporate
Office vide letter No. GSECL/CEG/Corporate Safety/Gate Pass Procedure/1029 Dtd. 30.05.2019
(Performa of Gate Pass is attached herewith).
12) In view of GSECL Corporate Office Circular No. GSECL / CEG / G.I / Circular / Works/815 Dtd.
02.05.2019 Contractor have to follow all the terms and condition / guideline related to contract
labour management system such as Biometric punching, compliance to various labour laws, regular
submission of statutory documents etc. for obtaining no objection certificate from HR.
13) As per tender terms and conditions. In case of contractor or OEM/ OES are permitted to
perform the works portion through sub-contractor, It would be necessary for such OEM/ OES to
submit Declaration cum Indemnity Bond in specified format on Rs.300/ Non judicial stamp paper
and Bills submitted by the OEM/ OES on behalf of subcontractor shall be processed only by
complying statutory provision under applicable acts.
14) If any problem may arise for payment of wages through bank, same may inform to Chief
Engineer (Gen.) and after approval only , the payment shall be disbursed in presence of the GSECL
representative i.e. HR officer during the working hours in the factory premises and the contractor
shall get the entries certified in the register of wages by the representative of the GSECL
15) During the tenure of work order, if by order of Court any workman engaged by them declared
as protected workman or during the pendency of proceedings at court, then concerned contractor
shall be binding to maintain status-quo until further order of court.
16) Nothing in the contract document stated shall anywise construe any work man/employees of
the contractor or sub-contractors as or to be workman employee of the Owner or place obligatory
liability in respect of any such workman/employees upon GSECL.
EW- 246 PUR-F-006 RFQ-73782
On Non-Judicial Stamp Paper of Rs.
To be submitted with NOTORIZED at the time of final bill
UNDERTAKING FOR LABOUR LAW COMPLIANCES
I, Proprietor / Owner / Partner / Authorized
Agent of M/s. do hereby declare and undertake as
1. That in capacity of independent contractor for M/s.
(Sub-Contractor of M/s. ) worked as
Contractor at GSECL, GTPS Thermal Power Station for the nature of work of
against Work Order
No. Dt. ., I have
complied with the provisions of all laws as applicable. I have paid the wages for the
month/s of my contractual period which is/are not less than the minimum rates as
applicable, to all my employee/s and no other dues are payable to my employee/s.
2. That I have covered all the eligible employee/s under the Employees‟ Provident Funds
and Miscellaneous Provisions Act, 1952 and deposited the contributions under my P.F.
Code No. Place: for the month/s
of my contractual period and as such no amount towards contributions whatever is
3. I further declare and undertake that in case any liability pertaining to any of my
worker, labour, employee/s is/are to be discharged by the Principal Employer i.e.
Gujarat State Electricity Corporation Limited, GTPS due to my lapse, I undertake to
reimburse the same or the Principal Employer is authorized to deduct the same from
my dues as payable.
I further declare and undertake the legal consequences which may arise in future under the
said work awarded, and I bound myself to resolve the same at the risk and cost of
EW- 246 PUR-F-006 RFQ-73782
EW- 246 PUR-F-006 RFQ-73782
EW- 246 PUR-F-006 RFQ-73782
EW- 246 PUR-F-006 RFQ-73782
EW- 246 PUR-F-006 RFQ-73782
48. Relationship of employee: - Every bidder should, at the time of submission of bid, give a
declaration as under.
"If in any bidder company/firm, the interest (i.e. Shareholding in company and share in partnership firm)
of any employee of the tendering Company or his/her relative as defined in section 2(77) of the
Company's act. 2013 is 10% or more, the tendering Company will not deal with such company/firm at
Tenderer therefore, must specifically disclose this fact in his technical bid. Non-disclosure of such facts
would immediately disqualify the tenderer for further dealing with the tendering company."
49. Conflict of interest among Bidders/Agents: A bidder shall not have conflict of interest with other
bidders. Such conflict of interest can lead to anti-competitive practices to the detriment of Procuring
Entity's interests. The bidder found to have a conflict of interest shall be disqualified. A bidder may be
considered to have a conflict of interest with one more parties in this bidding process, if:
a) They have proprietor/partner(s)/Director(s) in common; or
b) They receive or have received any direct or indirect subsidy/financial stake from any of them; or
c) they have the same legal representative/agent for purposes of this bid; or
d) they have relationship with each other, directly or through common third parties, that puts them in a
position to have access to information about or influence on the of bid of another bidder; or
e) Bidder participates in more than one bid in this bidding process. Participation by a bidder in more than
one Bid will result in the disqualification of all bids in which the parties are involved. However, this does
not limit the inclusion of the components/sub-assembly/assemblies from one bidding manufacturer in
more than one bid.
f) in cases of agents quoting in offshore procurements, on behalf of their principal manufacturers, one
agent cannot represent two manufacturers or quote on their behalf in a particular tender enquiry. One
manufacturer can also authorize only one agent/dealer. There can be only one bid from the following:
1. The principal manufacturer directly or through one Indian agent on his behalf; and
2. Indian/foreign agent on behalf of only one principal.
g) a Bidder or any of its affiliates participated as a consultant in the preparation of the design or technical
specifications of the contract that is the subject of the Bid;
h) in case of a holding company having more than one independently manufacturing units, or more than
one unit having common business ownership/management, only one unit should quote. Similar
restrictions would apply to closely related sister companies. Bidders must proactively declare such
sister/common business/management units in same/similar line of business.
i) Bidder shall not act in contravention/violation to the provisions of competition act, as amended from
Every bidder should, at the time of submission of bid, give a declaration, that bidder shall not have conflict
of interest with other bidders, as above.
ADDITONAL TERMS AND CONDITIONS
ADDITIONAL TERMS AND CONDITIONS REGARDING INDUSTRIAL LAW
AND OTHER RELATED MATTERS FOR THE TENDER DOCUMENTS.
1. Wages to be paid and time of payment etc., by the contractor
(A) The contractor shall pay minimum wages as may be specified hereafter or rates fixed under the
Minimum Wages Act whichever is higher. The wages of every contract labour employed by him
under his contract shall be paid by him before the expiry of 7th day of the last day of the month in
respect of which the wages are payable (i.e. Wages of a Month have to be paid by him in-the first week
of the next month). The payment shall be disbursed in the presence of Management Representative
during the working hours in factory premises and the contractor shall get the entries certified in the
register of wages by the Representative of the Board. Any default will result in cancellation of contract
forthwith or else the contractor shall be punishable to the extent of Rs 100/- fine per each day or as
decided by Govt.
(B) The contractor shall give his own / acting directors telephone number and full permanent /
correspondence addresses to the Corporation so that in case of labour trouble etc., the contractor can
EW- 246 PUR-F-006 RFQ-73782
be contacted. The contractor shall arrange to have his office outside the factory premises and the
contractor keep himself present throughout the working hours.
(A) Persons below the age of 18 years shall not be employed for the work.
(B) No female worker shall be employed in the night shift between 7 pm to 6 am.
(C) Contractor shall maintain a valid labour license under Contract Labour (Regulation and abolition) Act
for employing necessary manpower to be required by him. In the absence of such license; the contract
shall be liable to be terminated without assigning any reasons thereof.
(D) The contractor shall at his own expense comply with all labor laws and keep the
Corporation indemnified in respect thereof. Some of the major liabilities under various labour and
industrial laws which the contractor shall comply with are as under:
(i) Payment of Contribution by way of Employer's Contribution towards Provident Fund Family Pensions
Scheme Deposit Linked Insurance Scheme. Administrative charges etc at the rates made applicable from
time to time by Government of Gujarat/Government of India or other Statutory Authority.
(ii) Payment of deposit in respect of each contract labor at the rate of Rs 250/- with the office of
Commissioner of Labor as per the Contract Labor (Regulation and Abolition) Act
(iii) License Fee as prescribed under the contract Labor (Regulation and Abolition) Act and rules framed
there under depending upon the number of workmen employed by the contractor and to keep all
register under the contract labor Act.
(iv) Paid leave facility and wages as per the provision of the Factories Act at the rate of one day for
every days of working.
(v) Identity cards as prescribed under the Factories Act with photo affixed there to the same for
identification.
(vi) Payment of retrenchment compensation. Notice pay and other liabilities as per Industrial Disputes
Act. Any payment to the contractor's employees arising out of any claim or disputes under the Industrial
Disputes Act 1947 or any other labour laws
(vii) Full Payment of compensation in case of accidental injury
(viii) Provision of crèche if the female laborer employed are more than 30 numbers
(ix) Maternity Leave as per the provision of the Maternity Benefit Act.
(x) Bonus as per payment of Bonus Act 1965. 3. Provident Fund and Family Pension
The contractor shall submit along with his bill (month wise) a statement regarding deductions against
employees provident fund and family Pension Scheme in respect of each concerned employee. Provident
Fund and Family Pensions Scheme at the rate of 12% (or at rate made applicable by the Government
from time to time) of the wages. The contractor‟s contribution and his workers contribution towards
Provident Fund and Family Pensions Scheme shall be deposited by the contractor with Regional
Provident Fund Commissioner, Ahmedabad.
4. Deposit Linked Insurance Scheme
Contractor shall have to deposit 1/2 % of the wages in respect of employees who is a member of the
Provident Fund as the contribution to the Deposit Linked Insurance Scheme with Regional Provident
Commissioner, Ahmedabad or in line of any Scheme of Govt
5. Administrative Charges
Administrative charges for maintaining Provident Fund A/c shall be deposited by the contractor with
Regional Provident Fund Commissioner, Ahmedabad at the rates applicable.
6. Paid Leave Facility
EW- 246 PUR-F-006 RFQ-73782
Paid leave facility at the rate of one day for every twenty days worked by the contract labour shall be
provided by the contractor to his workers. He shall maintain leave records/leave cards for individual
laborer which shall be duly verified and approved/certified by the authorized officer of the Corporation‟s
as well as by the Concerned Govt. Authority.
7. Workmen’s Compensation Fund and Employer’s Liability Insurance
The contractor shall cover all his employees under Workmen's Compensation Fund and under the
liabilities of Group Insurance.
8. The contractor shall employ adequate number of experienced staff at site for daily supervision and
for maintenance of various registers and records required under the law and contract. No payment for
supervision shall be admissible.
9. Contractor to indemnify the corporation
The contractor shall indemnify the Corporation and every member officer and employees of the
Corporation, also Engineer-in-charge and his staff against all actions, proceedings, claims, demands,
costs and expenses whatsoever arising out of or in connection with the matters referred in herein above
elsewhere and against all actions, proceedings, claims, demands, costs and expenses which may be
made against the Corporation / Government for in respect of or performance of his obligation under the
contract documents. The Corporation shall not be able for or in respect of or in consequence of any
accident or injury to any workmen or other persons in the employment of the contractor or his sub-
contractor and the contractor shall Indemnify and keep indemnified the corporation against all such
damage and compensation and against all claims, demands, proceedings costs, charges and expenses
whatsoever in respect thereof or in relation thereto.
10. Workmen's Compensation and Employer's Liability Insurance
Insurance shall be affected for all the contractor‟s employees engaged in the performance of his
contract. If any of the work is sublet, the contractor shall require the sub-contractor to provide
workmen‟s compensation and Employer‟s Liability insurance for the latter‟s employees unless such
employees are covered under the contractor‟s insurance.
11. The Corporation reserves all the right to terminate this contract at any time during its tendency
without giving notice of termination or any reasons thereof
12. The Corporation will be entitled to deduct directly from the bills, to be paid to the contractor any
sum or sums payable by contractor and which sum/sums the Corporation is required to pay as a
principal employer on account of contractor' default in respect of all liabilities referred to in above
The above are some of the major liabilities of the contractor in addition to other liabilities prescribed
under the various labour laws in force from time to time from Statutory Authorities like State
Government/Government of India which the contractor shall have to comply with.
1.0 Wages to be paid and time of payment etc. by the contractor
The contractor shall comply with the labour laws as may be current and shall furnish the
returns and information as may be specified from time to time.
At plant gate and at Colony gate, biometric punching system is adopted by GSECL. Agency has to
ensure that their laborers shall punch while entry and exit from the premise.
Agency has to ensure that labour Payment shall be deposited to the bank account of concern
labour directly and evidence thereof shall be submitted to Labour welfare officer for verification along
with each bills.
The contractor shall as far as possible obtain his requirements of labour, skilled, and unskilled
from the local area. No person below the age of 18 years shall be employed as laborers.
The contractor shall pay fair and reasonable wages (whether or not such wages are
controlled by any laws existing at the time), to the workmen employed by him for the work. In the
event of any dispute arising between the contractor and his workmen on the grounds that the wages
paid are not fair and reasonable, the dispute shall in the absence of legal or other relief to the
workmen shall be referred to the Engineer-in-charge who shall decide the same. The decision of the
EW- 246 PUR-F-006 RFQ-73782
Engineer-in-charge shall be conclusive and binding on the contractor but such decision or any other
decision in this behalf that the contractor's workmen may obtain by recourse to law or other level
means available to them, shall not in any way, effect the condition in the contract regarding payments
to be made by Corporation to the contractor only at the rates accepted in this contract.
The contractor shall not employ animal suffering from sores, lameness, or emaciation or
which are immature nor shall he treat them in a way that may be considered inhuman.
The Engineer-in-charge shall have the authority to remove from the work any animal, he
may consider unfit or undesirable and no responsibility shall be accepted by the Corporation for any
delay or extra expense caused towards the completion of the work by such removal.
If Government declares a state of scarcity or famine to exist in any village situated within
10 miles of the work the piece worker/contractor shall employ upon such parts of the work as are
suitable for unskilled labour any person certified to him by the Executive Engineer-in-charge or by any
person to whom the Executive Engineer-in-charge may have delegated his duty in writing to be in
need of relief and shall be bound to pay to such person wage not below the minimum which
Government may have fixed in this behalf. Any disputes which may arise in connection with the
implementation of this clause shall be decided by the Superintending Engineer-in-charge whose
decision shall be final and binding on the piece worker/contractor.
The contractor shall provide reasonable facilities to the satisfaction of the Engineer-in-charge,
for the labour employed by him where no such natural facilities exist. The usual facilities are weather
proof shelter for rest and meal, supply of wholesome drinking water, facilities for obtaining food,
reasonable washing and sanitary facilities, special facilities, for women workers, suitable residential
accommodation, recreational and cultural activities, general sanitation and health measures etc.
The implementation of any and all provisions of this clause shall in no way entitle the
contractor to claim compensation or rates higher than tendered in this contract.
The contractor shall pay the wages as per Minimum Wages Act. The wages of every
contract labour employed by him under this contract shall be paid by him before the expiry
of 7th day of the last day of the month in respect of which the wages are payable (i.e.
Wages of a Month have to be paid by him in the first week of the next month). The
payment shall be disbursed in the presence of Management Representative during the
working hours in factory premises and the contractor shall get the entries certified in the
register of wages by the Representative of the Corporation. Any default will result in
cancellation of contract forthwith or else the contractor shall be punishable to the extent of
Rs.100/- fine per each day. The contractor is liable to compensate the expenses incurred by
the Corporation for non-compliance of laws from his end
The Contractor shall give his telephone number and address to the Corporation so that in
case of labour troubles etc. the contractor can be contacted. The contractor shall arrange to have his
office outside the factory premises and the contractor has keep himself present throughout the
working hours. The Contractor shall intimate immediately to Engineer in charge of Corporation in case of
any labour troubles etc.
2.0 Labour Laws
a) Person below the age of 18 years and above 60 years should not be employed for the work.
b) No female worker shall be employed in the night shift between 7.00 P.M. to 6.00 A.M.
c) The contractor shall maintain a valid labour license under the contract labour (Regulation and Abolition)
Act for employing necessary man power to be required by contractor. In the absence of such license
the contract shall be liable to be terminated without assigning any reasons thereof.
d) The contractor shall at his own expense comply with all labour laws and keep the G.S.E.C.L. Indemnified
in respect thereof. Some of the major liabilities under various labour and industrial laws, which the
contractor shall have to comply, which are as under:
I) Payment of contribution by way of employee‟s contribution towards provident fund, family pension
scheme, deposit linked insurance scheme, administrative charge etc., at the rates made applicable from
time to time by Govt. of Gujarat /Govt. of India and other statutory authorities.
II) Payment of deposit in respect of each contract labour at the rate applicable of with the offices of
Commissioner of Labour as per the contract labour (Regulation and Abolition) Act.
III) License fee as prescribed under the contract labour (Regulation and Abolition) Act and rules framed
there under depending upon the number of workmen employed by contractor.
IV) Identity cards as prescribed under the factories Act shall be issued to workmen.
EW- 246 PUR-F-006 RFQ-73782
VI) Payment of retrenchment compensation, Notice pay and other liabilities as per Industrial Disputes Act.
Any payment to the contractor's employees arising out of any claim or disputes under the Industrial
Dispute Act 1947 or any other labour laws
VI) Payment of compensation in case of accidental injury shall be made as per the WC Act.
VII) If the female workmen are more than 30 numbers engaged then provision of crèches, shall be
complied accordingly.
VIII) Maternity leave as per the provision of the maternity benefit Act.
The above are some of the major liabilities of the contractor in addition to other liabilities prescribed
under the various labour laws in force from time to time from statutory Authorities like State
Government / Government of India, which the contractor shall have to comply with.
2) PROVIDENT FUND AND FAMILY PENSION SCHEME
The contractor shall submit along with his bill (month wise) statement regarding deductions against
employees‟ provident fund and family pension scheme in respect of each concerned employee.
Provident fund and family pension scheme at the rate of 12 % of wages (or at the rates made applicable
by the Government time to time). The contractor‟s contribution and his workers contribution towards
provident fund and family pension scheme shall deposited by the contractor with Regional Provident
Fund Commissioner, Ahmedabad. In case if the contractor deposits the contribution to the Assistant
Provident Fund Commission, the xerox copy of challans and schedule must be submitted in the office.
For maintaining the CPF Account of contractor‟s employees the contractor will have to pay administrative
charges as applicable of the emoluments of the employer of the contractor's every month.
3) GROUP INSURANCE SCHEME
The contractor has to take Group Insurance for all workmen engaged by him and copy of the same shall
be produced to Concerned Officer.
4) PAID LEAVE FACILITY
Paid leave facility at the rate of one day for every 20 days worked by the contract, labour shall be
provided the contractor to his workers. It shall be duly verified and approved/certified by the authorized
officer of the GSECL.
5) The contractor shall employ adequate number of experienced staff at site for daily supervision and for
maintaining of various registers and records required under the law and contracts. No payment for such
supervision shall be admissible.
6) CONTRACTOR TO INDEMNIFY THE GSECL
The contractor shall indemnify and keep indemnified the GSECL, and every member, officer and
employees of the GSECL, also Engineer-in-charge and his staff against all actions, proceedings, claims,
demands, costs and expenses whatsoever arising out of or in connection with the matter referred in
above clauses and elsewhere and against all actions, claims demands, cost and expenses which may be
made against the GSECL by any workman/ employees of contractor or any sub contractor and or from
any liability any wise to any workman/employees of the contractor or sub-contractor under any laws,
rules or regulation having in force of law including but not limited to claims against the owner under
workmen compensation Act, 1923. The Employee‟s Provident Fund Act.1952, and/or the contract labour
(Abolition and Regulation) Act,
The GSECL shall not be liable for or in respect of or in consequence of any accident or injury to any
workmen or other person in the employment of the contractor or his sub-contractor, and the contractor
shall indemnify and keep indemnified the GSECL against all such damage and compensation and against
all claims, demands proceedings costs, charges and expenses whatsoever in respect of or in relation
07) WORKMEN'S COMPENSATION & EMPLOYER'S LIABILITY INSURANCE
Insurance shall be affected for all the contractor‟s employees engaged in the execution of these
contracts. If any of the work is sublet, the contractor shall required the sub-contractor to provide
workmen's compensation and Employer's liability insurance for the latter's employees unless such
employees are covered under the contractor‟s insurance. It shall be liability of contractor for
employees of his sub-contractor.
08) Any other rules and regulation, conditions, Circulars etc., that are in force at present and that may be
framed by the GSECL From time to time in connection with contracts will be binding and acceptable to
09) The contractor must possess separate P.F. code for the above subject work.
10) Attendance rolls shall be maintained up to date. All the written registers, Performa etc shall be filled up
EW- 246 PUR-F-006 RFQ-73782
and maintained up to date and kept ready for inspection at any time or submitted in-time to the
concerned authorities as per contract labour etc. Factory Act etc By contractor
11) It is the responsibility of the contractor to ensure that contractor‟s employees maintain strict discipline
as regards security, methods of safe working etc, and not to cause any hindrance to smooth running of
power station or in execution of duties by GSECL staff. Any lapse in this regard will be viewed seriously
and contract is liable to be terminated. If any of contractor‟s staff is found unsuitable or not behaving
properly, the contractor shall have to remove him from the work-site on demand by GSECL. The
contractor shall have to strictly observe the rules and conditions specified in the enclosed works contract
booklet of the GSECL, which are not modified hereunder. To keep harmonious industrial relations
amongst contract labours is the sole responsibility of the contractor. Any breach of the same will be
viewed seriously.
12) Before starting the work, the contractor should contact Industrial Relation Officer/ Labour Welfare
Officer for all formalities and obtaining the gate passes of all contract labourers and for other formalities.
13) The contractor shall deposit 15 days salary at the rate of last drawn salary for every completed year of
services for each worker for the liabilities of the gratuity ( * applicable to ARC/BRC works contract only)
14) The contractor shall pay bonus as per applicability of act.
Follow the following procedure at each milestone for the execution of works contract.
(A) On Commencement of Contractual Work:
(1) The Contractors shall have to obtain Photo-Gate-Pass before the commencement of contractual
work awarded. Contractor shall have to apply for the gate passes in triplicate in a prescribed application
form which is to be available from Security Section for the entry of workmen in the premises.
(2) Such application shall have to be proceed for the approval of Factory Manager. After obtaining approval
of Competent Authority, contractor shall have to prepare the Gate Passes and obtain the signature of
Factory Manager.
(3) If Labours are required to be engaged in Emergency during Public Holiday , Contractors Can apply for
Temporary Gate-Pass for the period of only three days with recommendation of respective EE/SE and
the same shall have to be regularized after following the procedure of Gate Pass applications on the
office working day from HR Department. It is to note that No Temporary Gate-Pass shall be issued for
the work other than acute emergency to carry out the work in power station premises.
(4) The Contractor shall have to obtain the Group Insurance Policy under the Employee Compensation Act,
1923 prior to commencement of work.
(5) The Contractor who intend to engaged 50 or More than 50 labours to Carry out the awarded contractual
work then necessary - Form No. V under the Contract Labour (R& A) Act, 1970 / Form No. VI under the
Interstate Migrant worker (employment regulation) rule 1979 as applicable is to be obtained from HR
Department for the purpose of obtaining Labour License from the Licensing Authority.
(B) During Contractual Work under the progress:
(1) Bill Recording Officer of User department shall have to ensure as to whether contractor has engaged
minimum number of contract workmen per day as per the terms of work order.
(2) All Contractors shall have to make the payment of wages to the Contract Labours engaged by them,
on or before 7th of every month through Nearest Nationalized Bank compulsory, preferably situated in
the premises of Wanakbori TPS area in case of ARC /BRC works Contract. The Contractor shall supply
copy of Bank Statement duly stamped by the Concerned Bank as a token of proof towards payment of
Wages to HR Department Contractor has also required to get the wage register of respective month
certified from LWO / IRO as per the provision laid down under the Contract Labour (R&A) Act,
(3) All Contractors has to comply & maintain statutory documents / registers at site under the provision
of labour laws & EPF Act.
(C) Submission of Statutory documents to ensure the compliances:
1) The Contractor shall have to submit following statutory documents, work order wise, under the
labour laws and EPF to the recording officer of user department for ensuring the compliances of
provision of labour laws and EPF Act for the respective working period.
Copy of Attendance register – with name & address of establishment, Name of work and site (duly
signed & stamp by Contractor ) - Form XVI
Copy of Wage Payment Sheet – with signature of workmen, duly signed & stamped by Contractor -
Copy of Bank Statement of Wage Payment (duly signed & Stamp by Concern Bank)
Copy of PF Challan along with ECR Statement
EW- 246 PUR-F-006 RFQ-73782
Copy of Gate Pass Permission ( duly signed by Authorities ) -
Copy of Work Order ( First Time )
Copy of Valid W.C. Policy ( First Time)
Copy of Valid Labour License ( If Applicable in case of More than 9 manpower Engaged by
Contractor for said work ) ( First Time)
Form No. XIII – Register of workers employed by Contractor ( First Time)
Prescribed under the Contract Labour (R&A) Act, 1970 Contractor shall specify the Name of Work, Place
of Work and Work order number in Muster Roll- Form No. XVI & Wage Register – Form No XVII.
3.0 LIABILITY FOR ACCIDENTS TO PERSONS:
The contractor or sub-contractor shall indemnify the Corporation against any claims which may be
made under the workman's compensation Act, 1923, or any statutory modification or otherwise for
or in respect of any damages or compensation payable in consequence of any accident or injury
caused, by fault of contractor or sub-contractor and sustained by any workman or other person in the
employment of the contractor or sub-contractor. In every case in which by virtue of the provisions
of sub-section (1) of section 12 of the workman's Compensation Act, 1923, the Corporation is
obliged to pay compensation to a workman employed by the contractor or sub-contractor in execution
of the work, the Corporation will recover from the contractor the amount of compensation so paid, and
without prejudice to the rights if the Corporation under sub- section (2) of section 12 of the said Act
any such amount shall be paid by contractor within 30 days, failing which the Corporation shall be at
liberty to recover such amount of any part thereof by deducting it from any some due by the
Corporation to the contractor under this contract or otherwise. The board shall not be bound to
contract any claim made against either of them under section 12, sub- section (1) of its said Act,
except on written request from the contractor and upon his giving to the Corporation full security
for all costs for which the Corporation might become liable in consequence for entertaining such
The contractor and/or sub-contractor named in the contract shall indemnify the
Corporation against all claims based upon injury or death to any person in the employ of the
contractor or sub-contractor, or to third parties under paragraph (a) 2 or condition No. 47 to
the extent of any sums recovered under the insurance policy.
On the occurrence of an accident which results in the death of workman employed by
the contractor or sub-contractor, which is so serious as to be likely to result in the death of
any such workman, the contractor shall within 24 hours of happening of such accidents
intimate in writing to the Engineer-in-charge the fact or such accidents. The contractor or
sub-contractor shall indemnity Corporation against all loss or damage sustained, by the
Corporation resulting directly or indirectly from his failure to give intimation in the manner
aforesaid including penalties or fine if any, payable by board as a consequence of
Corporation’s failures, to give notice under workman's compensation Act or otherwise to
confirm to the provisions of the said Act in regard to such accident.
The contractor will be responsible for complying with all rules and regulations and
labour land applicable to him and the board will not be responsible for any lapses committed
by them. If there is any claim from any Govt. Authority pertaining to the contractor the same
amount will be deducted from the contractor’s bill.
The above are some of the major liabilities of the contractor in addition to other
liabilities prescribed under the various labour laws in force from time to time from Statutory
Authorities like State Government/ Government of India which the contractor shall have to
"The contractor shall procure, or arrange for the sub-contractor to procure insurance coverage in
amount approved by the Corporation and sufficient to protect against the following risks arising out of
the work. The contractor shall cover all his employees under Workmen‟s Compensation Act if ESI Act is
not applicable. The Contractor has to fulfill his liabilities i.e. contribution, filing of returns etc. if ESI Act
Accidents and professional and non-professional sickness of all laborers and personnel engaged in the
work as required by law pursuant to workmen compensation Act,
EW- 246 PUR-F-006 RFQ-73782
Injury or death to third parties including without limitation injury or death caused by any of the
construction aids or other vehicles or rented equipment used by the contractor or subcontractor,
whether at the site of elsewhere".
(a) All insurance referred to under a) of this condition shall be in effect from the date of
commencement of work and shall remain in force until the work has been completed and finally
accepted by the Corporation or such extended period as may be decided by the Corporation.
(b) In the policies covering the insurance referred to above, contractor and sub-contractor shall be
named as co-insured where possible.
(c) The cost of insurance shall be borne by the contractor.
(d) Insurance shall be affected for all the contractor‟s employees engaged in the performance of this
contract. If any of the work is subjected to the sub-contractor, the contractor shall require that he or his
sub- contractor to provide workmen‟s compensation and employer‟s liability insurance for the latter‟s
employees unless such employees recovered under the contractor‟s insurance.
5.0 Accommodations to labours
1. The contractors shall, at their own expense make all necessary provisions for Housing, water supply
and sanitary arrangements for their employees as well as for works and shall pay direct to the
authorities concerned, all rates and taxes.
2. The contractor shall construct the quarters for his staff on a good spot selected by him. The
contractor shall maintain at his own cost an efficient staff to clean sewage as may be suggested by
Engineer-in-charge.
3. Suitable fire preventive measures to the satisfaction of the Engineer-in-charge shall be taken by the
4. The contractor shall construct trench or semi-permanent latrines for the use of laborers. Such latrines
shall be on a scale of not less than 5 per 100 persons in the camp. Separate latrines shall be provided
for men and women. The huts for laborers shall be sufficient in nos. and shall confirm to the following
5. Huts of bamboo and grass may be constructed.
6. The camp shall not be established close to a large cutting or earthwork.
7. The lines of huts shall have open spaces at least 10 yards between two rows. Due attention shall be
given to drainage.
8. A floor space at a minimum rate of 30 sft. Per head shall be provided in the hutments.
9. The contractor shall construct at least one bathing place per 20 persons. The baths shall be properly
screened and separate bathing places for men and women shall be provided. Washing places shall be
provided at minimum one per 30 persons.
10. Sufficient arrangements for drainage of sewage water from bath, washing, etc. shall be made to
the satisfaction of the Engineer-in-charge.
11. Contractor shall maintain necessary staff for conservancy and cleanliness of the camp to the
satisfaction of Engineer-in-charge. At least one sweeper per 200 persons should be employed. The
Assistant Director of Public Health shall be consulted before opening a layout camp and his instructions
in respect of water supply, sanitary conveniences, camp site accommodation and food supply etc.
should be followed by the contractors. The contractor shall make arrangement for all anti malaria
measures or in case of epidemic shall take necessary measures as directed by the Assistant Director of
Public Health. Safety precaution as laid down by the safety manual published by C.W. and T.C. shall be
followed by the contractor; a copy of the manual will be available for reference at the Office, of the
Engineer-in-charge.
6.0 Paid Leave Facility:
Paid leave facility at the rate of one day for every twenty days worked by the contract labour shall be
provided by the contractor to his workers. He shall maintain leave records/leave cards for individual
laborers which shall be duly verified and approved/ certified by the authorized officer of the Corporation.
7.0 Gratuity / Bonus liabilities:
The contractor shall pay Gratuity and Bonus to its eligible employees under the Gratuity Act and Bonus
Act if it is applicable.
8.0 The Contractor shall employ adequate number of experienced staff at site for daily
supervision and for maintenance of various registers and records required under the law and
contract. No payment for supervision shall be admissible.
9.0 Contractor to indemnify the Corporation
The contractor shall indemnify and keep indemnified the Corporation and every officer and employees
EW- 246 PUR-F-006 RFQ-73782
of the Corporation and also Engineer-In-Charge and his staff against all actions, proceedings, claims,
demands, costs and expenses whatsoever arising out of or in connection with the matters referred in
above clauses and elsewhere and against all actions, claims, demands, costs and expenses which may
be made against the Corporation by any workman/employee of the contractor or any sub contractor
and/or from any liability may arise to any workman/employees of the contractor or any sub contractor
under any laws, rules or regulation having the force of law including but not limited to claims against the
owner under workmen compensation Act, 1923. The employee‟s Provident Act 1952, and/or the
contract Labour (Abolition and Regulation) Act 1979. The Corporation shall not be liable for or in
respect of or in consequence of any accident or injury to any workmen or other person in the
employment of the contractor or his sub-contractors, and the contractor shall indemnify and keep
indemnified the Corporation against all such damage and compensation and against all claims,
demands, proceedings costs, charges and expenses whatsoever in respect thereof or in relation thereto.
10.0 The Corporation reserves the right to terminate this rate contract at any time during its pendency
without giving notice of termination or any reasons thereof.
11.0 The Corporation will be entitled to deduct directly from the bills, to be paid to the Sub-contractor
and Laborers any sum or sums payable by you and which sum/sums the Corporation is required to pay
as a principal employer on account of your default in respect of all liabilities referred to in above clauses.
12.0 Nothing in the contract document stated shall any wise constitute any workmen/employees of the
contractor or any sub-contractor as or to be workmen/employee of the power, or place obligation or
liability in respect of any such workmen/employee upon the Corporation
13.0 Bidder should note that the prevailing Act at the time of execution of work over and above act
specified herein shall be binding to the Contractor.
14.0 Employment of Scarcity Labour:
If Government declares a state of scarcity or famine to exist in any village situated within 20 Kms of the
work, the piece worker/contractor shall employ upon such part of the work as are suitable for unskilled
labour; any person certified to him by the Executive Engineer or by any person to whom Executive
Engineer may have delegated this duty in writing to be in need of relief and shall be bound to pay such
person wage not below the minimum, which Government may have fixed in this behalf from time to
time. Any implementation of this clause shall be decided by the Superintending Engineer/Engineer-in-
charge whose decision shall be final and binding on the piece worker/contractor.
15.0 DEPOSIT LINKED INSURANCE SCHEME:
The contractor shall have to deposit 0.50% (half percent) or the rate applicable from time to time of the
wages in respect of employees who are members of the PF, as the contribution to the Deposit Linked
Insurance Scheme, with the Regional Provident Fund Commissioner.
16.0 MINIMUM WAGES ACT:
The contractor shall pay prevailing minimum wages as applicable from time to time to the laborers
engaged by him as per the Minimum Wages Act payment in Bank / presence of the GSECL‟s officer or
representative.
17.0 ADMINISTRATIVE CHARGES: Administrative charges for maintaining Provident Fund account
shall be deposited by the contractor with the Regional Provident Fund Commissioner, Ahmedabad, at
the rates applicable.
18.0 E.S.I. ACT: The contractors shall comply with the provisions of E.S.I. Act wherever applicable as
per the prevailing provisions of the Act and as amended from time to time.
19.0 LABOUR LICENSE FOR LABOUR CONTRACT: The Contractor / Agency shall have to obtain the
copy of Labour Contract License under contract Labour (Regulation & Abolition) Act from the
appropriate authorities before commencement of work.
20.0 WORKMEN’S COMPENSATION FUND AND EMPLOYER’S LIABILITY INSURACE:
Insurance shall be affected for all the contract employees engaged in the performance of this
contract. If any of the work is sublet after due permission in writing from the GSECL, the contractor shall
require the sub – contractor to provide workmen‟s compensation and employer‟s liability insurance for
the later employees, unless such employees are covered under the contractor‟s insurance. It shall be the
liability of contractor for employees of his sub – contractor. The contractor must insure that all the
laborers may cover before starting the works.
21.0 SUBMISSION OF RETURNS & MAINTENANCE OF RECORDS:
The contractor shall submit the returns under the Contract Labour Act, payment of Bonus Act,
Payment of Gratuity Act etc. and shall have to maintain all up to date records / registers in respect his
EW- 246 PUR-F-006 RFQ-73782
employee as prescribed under various Labour Laws and produce the same as and when demanded by
GSECL‟s or Govt. appropriate authorities.
22.0 Contractor / Agency shall have to issue the contractual appointment letter for a specific period to
their Labour engaged during the contract period each and every instance & should narrated clear out
terms & conditions for the liabilities of the concerned employees.
23.0 As a contractor, the contractor shall be responsible and liable to pay difference in wages, if any,
and / or observe the revised service conditions that may be awarded by the Honorable Industrial
Tribunal effective from the date directed in the award.
24.0 The contractor must be maintaining regular Labour record and should be paying all acquired
benefits to Labour force and contractor should obtain certificates to this effect from HR Officer of
25.0 The contractor will make arrangements at his own cost to insure all men, materials and equipment
employed for this work. The GSECL will to be responsible for any loss or damage either to the
contractor‟s personnel or his equipment.
26.0 Dispute, if any, taking place between the contractor and laborers must be intimated to LWO/DGM,
Gandhinagar TPS, immediately.
27.0 Any casualty will also have to be borne by the contractor for the period the contract continues.
28.0 For ARC/BRC contract, The Contractor shall deposit 15 days salary at the rate of last drawn salary
for every completed one year of services for each worker for the liabilities of Gratuity.
29.0 The Contractor / Agency shall have to produce / submit the copy of Wage Register, Muster Roll,
PF Deposition Challan, PF Schedule, Copy of Bank Statement duly stamped by the concern Bank and
relevant records under various Labour Laws for the contract work to HR Department to ensure
compliance to provisions of various legislations.
30.0 Attendance of contract labourers will be through punching machines for which punching machines
shall installed to facilitate the contractors by GSECL for which monthly charges of Rs. 10/- will be levied
on contractor as administrative charges.
49. MATTERS RELATED TO EXECUTION OF WORK:
a) Work shall commence from the date given in letter to commence the work by EIC at site.
The Contractor shall make all necessary arrangements at site to mobilize labour, operators, divers and
materials and maintain necessary number of machinery and equipment, barge, pontoons etc., to
guarantee the agreed rate of progress of work as per schedule.
b) A detailed work schedule showing how he proposes to carry out the work, specifically
mentioning time periods as well as date of commencement and completion of each activity and such
approved schedules must be strictly adhered to by the CONTRACTOR. After the owner has agreed with
the schedule, the Contractor shall prepare detailed program of each work front/activity breaking it down
giving daily quantifiable/measure of progress. The schedules are to be reviewed periodically with the
OWNER / ENGINEER to ensure that the completion date will be met or to institute corrective steps (at
no extra cost to the ENGINEER) to adhere to the completion dates. The OWNER reserves the right to
revise the schedule at his discretion in order to keep up to the completion date and to suit the project
requirement and such alterations shall not entitle the CONTRACTOR to any extra payment.
c) A work schedule with PERT / Bar Chart for carrying out the work in prescribed time limit
mentioning date of commencement, activity to be carried with its time period, starting & finishing event
for each activity, completion of total project in critical path etc, shall be jointly fixed and approved by
the GSECL. Such approved schedules must be strictly adhered by the Contractor.
d) After the GSECL has agreed with the schedule, the Contractor shall prepare detailed program of each
work front / activity breaking it down to daily quantifiable measure of progress. The schedules are to be
reviewed periodically with the Owner / E.I.C to ensure that the completion date will be met or to institute
corrective steps (at no extra cost to the GSECL) to adhere to the completion dates. The Owner reserves the
right to revise the schedule at his discretion in order to keep up to the completion date and to suit the
project requirement and such alterations shall not entitle the Contractor to any extra payment.
e) The GSECL reserves the right to delete any item of schedule-B for which contractor shall not have any
right to claim on this account.
f) One permanent reference bench mark and a reference base line shall be given for lay out of work,
which shall be maintained without disturbance by the CONTRACTOR during the tenure of the contract.
CONTRACTOR shall establish local bench marks as directed by the ENGINEER IN CHARGE.
g) The contract or any part thereof shall not be subject to change without the written permission of the
Chief Engineer (Gen.) GSECL, GANDHINAGAR TPS or his authorized representatives.
h) During the execution of the work if it is found that the work is not progressing as per the scheduled
program approved by the GSECL & planned by the contractor, due to the reasons attributable to the
contractor, suitable action shall be taken as per Clauses in this tender elsewhere & other relevant clauses
EW- 246 PUR-F-006 RFQ-73782
appearing in the section of “Terms & condition of tender & works contract, Legal conditions of works
contract” of tender document. And the GSECL may also take such action as it may deem fit to ensure that
the work is completed in time at Risk and Cost of the contractor.
i) Contractor shall attend meetings at EIC's office at site or any other place as fixed by the EIC, as and
when required for review, discussion, coordination etc. Attending these meetings shall be obligatory on the
part of the Contractor, at no cost to the GSECL.
j) The Contractor shall take all requisite & necessary care to observe that no damage is caused to the
existing, pumps, existing works, service road, or any other structure etc. For any damage to the existing
structures of the GSECL, the Contractor shall be held responsible and he will have to rectify the damage
immediately up to the satisfaction of Engineer in Charge, at his own cost.
k) The work shall be completed within the period stipulated in the contract. & site clearance arranged
according to the progress of work at site. Therefore, the contractor has to organize & coordinate the work
to suit these circumstantial conditions. In the event of any delay due to the above or due to any other
reason not attributable to the contractor, reasonable extension in completing the work may be given at the
discretion and as decided by the GSECL but no compensation or idle charges will be payable to the
contractor on this account or any site conditions under any circumstances.
l) No idle charges shall be entertained by GSECL for any site condition or any circumstances. The
corporation will not pay any type of advances including mobilization advance.
50. RECOVERIES:
a) In case of any damage to equipment / machinery or structure / building of GSECL or any public
property due to negligence of contractor or any other reasons attributed to contractor, the decision of
E.I.C. regarding the amount of recovery shall be final.
b) If the contractor fails to execute the work as per direction of E.I.C. within the time frame given, the
GSECL shall get the work done through any other contractor at the risk and cost of the contractor and the
cost of execution of such work along with 15% overhead charges shall be deducted from contractor‟s
monthly bill over and above recovery as per rules.
c) Recoveries due from the contractor, up to the end of the month previous to the one in which the bill
is prepared shall be made from bills approved for payment every month or at other periods when the bills
are prepared, for the various items in the following order of priorities and extents.
d) Deduction on account of security deposit in full together with shortage, if any, to be made good.
e) Penalty in full, if levied.
f) Expenditure, if any, incurred by the Corporation on Contractor‟s behalf in labour or materials in full.
g) Charges for services such as water and power supply etc. in full.
h) Charge on account of supply of materials like cement and steel in case of shortages found in balance or
excess consumption than specified.
i) Hire charges for Corporation or Government machinery if any.
j) Recoveries of advance and secured payment or payments for preliminary work in full or the installment
due if and as the same as may have been allowed.
k) Rent recovery on account of allotting quarters on rent as per Corporation‟s rules.
l) Income tax and sales tax in full as per Government rules.
m) Outstanding recoveries in respect of other contracts awarded by the Corporation if any.
n) Other recoveries. (If any)
51. WORK TO BE EXECUTED TO THE SATISFACTION OF THE ENGINEER -IN-CHARGE:
The contractor shall proceed with the work with diligence and expedition and the whole of the
work herein specified as well as the mode of execution shall be under the supervision and
direction and shall be carried on to the entire satisfaction of the Engineer-in-charge, who shall have
full power to order the contractor to alter, enlarge or diminish the form, dimensions, positions, or
quantities of any of the work or to make use of material and workman-ship of different
descriptions and qualities from this herein specified.
The whole of the works, together with any temporary works, associated therewith, shall be carried
on in the most substantial proper and mannered workman like manner, with the best materials and
workmanship and to the entire satisfaction of the Engineer-in-charge and in such order of time as
he may direct. The contractor shall attend to and execute without delay all orders and instruction
which may from time to time be issued by the Engineer-in-charge.
52. MATERIALS WORKMANSHIP etc.:
The work shall be executed in thoroughly substantial manner with material and workmanship of best
quality and strictly in accordance with the specifications and with the drawings, or with such other
drawings or written instruction as may from time to time be furnished to the contractor, in
accordance with terms of this contract and shall be completed in every respect with all materials
and workmanship implied and necessary according to the fair interpretation and meaning of the same
and should there be any discrepancy between the drawings and specifications or any difference or
disputes as to the dimensions to be worked to or the quality of the materials to be used, or the mode
EW- 246 PUR-F-006 RFQ-73782
of doing periodical quantity of the work to be executed or with respect to any subject arising out of
this contract, the decision of the Engineer-in-charge shall be final and binding on all parties. Rejected
material shall be so disposed off as to obviate any possibility of their use on works. The place,
method and period of disposal shall be as directed by the Engineer-in-charge.
53. SAMPLES OF DESCRIPTIVE DATE:
Samples of descriptive date, requiring approval, shall be submitted by contractor to the Engineer-in-
charge in good time before the use of such material for inspection and permission of testing if
required. The samples shall be properly marked to show the name of the material,
manufacture, place of origin, and place where to be used etc. Failure of any sample to pass
specified tests will be sufficient cause for the refusal to consider any further sample from the same
54. FENCING AND LIGHTING AND VENTILATION
Except as herein after provided, the contractor shall unless otherwise specified, be responsible for
the proper fencing, guarding, lighting and taking of the necessary safety measures for all works
comprised in the contract and or the proper provision of temporary roadway, footways, guards
fences, caution notices etc. as far as the same may be rendered necessary by reasons for the work
for the accommodation and protection of workman foot passenger or other traffic and of the
owners and occupiers of adjacent property and of the public and shall remain responsible for
any accidents that may occur on account of his failure to take proper and timely precautions.
All the arrangements made for fencing, lighting and ventilation shall be maintained by the
contractor throughout the tendency of the contract till physical taking over of the work by the
55. LIABILITY FOR DAMAGE TO WORKS OR PLANTS
The contractor shall during, the progress of the work, properly cover up and protect the work,
and plant, and materials placed at his disposal or acquired for him by the Corporation, from
injury by exposure to the weather, or any cause what so ever and shall take every reasonable proper
timely and useful precaution against accident or injury to the same from any cause and shall be and
remain answerable and liable for all accidents, or injuries thereto which until the same be or be
deemed to be, taken over by the Corporation, may arise or be occasioned by the acts or omissions of
the contractor or his workmen of sub-contractors, and all losses and damages to the works or
such plant or material arising from such accidents or injuries as aforesaid shall be made good in the
most complete and substantial manner by and at the sole cost of the contractor and to the reasonable
satisfaction of the Engineer-in-charge. If the contractor fails to make good such losses & damages
within the time given by the Engineer-in-charge, the Corporation shall be at liberty to recover the
amount fixed by the Engineer-in-charge for such losses or damages or any part thereof by deducting it
from any sum due by the Corporation to the contractor under this contract or otherwise.
Further the contractor shall, at all time, protect and preserve all materials, plant and equipment
that he may himself have procured for the execution of the work. All reasonable requests of the
Engineer-in-charge to enclose or especially protect any of the above shall be expeditiously compiled
If the Engineer-in-charge considers that the work or materials or plant is not sufficiently
protected by the contractor, he shall be entitled to arrange for such protection at his unfettered
discretion and recover the cost thereof from the contractor.
Until the work shall be or be deemed to be taken, over as aforesaid, the contractor shall also
be liable for and shall be deemed to have indemnified the Corporation in respect of all damage or
injury to any person or any property of the Corporation or of others, occasioned by the negligence of
the contractor or his workmen, or his sub-contractor, or by defective design, work or materials.
56. EXPLOSIVE PROCUREMENT AND STORAGE (IF APPLICABLE)
i) Explosives, petrol, oils, fuels and other inflammable materials shall be stored strictly in accordance
with the rule of the Explosive Department.
ii) The contractor shall at his own expense construct and maintain, proper magazines which are required for
the storage of explosive and arrange for proper storage facilities for oils, fuels etc. for use in connection
iii) The contractor shall at his own expense obtain such license or licenses as may be necessary for strong
and using explosives, oils, fuels etc. The department shall not take any responsibility whatsoever in
connection with the storage or use of explosives on the site, or any accident or occurrence whatsoever
in connection therewith. All operation of the contractor in which or for which Explosives are employed
shall be at risk of contractor and upon his own responsibility.
EW- 246 PUR-F-006 RFQ-73782
57. MATERIALS TOOLS AND PLANT BROUGHT ON THE SITE OF WORK
All materials, tools and tackle of the contractor brought to and delivered upon the site for the
purpose of the work shall from the time of their being so brought shall be deemed to be the
property of the Corporation in its possession to be used for the purpose of the work and for that
purpose only and shall not on any account be removed or taken away by the contractor or any
other person without the written permission of the Engineer-in-charge but the contractor shall
nevertheless be solely liable and responsible for and loss destruction thereof or damage thereto.
The Corporation shall have a lien on such materials, tools and tackle for any sum of sums which may
at any time prior to the completion of the works be due or owing to the Corporation by the
contractor, under in respect of and dispose of any such materials, tools and tackle in such manner as
the Corporation may think fit and to apply the proceeding in or towards the satisfaction of such sum
or sums so due or owing as aforesaid but subject to such lien and power of sale and disposal such
surplus materials, tools and tackle shall belong to the contractor and may be removed and disposed
off by him as he may think fit.
58. ACCESS TO SITE AND WORK ON SITE
The Engineer-in-charge or his authorized representative may if he consider fit from time to time enter
upon any lands which may be in the possession of the contractor under this contract, for the
purpose of executing any work not included in this contract and may execute such work not
included in this contract by agents, or by other contractors at his option and the contractor shall in
accordance with the requirements of the Engineer-in-charge, afford all reasonable facilities for
execution of the works including occupation of lands by structure or otherwise for any other
contractor employed by the Corporation and his workmen or for the workmen of the Corporation
who may be employed in the execution on or near the site of the work not included in the
contractor‟s any contract in connection with or ancillary to the works and in default, the contractor
shall be liable to the Corporation for any delay or expense incurred by reason of such default.
Provided always that if the exercise of those power shall cause any damage to the contractor he may
within fifteen days of such damage arising make a statement of the same to the Engineer-in-charge
who shall from time to time assess the value in his Judgment of such damage and the Corporation
shall from time to time shall pay to the contractor the amounts (if any accepted as justified) by the
Engineer-in-charge. The contractor shall not however, on account of any such modified, new or extra
work executed by or for the same of the Corporation be entitled to claim relief from the obligation to
execute other works.
59. INSPECTION OF WORKS
The Engineer-in-charge or his duly authorized agent shall have at all time full power to inspect the
works, wherever in progress, either on the site, on the contractor's premises or at the premises
wherever situated, of any firm or Corporation where work in connection with this contract may be in
Further, the contractor shall not allow, without written authorization permit entry on site of work,
any person except authorized agents of the Corporation of the Engineer-in-charge or the contractor's
staff and labour directly engaged on and in connection with the work.
The contractor shall, during working hours, maintain supervisors having sufficient training and
experience to supervise the various items and operations of the work and the said supervisors shall
remain present during the inspections of the Engineer-in-charge. All orders and directions given to
such supervisors or other staff of the contractor shall be deemed to have been given to contractor.
Further the Engineer-in-charge may be due notice, desire a higher ranking members of the
supervisory staff of the contractor to be present on any specified inspection and the contractor shall
comply with such direction.
60. CLEANING UP
The contractor shall at all times keep the construction area and his power house and storage areas free
from accumulation of waste, or rejected materials.
Prior to the completion of the work the contractor shall remove all rubbish from and about the
premises, and all tools, scaffolding, equipment and materials which are not part of permanent
structure. The premise will be left in a manner fully satisfactory to the Engineer-in-charge, thereafter
only the completion certificate will be issued.
61. CONTRACTOR TO KEEP INVENTORY OF MATERIALS etc.
EW- 246 PUR-F-006 RFQ-73782
The contractor shall prepare and maintain an inventory of all materials temporary rolling stock, plant
purchased or hired for use of employment or for any of the purposed for this contract and such
inventory or a copy thereof shall at all times be available for inspection by the Engineer-in-charge. A
complete and up to date copy of the inventory shall be submitted to the Engineer-in-charge in the
beginning and once a year; thereafter changes in the interim period, if any shall be communicated on
every three months.
62. CONTRACTOR TO RESTORE PLANT
Upon completion of the work, the contractor shall deliver to the Corporation, all appliances, materials,
and plants which may have been loaned or hired to him by the Corporation and make good all
damages which may have occurred to them, except such as shall be caused by fair wear and tear
in execution of the works.
63. PROGRESS SCHEDULE
i) The contractor shall furnish, within one week unless extended by the Engineer of the order to start
the work, a progress schedule in quadruplicate indicating the date of start the weekly progress
expected to be achieved and the anticipated completion date of each major items of work to be done
by him, also indicating dates of procurement and setting up of materials, plant and machinery. The
schedule should be such as is practicable of achievement towards completion of the whole work in
the time limit and of the particular items on due dates specified in the contract and shall have the
approval of the Engineer. Further, the dates for the progress as in this schedule shall be kept up-to-
date. In case it is subsequently found necessary to alter this schedule, the contractor shall submit in
good time a revised schedule incorporating necessary modifications proposed and get the same
approved by the Engineer. No revised schedule shall be operative within such acceptance in writing.
Detailed schedules for each week showing the progress proposed to achieve shall be submitted to
the Engineer and got approved. The Engineer is further empowered to ask for more detailed
schedule or schedules any week by week, for any items or items, and the contractor shall supply the
same as and when asked for.
ii) The Engineer shall have, at all times the right without in any way vitiating this contract, or forming
grounds for any claim to alter the order of the works or any part thereof and the contractor shall
after receiving such direction proceed in the order directed. The contractors shall also revise the
progress schedule accordingly and submit four copies of the revised schedule to the Engineer within
seven days of the Engineer's direction to alter the order of works.
iii) The contractor shall furnish sufficient plant equipment and labour and shall work such hours and shifts
as may be necessary to maintain the progress on the work as per the approved progress schedule.
The working and shift hours shall comply with all GSECL's regulations in force and shall be such as
may be approved by the Engineer. They shall not be varied without the prior approval of the
iv)The contractor shall from time to time as may be required by the Engineer, furnish the Engineer, with a
statement in writing of the arrangement he proposes to adopt for the execution of this contract and
the Engineer may if he considers, necessary at any time advise alteration in the same, which the
contractor shall adopt on notice thereof.
v) The progress schedules shall be in the form of progress charts, forms, statement and/or reports as
may be approved by the Engineer. Further, the contractor shall submit four copies showing the
progress of work in forms and charts etc. at periodicals intervals as may be specified by the Engineer.
64. DATE OF COMPLETION
The contractor shall supply, erect, equip and construct the whole of the works and hand over them to
the Corporation on or before the date specified in the tender document including "Special
Conditions" and save as herein provided, in no circumstances whatever shall extend or alter the
date for the completion of works. Provided always that if in the opinion of the Engineer-in-charge
the completion of the works shall be delayed by any change of original design or by the order
of the Engineer-in-charge, of any altered, modified substituted or additional works or materials
omitted or by strikes, lock outs or stoppages of labour, or revolution, riots, civil or political
disturbance or by causes directly due to war or by the contractor not being given possession of the
site or any part there-of or by the Corporation taking possession of and using the site or any part
thereof or the works or any part thereof, whether any nonperformance of work under the powers
herein contained or otherwise or by any nonperformance of work or non-supply of materials to be
performed or supplied by the Corporation or by the contractor not receiving any orders,
drawings, instructions or directions in time or by the suspensions of the works or by fire, flood
EW- 246 PUR-F-006 RFQ-73782
exceptionally bad weather tempest, storm, or by from unforeseen circumstances (and whether
the same shall be due to any act or omission of the Corporation or its agents or those in their
respective service or not) the Engineer-in-charge may, if in his unfettered discretion, he thinks fit
either forthwith or at any later time and from time to time not withstanding that the prescribed
or extended time for completion has expired or that the work have been completed, by writing
under his hand, extend the time for the completion of the works to such date as he shall appoint.
Provided always that unless the contractor makes a written application to the Engineer-in-charge
within one month of the cause of delay and unless the time is extended by the Engineer-in-charge,
the prescribed time shall not be extended notwithstanding delays from the aforesaid foregoing or
any other causes of whatsoever kind.
65. SUBLETTING OF CONTRACT
There will be generally no objection on the component parts for the work, being given over to responsible
sub-contractors but Corporation shall under no circumstances recognize these sub-
contractors and the responsibility of executing the work in the accordance with the conditions
of contract will entirely rest on the main contracts. The main contractors will therefore always have
the very responsible member, preferably a technical hand present on the works with power to
sign all work orders issued on the site of work and to take requisite actions in the interest of
very efficient execution of work. However, the subletting of the contract can be made only with the
prior approval of the competent authority of the Corporation.
66. OTHERCONTRACTS FOR THE WORK SUSPENSION STOPPAGEOR CURTAILMENTS OF
If during the tendency of the contract the Engineer-in-charge shall for any reasons (which shall
be unquestioned) whatsoever require the whole or any part of the work as specified in the
contract to be suspended for any period or shall not require the whole or any part of the work
as specified in the contract to be carried out at all by the contractor, he shall give notice in writing
of the fact to the contractor who shall thereupon suspend or stop the work totally or partially as
the case may be. In any, case, except as provided hereunder, the contractor shall have no claim
to any payment or compensation whatsoever on account of any profit or advantage which he might
have derived from the execution of the work in full but which he did not so derive in consequence
of the full amount of the work not having being carried out, or on account of any loss that he may
be put to on account of materials purchased or agreed to be purchased or for unemployment of
labour recruited by him. He shall not also have any claim for compensation by reason of any
alterations having been made in the original specifications, drawings, designs and instruction which
may involve any curtailment of the work as originally contemplated. Where, however, materials
have already been purchased or agreed to be purchased by the contractor, before receipt by
him of the aforesaid notice, the contractor shall be paid for such materials at the rate determined
by the Engineer-in-charge, provided they would have been useful for the work curtailed or
stopped are not in excess of requirements, are of approved quality and cannot be used on other
contract works or otherwise by the contractor and/or shall be compensated for the loss if any, that
he may be put to, in respect of materials agreed to be purchased by him, the amount of such
compensation to be determined by the Engineer-in-charge, whose decision shall be final.
The Engineer-in-charge may grant extension of time for the execution of any item or items of work
affected by such suspension of work. The decision for the Engineer-in-charge, regarding the granting
of extension and the period thereof shall be final. The Engineer-in-charge may order the contractor to
suspend any work on account of bad weather; rain or storm and such other adverse climate
conditions and the contractor shall comply with the same.
The contractor shall not be entitled to an compensation for such suspension of work, concrete lining at the
junctions of the different works under different contract shall be done with particular care regarding
forms, construction joints, interconnecting reinforcement etc. If any and the joint planning of
such work shall be with prior approval of the Engineer-in-charge.
67. OTHER CONTRACTORS
Apart from this work, the other works connected with the power house will be simultaneous going on
either departmentally or through agencies inside or outside the power house. Each contractor or
agency shall co-operate with others to the fullest extent and shall allow to each other every
facility and co-ordination for execution of their works simultaneously and satisfactorily, during their
action of machinery or execution of any other co-ordination works of the power house, the
EW- 246 PUR-F-006 RFQ-73782
contractor will have to work only at places as directed by the Engineer-in-charge. He will have
some time to suspend his work partially or totally in the interest of the work at large.
In such cases and at such time, he will be informed from time to time and directed by the Engineer-in-
charge where to work. He may also be required to remove the scaffolding or to erect the scaffolding
and shuttering in such a manner as to be of little obstruction and inconvenience for erection of
machinery. In such cases he shall not be given any compensation on account of reduction or
stoppage or labour force or removal and reinstatement of scaffolding shuttering etc. It will be seen
that contractor is not put to unnecessary inconvenience.
In the matter of dumps, haul, roads, drainage, diversion and the like, each contractor shall take into
consideration the needs and requirements of the other constructors, if any working in the vicinity.
Further no contractor shall take or cause to be taken any stops or action that may cause
disruption, discontent or disturbance to the work, labour of arrangements etc. or other
contractors in the neighboring project localities.
Any action, by any contractor, which the Engineer-in-charge in his unquestioned discretion may consider as
infringement of the above code, would be considered as a breach of the contract conditions and the
Engineer-in-charge may take such action as he may deem fit against the contractor and the action
taken shall be considered as final and binding.
68. SPEED OF WORK
The contractor shall at all times maintain the speed of work to confirm to the latest operative progress
schedule but the Engineer-in-charge may at any time with sufficient notice in writing direct the
contractor to slow down any part or the whole of the work for any reason (which shall not be
question whatsoever, and the contractor shall comply with such orders of the Engineer-in-charge.
The compliance of such orders shall not entitle the contractor to any claim or compensation.
69. CONTRACT DOCUMENT AND MATTERS TO BE TREATED AS CONFIDENTIAL
All documents, correspondence, decisions and other matter concerning the contract shall be considered as
of confident and restricted nature by the contractor and he shall not divulge or allow access there to
any unauthorized persons of any kind.
70. ACCESS TO THE CONTRACTOR'S BOOK
Whenever it is considered necessary by the Engineer-in-charge to ascertain the actual cost for
execution of any particular item of work of supply of plant or material shall direct the contractor to
produce the relevant documents such as pay rolls records of personnel, invoices of materials
and any other data relevant to the item or necessary to determine its cost etc. and the contractor
to the aforesaid items in the mode and manner that may be specified.
71. INTEREST ON MONEY DUE TO THE CONTRACTOR
The contractors shall not be entitled to get interest on any amount either of their bills or arrears
whatsoever because of delay in payment by the Corporation. Similarly they shall not be entitled for
any interest on amount of bank guarantees given by them. Non-payment of interest by the
Corporation therefore, shall not cause breach of contract.
72. MEASUREMENTS TO BE PROVISIONAL AND SUBJECT TO CORRECTION
Every measurements for running payment on account of work, done or supplies made, shall be
subject to adjustment or final measurements. In case of disagreement between such intermediate
and final measurements, the latter shall prevail. All works shall be measured, met by standard
measure and according to rules and custom and usual in the use in Gujarat State Electricity
Corporation Ltd., and no proposal to adopt alternative method will be accepted, the Executive
Engineer‟s decision as to what is “the usual method in use in the Gujarat State Electricity Corporation
Ltd.” shall be final.
73. BREACH ON PART OF CORPORATION NOT TO ANNUAL CONTRACT
No breach or non-observance on the part of the Corporation of any of the agreements contained
herein, shall annul this contract or discharge the contractor from the observance and performance
thereof, or of any part thereof, but on application by the contractor and in the unfettered
discretion of the Engineer-in-charge an extension of time may be given to the contractor in
respect of such breach or non-observance by the Corporation.
74. PROFORMA RETURNS
The contractor shall maintain Performa, charts and details regarding machinery equipment materials,
labour personnel and other matters as may be specified by the Engineer-in-charge. He shall
further, submit returns of Performa and details as may be specified by the Engineer-in-charge
from time to time.
EW- 246 PUR-F-006 RFQ-73782
All local laws in force at the time of entering into the contract and those enacted thereafter shall be
binding on the contractor and he shall abide by the same.
All import duties, sales tax and other local taxes shall be borne by the contractor and they shall
be deemed to have been covered by this quoted tender rate
76. WORKS IN SHIFT DUTY
Works shall be planned in shift duties, if possible in three shifts, depending on emergency of the work with
prior approval of Eng. - in- charge. 0n Sunday or any other holidays work shall be continued in order to
maintain progress with prior permission of Eng.-in -charge. Such works shall not form any grounds for
complaint, compensation or extension of time limit.
If on the other hand, the Engineer-in-charge directs that the work shall be proceeded with on days and
during hours which are not permissible under this contract, the contractor shall proceed with the work as
directed without in any way vitiating this contract or forming any grounds for compensation of claim.
The contractor shall in his dealing with labour, atall times, during the period of this contract, have due regard to
local festivals and religious and other customs.
A working day shall consist of two shifts each of eight hours, a working day shall constitute any day on which in
the opinion of the Engineer-in-charge, work can be carried out in one or more shifts.
Final payment to the contractor shall not be made until the contractor shall deliver to the purchaser or receipts
in full in lieu thereof, and in either case, an affidavit that so far he has knowledge or information the releases
and receipts include all the labour and material for which in lien could be filed. If any lien remains unsatisfied
after all payments are made, the contractor shall refund to the purchaser all moneys that the latter may be
compelled to pay in discharging such a lien, including all costs and a reasonable attorney's.
78. MISCELLANEOUS:
1. In case of conflict / discrepancies among clauses of different specifications given in this document, the
stringent specification shall be followed and under such circumstances, the decision of the EIC shall be final and
binding to the Contractor
2. The Notice inviting tender, general instruction to bidders and all other documents of this tender shall form part
of the contract
3. No receipt for any payment alleged to have been made by a Contractor in regard to any matter relating to tender
of the contract shall be valid and binding on the Corporation unless it is signed by the Engineer-in-Charge.
4. As per provisions of Income Tax Act, Corporation shall deduct Income Tax at the applicable rate.
5. Agency has to note that the extension of Time limit/excess saving in the works if required to approve, than it shall
be processed as per the provision of DoP and will take time for process the same.
6. The contract is inclusive of the cost of materials required to complete the work in totality.
7. It will be absolutely incumbent on the contractors to have on the site of work only such of the
materials as have been duly passed by the Engineer-in-charge. Materials that have been rejected must on no
account be allowed to remain on the site, and in spite of written order to do so, any such rejected materials is
on the site beyond a period of 48 hours‟ notice, the Engineer-in-charge shall have the right to remove it, at the
risk and cost of the contractors and even to destroy it.
8. It must be distinctly understood that conditions of contract and of claims in respect of extra work,
will not be allowed unless the works to which they relate is clearly without the spirit and meaning of the
specifications or unless such works are ordered in writing by the Engineer-in-charge and claimed for in specified
9. Contractor will be asked to present the sample of materials, and the approved samples will be
preserved at the site of work, and no change in the approved sample will be allowed, without the written
permission of the Engineer-in-charge.
10. The department reserves the right to make any change in the design and the plans of the works. The
contractor shall be bound to carry them out at the rates tendered. No claim or compensation will be allowed on
11. The contractor shall keep instruction book on site, for taking site instructions from time to time. This
book shall be made available on site whenever asked for.
12. Above construction equipment brought to site shall be allowed to be taken out only after the work for
which it has been brought is over. The equipment shall be taken out only with the specific permission in writing
from the E.I.C. Only the equipment required for the work and in fit condition shall be brought to the site. The
Contractor shall ensure that proper documentation is followed at entry gate of GSECL's premises for such items
which shall be carried back by Contractor after completion of work.
13. The Contractor shall provide all temporary ladders, scaffolding materials, platforms, supports and
other necessary facilities required for trimming & cutting of trees. The Contractor shall provide sufficient, strong
and safe staging so as to ensure safety of the laborers.
14. The Contractor shall provide sufficient fencing, notice Corporations and lights to protect and warn
others as may be considered necessary by the GSECL and safety authority.
EW- 246 PUR-F-006 RFQ-73782
15. The GSECL may during the progress of work, order the removal of part or whole of the work
executed, found not in accordance with the approved drawings, specifications/ instructions. No extra claims
shall be entertained for re-executing or altering of such work.
16. On completion of the work, the site shall be left in good order and the excess materials, scraps,
debris, if any shall be removed and dumped by the Contractor at place/places as designated by the GSECL. The
Contractor shall also dismantle and remove the staging and other temporary facilities like stores, offices, labor
camp etc. on completion of work.
17. Contractor is required to maintain proper records at site of work in addition to normal routine
requirement of own office. The records to be maintained shall include but not limited to the following:
(a) Daily Progress Record.
(b) Work Site Order Book.
(c) Instruction by GSECL's Officers.
(d) Test Registers of other materials/fittings, fixtures, equipment as stipulated in the tender.
(e) Register for Working Details.
(f) Log Book of Defects.
(g) Hindrance Register giving details of commencement and removal of each hindrance.
(h) Supply and consumption registers of all materials shall be maintained.
(i) Day to day Record of used/received materials shall be entered in the register and signed by the
Site Engineer of the GSECL as well as contractors' representative at site.
(j) Measurement Book.
77. SALES TAX ON WORK CONTRACT
The Gujarat Government by its amendment to the Gujarat sales tax act has also made works contract subject to
Sales Tax. However works contract tax shall be liability of the contractor and shall be born by the contractor.
More ever you shall also have to submit form No 702 as prescribed by Gujarat Sales Tax act while submitting
More ever the purchaser will not pay any composite tax/turnover tax/works contract tax which contractor has to
pay as per act. Hence the incidence of sales tax or such type of taxes shall not be payable by the purchaser in
any case even if such taxes are levied on the party/contractor at a future date.
Chief Engineer (Gen)
Signature Of Contractor GSECL: GTPS
EW- 246 PUR-F-006 RFQ-73782
TERMS AND CONTRACT FOR WORKS
GENERAL SAFETY RULES
LIST OF SAFETY TOOLS
EW- 246 PUR-F-006 RFQ-73782
TENDER & CONTRACT FOR WORKS
I/We hereby tender for the Gujarat State Electricity Corporation Ltd. (herein Referred as “Corporation”)
of the work specified in the underwritten memorandum within the time specified in Schedule B
(memorandum showing items of work to be carried out) and in accordance, in all respect, with the
specifications, design, drawings and instructions in writing and as per annexed conditions of contract
and agree that when the materials for works are provided by the Corporation, such materials and rates
to be paid for them shall be as provided in Schedule A hereto.
(a) General description of work :“ Providing and Fixing of tap connection in bathroom of C-
type quarter from direct water supply and Misc. Civil Work ( As and when required ) at
(b) Estimated cost : Rs 385319.01 /-
(c) Earnest money (3%) : Rs. 11,560/-
(d) Security deposit (5%) : As per cl no.7 of Section C (i.e General condition of contract).
(e) Time allowed for the completion of work from date of written order to commence.:
Should this tender be accepted, I/We hereby agree to abide by and fulfill all the terms and provision of
the conditions of contract annexed hereto as applicable and in default thereof forfeit and pay to the
Corporation, the sums of money mentioned in the said conditions.
Receipt No. Date from the Gujarat State Electricity Corporation Ltd. in respect of the sum of
Rs____________________________________. (The amount to be specified in figures and
words) is herewith forwarded representing the earnest money (the full value of which is to be
absolutely forfeited to the Corporation, should I/We not deposit the full amount of security deposit
specified in above memorandum in accordance with clause (d). Security Deposit of the said
conditions/otherwise the said sum of Rs…………………. shall be refunded on surrendering the original
receipt, in case of non-awardance of contract.
Signature of the Contractor:
Address of the Contractor:
Signature of Witness:
Address of the Witness:
The above tender is hereby accepted by me on behalf of the Gujarat State Electricity Corporation Ltd.
For & On behalf of GSECL
Chief Engineer (Gen)
GSECL GANDHINAGAR TPS
his duly authorized Assistant
EW- 246 PUR-F-006 RFQ-73782
General Safety Rules & List of Safety Tools.
“GENERAL SAFETY RULES / NORMS” TO BE OBSERVED BY THE CONTRACTORS
All the contractors working in Gujarat State Electricity Corporation Limited Factory like
Coal/Lignite/Gas/Hydro/Pumping Station shall have to strictly observe the following Safety Rules.
Concern principle contractors are responsible for informing & observance of these rules by their
supervisors/contract workers as well as the owner/supervisors/ workers of sub-Contractors engaged, if any, by
them for the work contract awarded to them. Prior to commencement of the work, Contractor shall have to
submit a written assurance on their letterhead to the concerned Sectional Head / Engineer-in-charge that they
have thoroughly gone through these Rules, have educated their employees / workers of their sub contractor
and will strictly observe the said Rules while execution of work under work contract awarded to them. They will
have to indemnify the company for any loss or damage / accident / injury to the company‟s property / employee
or employee of their own in default of non - observing these rules.
(01) Co ntra ct or sh o ul d is su e ph oto ga te pa ss f o r the ir wo r ker s f ro m G S E CL Fa cto r y Ma na ge r
a s per G u ja ra t Fa cto ri e s r ule s, 1 96 3 & deta ils sha ll be fi lle d u p i n G SE C L ga te pa ss
fo rma t a s pe r Aa d ha r ca rd / E le ct io n ca r d i d pr o o f & to fo ll ow t he ga te pa ss is s ue
pro ce d ure t h ro ug h concern department EE & SE, Security Officer, LWO/IRO/DGM, Factory Medical
Officer, Safety Officer/Dy. Safety Officer & Factory Manager.
(02) In case of emergency, temporary photo gate pass shall be issued by Security Officer only for three days
with prior permission of Factory Manager only. More than three days, Permanent photo gate pass
procedure shall be completed by contract agency for their contract workers.
(03) Certificate of Fitness of employment in hazardous process & operations in form no.33 of Gujarat Factories
rules, 1963 shall be issued by GSECL Factory Medical Officer for all contractor workers before
commencement of work & examination responsibility shall be taken by contractor as well as concerned
Head of Department .Pre-employment & Periodical medical examination of contractor workers shall be
carried out in form no.32 from GSECL Factory Medical Officer after every six (06) months of contractor
with their contractor workers. Contractor shall be fulfilled all health requirements before commencement of
work. After completion of medical examination in form no.32/33, GSECL Factory Medical Officer shall be
signed in contract worker gate pass procedure format.
(04) Contract worker gate pass will issue after completion of safety induction 3D animation movie & Training
record is to be maintained in IMS/OHSAS training format by TK Office/LWO.
(05) As per Gate pass format of GSECL, Safety Officer/Dy. Safety Officer shall be checked the issue PPE to
contract workers as per nature of job, Form no.10 of lifting tools and tackles, Driving license, Electrical
contractor license, Electrical trade qualifications, Safety induction training, SOP, supervisor qualifications
etc. After fulfillment of all Safety compliances, Safety Officer/Dy. Safety Officer shall be signed in Contract
worker Gate pass procedure format.
(06) Work Contract shall be completed by principle contractor/agency/person who is awarded the work order.
Subletting of contract shall be allowed only if prior approval of Power station chief before execution of
work. Contractor/agency shall be submitted the entire subletting contract documents with gate pass
application through concern department EE & SE, LWO/DGM, Safety Officer/Dy.Safety Officer & Factory
(07) Under The Conditions Framed Under Rule-45 Of The Indian Electricity Rules, 1956, Valid
Electrical contractor License shall be submitted to concern electrical department EE/SE/Electrical Safety
Officer/ Safety Officer/Factory Manager at the time of apply gate pass by agency/party with latest renewal
from Chief Electrical Inspector, Gandhinagar- Gujarat. Electrical License photocopy shall be checked by
Concerned HOD of Electrical Department/Electrical Safety Officer/Dy.Safety Officer/ Safety Officer/Factory
(08) As p er na t ur e o f j ob/ w or k , qualified supervisor (Diploma (Electrical/ Mechanical/Civil/C&I) + 3 years
experiences or ITI + 10 years) shall be engaged by contract agency & qualification certificate with
experience certificate shall be submitted to concern EE/SE/LWO/IRO/DGM/ Dy.Safety Officer /Safety
Officer/Factory Manager at the time of apply gate pass.
(09) As per rule 3 of CEA regulation ,2010: Designating person(s) to operate and carry out the work on
electrical lines and Apparatus, Contract person/worker possesses a certificate of competency or
electrical work permit, issued by the Appropriate Government. That means, Electrical trade Qualification of
contract worker/person like ITI-wireman/ Electrician, Diploma (Elect), BE/B. TECH (Elect), ME/ M. TECH
(Elect) shall be submitted to concern EE/SE/LWO/IRO/DGM, Dy.Safety Officer/ Safety Officer/Factory
Manager at the time of apply for photo gate pass procedure.
(10) As per nature of job/work & during capital overhauling work /Annual overhauling work /24X7 round the
clock work/major shut down work, Qualified Safety Officer/Manager/Supervisor (BE/Diploma
(Elect/Mech/Civil) + PDIS-Post Diploma in Industrial Safety) shall be engaged by contractor during
dangerous operations/dangerous works as well as day to day dangerous activities, safety supervision, tool
box talk, Safety awareness programme, SOP preparation with hazards & its control measures with each
EW- 246 PUR-F-006 RFQ-73782
step , checking of lifting tools & tackles, hydra mobile crane, Safety precautions, coordination with Safety
Department etc.
(11) License of driver shall be submitted with gate pass issue application as per nature of vehicles & to follow
the Motor vehicle Act,1988, the Central Motor Vehicles (Amendment) Rules,2016 as well as Gujarat Motor
Vehicles rules,1989 & driver license shall be checked every day by security shift in charge before entry in
the Factory premises.
(12) SOP with JSA (Job Safety Analysis) shall be prepared by contractor through competent person as per GFR,
1963 or Qualified Safety Officer as per GFR, 1963 with 05 years experiences. SOP will review & approve by
concern JE/DE/EE/SE/Elect. Safety Officer/Dy. Safety Officer /Safety Officer/Factory Manager before
execution of work.
(13) It is compulsory to use standard make Personal Protective Equipments (P.P.Es.) as per the job
requirement. Do not work without use of required P.P.Es. Contractor is responsible to provide standard
make (ISI/DGMS/CE/EN/ANSI approved) & to checked standard/make in PPE issue format by concern
JE/DE/EE/SE/Safety Officer/Factory Manager. Personal Protective Equipments / Safety Gadgets suitable to
give sufficient protection against hazards involved in their work / job to their staff, as per the job
requirement and insist / enforce their workers to put on the same while at works.
The ongoing work is liable to be stopped at any time if your contract workers/staffs found working without
P.P.Es. Following is the list of various P.P.Es (as per ISI/DGMS/CE/ EN/ ANSI approved only) to be used for
various works / worksites.
In any work, Contractor shall be issued the minimum 05 nos. of PPEs like Safety Shoes, Safety Helmet,
Safety goggles, Mask & Reusable Ear plug to their workers/supervisor compulsory & it will check by
concern section HOD & Dy.Safety Officer /Safety Officer at the time of gate pass procedure.
Industrial Safety Helmet For protection of head against falling objects or during fall of person from
height. Yellow Colour helmet is used for contract worker with agency
Safety Goggles/welding For protection of eyes against flying particles / dust, chemical splash, welding
goggles/chemical splash goggles spark, arc, flashover etc.
Full Face shield For protection of face against flying particles / dust, chemical splash, spark,
arc, flashover etc.
Reusable Earplug / Ear muffs. For ear / hearing system protection while working in high noise level area.
Chemical suit/Gas tight suit /Fire For body protection against chemicals, oils, sharp edged objects, heat, hot
proximity suit/FR Boiler Suit objects etc.
Safety Hand Gloves For protection of hands against chemicals, oils, sharp edged objects, heat, hot
metals/objects, electricity etc.
Safety shoes/ Gum Boots with For protection of leg/feet against falling objects, sharp edged objects, heat,
Oil/Chemical/water/heat/ Electrical hot metals/objects, electricity etc..
resistance etc.
Safety Belt(full body hardness with For fall prevention while working at heights or in depth, working in vessel or
double lanyard & shock absorber) / in confined space.
Rope / Life line / Fall arrestor etc.
Dust Mask/Respirator with valve(FFP2) Protection of respiratory system against dust.
Chemical Cartridge Respirator with full Protection against toxic chemical fumes / gases/vapors/dust etc.
face mask type A2B2E2K2
Trolley mounted Air line respirators Working in oxygen deficient zone or confine space area
with full face mask
Portable Single gas detector like Working in hazardous storage/process area
Chlorine, Ammonia, Hydrogen, etc
Portable Multi gas Detector ( Working in oxygen deficient zone & use in entry of confine space & Major fire
LEL,O2,CO,H2S,SO2, etc)
Automatic voltage detector To check the present voltage or induction voltage of electrical equipments/
bus/switch gears from 01 (one) feet distance before starting the any
electrical work .
Auto darkening welding helmet (EN 379 The new auto darkening welding helmet combines legendary Speed glass
& EN 175 Level-B) with PAPR as per EN quality and auto darkening technology with an innovative wide-view grinding
12941:1998, class TH2 and AS/NZS visor to give welders an all-in-one solution for more flexibility, precision, and
1716 efficiency.
Respiratory System is a combined face and breathing protection device, for
increased comfort and safety in welding. The unit is equipped with a particle
filter which removes particles from the air. The unit provides a constant
airflow independent of filter combinations and clogging. The unit can also be
equipped with a gas filter (for example A1B1E1). The unit supplies air to the
head top via the connecting breathing tube. The airflow creates a slight
positive pressure which together with the sealing to the face prevents
particles and other contaminants from entering the head top.
(14) All PPEs (as per ISI/DGMS/CE/EN/ANSI approved only) Should issued by party/agency/contractor to their
contractor workers as per nature of job and allotment of PPE list shall be submitted to Safety Officer,
EW- 246 PUR-F-006 RFQ-73782
Dhuvaran on his letter head as per below mentioned format by Contractor before commencement of work
through concerned JE,DE,EE/SE .
Sub: Issue of PEE to Contractor workers
Sub of work Order:
Name of Agency:
Date of Commencement:
Time limit for work order:
Sr. Name of Designa Name of Name of PPE IS Make Qty Unit Date Receiving
no. workers tion Section under :Code of PPE of signature
work no. of issue
01 Safety Helmet Nos
Safety goggles Nos
Reusable Ear Plug Pair
Safety Shoes Pair
(15) Shift Security Inspector/Security Officer shall be checked Safety Shoes & Safety Helmet of all contractor
workers at entry gate of Factory Premises & shall entered contractor workers with Safety Shoes & Safety
Helmet with photo ID Gate Pass.
(16) Shift Security Inspector/Security Officer shall be checked validity of Gate pass of all contractor workers
on daily basis.
(17) During the work execution, one trained & competent supervisor of agency should always remain present
at work site. Concern JE/DE of GSECL shall be supervised the contract work as per SOP .
(18) Approved NABL laboratory calibration certificates of electrical/mechanical/Civil/C&I/Environment
survey/Chemical etc measuring /testing equipments/instruments which are used during contract work
shall be submitted before starting the work & shall be checked by concern JE/DE/EE before starting work
& it‟s record shall be maintained in concern section.
(19) The contractor shall take all the required safety measures prior to commencement of work on dangerous
substances, machineries or area at which cautionary notice is displayed and obtain “Line Clear” or “Work
Permit” through the concern Department / Section JE/DE and shall be informed to concern section JE/DE
for closed/ returned after completion of work.
(20) Safety talk/Safety work instructions shall be given to contractor workers by concern JE/DE regarding
hazards of specific work, risk & it‟s control measure (mentioned in HIRA) before starting the job work
and records shall be maintained for each & every job works.
(21) Display Safety instructions shall be strictly followed by all workers who are working in factory premises.
(22) Material Safety Data Sheet (MSDS) of each chemical shall be available with Chief Chemist/Control room
& work related Chemical information shall be taken by contractor & contractor workers from Concern
EE/Chief Chemist before starting of chemical handling work.
(23) The contractor shall be checked & securely covered or securely fenced any opened fixed vessel, sump,
tank, pit or opening in ground or in floor which, by reason of its depth, situation, construction or
contents ,is or may be a source of danger before starting the work each & every days or after
interval/recess. Contractor supervisor shall be informed to concerned HOD regarding any unsafe
(24) Prohibition of smoking, fires, lights, spontaneous ignition substance, matches; fuses, mobile phone etc
are to be strictly followed by all workers who are working in factory premises.
(25) Prior to carrying out welding, gas cutting, furnace heating or any other hot work job, remove all the
inflammable material lying at or nearby worksite or cover it properly by suitable protective covering.
Also, special care shall be taken before carrying out such job & see that all possible contributing factors
to set fire shall be removed / vanished prior to commencement of the work. Advance intimation shall be
given to concerned section / fire section to commence the work in fire prone areas. They should also
keep ready all the First Aid Fire Extinguishers / equipments & fire extinguishing media / material like
sand / water buckets or other appropriate equipment at such place.
(26) While carrying out work in confined space or inside vessel, obtain necessary “Confined Space /
Vessel Entry Permit” from concerned department prior to commencement of the work.
For lighting in such areas, only 24-volt (ISI certified & with proper guard) hand lamp shall be used. For
taking care of the persons working inside the confined space / vessel, a supervisor / person capable to
keep continuous watch on person(s) working inside, assist them in case of emergency or arrange to get
immediate outside help, shall remain present at entry point. Use full body safety belt without failed.
While working inside sewage, trench or in-depth, a person to warn outsiders / entrants / passers etc
shall remain available near entry point or the entry point shall be cordoned by a barricaded tape with a
cautionary notice. After completion of the works, all the lids / covers / grills / grits opened, shall be re-
fixed / re-placed in the original position as it were prior to commencement of the work and leave the
EW- 246 PUR-F-006 RFQ-73782
work place in safe condition in all respect, so as to prevent accident to fellow workers.
(27) The contractor shall see that he / his persons do not work on or block (by stacking material, spare parts,
tools-tackles, equipments etc), any passages / walkways / gangways / aisles / staircases / ladders / lifts
or any other approaches / roads leading to plans or its auxiliaries, on which there is traffic movements or
possible traffic movements in case of emergency. Such passages are meant for safe escape in the event
of emergency. If it is utmost necessary to carry out work in such area with blocking of passage, prior
permission of Competent Authority or the Engineer-In-Charge shall be obtained. To demarcate / declare
the area as “UNSAFE”, cordon it using barricading tape & display suitable caution notice or keep a
person to restrict / divert the traffic on this route through other safe passage.
(28) The contractor shall see that he / his persons do not work on or block (by stacking material, spare parts,
tools-tackles, equipments etc), any passages / walkways / gangways / aisles / staircases / ladders / lifts
or any other approaches / roads leading to plans or its auxiliaries, on which there is traffic movements or
possible traffic movements in case of emergency. Such passages are meant for safe escape in the event
of emergency. If it is utmost necessary to carry out work in such area with blocking of passage, prior
permission of Competent Authority or the Engineer-In-Charge shall be obtained. To demarcate / declare
the area as “UNSAFE”, cordon it using barricading tape & display suitable caution notice or keep a
person to restrict / divert the traffic on this route through other safe passage.
(29) Prior to use power / electrically operated hand tools / equipments / machines / gadgets like welding
machine, hand grinder, hand drill etc, ensure for its safe operation & use it only if it is found safe to use.
Do not use defective, unsafe or improperly maintained equipments.
The electrical power supply required to run such equipments shall not be taken directly at their own but
shall be obtained through concerned Electrical Maintenance Departments or their authorized persons or
under their observations / guidance only. The Electrical Section shall provide temporary electrical
connection up to contractor‟s Mains Board on which it is compulsory to install mains switch, ELCB &
fuses of adequate capacity. All such equipments shall invariably be earthed adequately to prevent
electrical shock, sparking, short circuit etc. Power cord to be used shall be of adequate capacity, without
any joint & shall consist of earth wire also. Hence, it is necessary to use adequate capacity 3-wire power
cord for single & 5-wire power cord for three phase power connections. The plugs, receptacles, pins,
holders etc shall be of adequate capacity & safe to use.
All electrical & mechanical equipments / tools-tackles viz. welding machine, cutting machine, Grinder,
Drill, Chain Pulley Blocks, Hook chooks etc required to be used during work execution shall be of
standard make & bear ISI certification mark on it. The consumables like welding electrodes, grinding
wheels / discs etc which has specific prescribed life span shall not be used in any case if its expiry date is
(30) Non-Sparking Non-Magnetic electrical hand tools and tool kits shall be used by Electrical contractor for
safe use in areas where hazardous, flammable, or combustible vapors, liquids, dusts, or residues may be
present in Gas Based power plant and list of tools and tackles shall be submitted with technical bid.
Non-Sparking Non-Magnetic electrical hand tools and tool kits shall be checked by JE/DE before
commencement of Electrical work.
(31) Before using lifting machines / tackles (like C.P.Bs., Hook chooks, winch, forklift, mobile crane, EOT
crane etc) & its attachments (like D-shackles, slings, U-clamps, Eye bolts or any fixtures), it shall be
checked and used only if found safe to use. Also, ensure that these are tested, examined & certified in
form no.10 by Competent Person as per the Factory act-1948 & Gujarat Factories Rules and its validity
do not expire. Further, it shall be fixed properly and firmly prior to lifting the weight. Valid Test
certificate of all Lifting machines used by Contractor to be submitted to Dy.Safety Officer/
Safety Officer before commencement of work through concerned EE/SE.
(32) Metal Scaffoldings to be used for working at height shall be of adequate size & capacity. Obtain the work
permit when working at height. While climbing on such scaffolding or working on any structure at
height, use of full body safety belt /full body hardness with double lanyard & Fall arrestor & Helmet is
compulsory. It is also necessary to fasten chinstraps of the helmet.
(33) Contractor or their employee shall not interfere in day-to-day routine plant activities / works except the
work assigned to them, shall not loiter in the areas other than their work jurisdiction, as well as shall not
temper / operate / touch the machineries/equipments/auxiliaries with which they are not concerned.
Also, the contractor shall strictly instruct their staff for not to sit or take rest at/near/below running
plants, auxiliaries, systems or any place which is risky, hazardous & prone to accident.
(34) The cylinders containing poisonous / toxic or inflammable / explosive gas like Oxygen, Acetylene, LPG,
Hydrogen, Ammonia, Chlorine, CO2 etc shall be handled safely taking due care. To handle / shift such
cylinders a special trolley /cage meant for it must be used but in no case it should be rolled.
(35) In Gas Based Power station/Hydrogen storage area /Hydro carbon fumes-vapour generated area, Spark
arrestor (as per approved manufacturer of CCOE, Nagpur) shall be provided on each vehicle by
party/agency and it will check by shift security in charge before entry of vehicles in the factory premises.
(36) No women or young person shall be employed or permitted to work in Lead-compound area like battery
room etc. as per schedule VI of GFR
EW- 246 PUR-F-006 RFQ-73782
(37) No women or young person shall be allowed to clean, lubricate or adjust any part of a prime mover or of
any transmission machinery while the prime mover or transmission machinery is in motion. Examination
or operation of motion machinery shall be made or carried out only by a specially trained adult male
worker wearing tight fitting clothing as per section 22 of factories act
(38) In all risky job, before start the work, contractor should obtain General Safety Work Permit through
concerned section from Shift –in-charge well in advance.
(39) In case of noticing smoke or fire during their work execution, they shall make immediate efforts to
extinguish / control it and simultaneously inform the Fire Station Mobile No as well as Station Fire Officer
or Emergency Control room no which is displayed at prominent place of factory like Main Security Gate,
All unit control room, Canteen area, Safe Assembly points, Fire Station, All security gates, Occupational
(40) In case of any injury / accident while working, it shall immediately be reported to Safety Department
through concerned Sectional Head / Engineer. The prescribed Form No. 21 & ANNEXURE may be
obtained from concerned section or Dy. Safety Officer/Safety Officer.
In case of any electrical accident, it shall immediately be reported to Electrical Safety Officer through
concern Sectional Head / Engineer. The prescribed Electrical accident form no. A as per electricity
act-2003 & Form No. 21 & ANNEXURE as per Gujarat Factories rules shall be filled up by concern
department JE/DE with written consent of contractor. The Form may be obtained from concerned
Electrical section or Electrical Safety Officer. Electrical accident investigation shall be carried out by
Electrical Safety Officer with Factory Manager.
After any reportable accident, Contract agency shall be submitted the fitness certificate of injured person
with endorsement of GSECL factory Medical Officer to LWO/Dy. Safety Officer/Safety Officer/Electrical
Safety Officer then after injured person may allow for work.
(41) For any incident occurred but have no injury to any persons should also reported as per GSECL format
and informed to Dy. Safety Officer/Safety Officer as Near Miss Incident.
(42) Safety penalty shall be imposed against violation by contract workers: if any contract worker worked in a
factory contravenes any provision of factories act or any rules or orders made there under. Imposing any
duty or liability on workers, contractors/agency shall be punishable with fine which mentioned as under.
Sr. Description of penalty Amount
(i) Work without PPEs Rs.300/- per person
(ii) Work without work Safety permit like working at height, confine Rs.1000/- per day
space entry, hot work etc.
(iii) License of driver as per type of vehicles not registered. Rs.750/- per person
(iv) Welding work without flashback arrestor/double gauge regulator set Rs.1000/- per set
(v) Operate Portable power tool without ELCB Rs.1000/-per equipment
(vi) Work without qualified Supervisor as per nature of job like Rs.1000/-per day
mechanical, electrical, civil, C&I, chemical etc.
(vii) Work without SOP & JSA Rs.2000/-per day
(viii) Work without test report of lifting machines / tackles (like C.P.Bs., Rs.2000/- per equipment
Hook chooks, winch, forklift, mobile crane, EOT crane etc) & its
attachments (like D-shackles, slings, U-clamps, Eye bolts or any
fixtures) in Form No.10 of Gujarat Factories Rules,1963
(ix) Work without Double lynyer Safety belt during working at Height Rs.3000/-per person
work, work without anchoring in hook/line line
(x) Work without 24 Volt supply in Confine space area Rs.3000/-per person
(xi) (a) Grinding machine used without safety guard/ machine guard Rs. 500/- per equipment/
(b) Unsafe welding machine like open body. Knob without per set
insulation. Connection without plug
(c) Damaged welding cables/gas pipelines
(d) Welding work doing without welding blanket.
(e) Electrical supply without 3 pin plug/industrial plug.
(f) Use of damaged electrical wire for lighting/equipments.
(g) Use of lighting lamp without cage.
(h) Use of open halogen tube.
(i) Use of damaged PPEs/use of non standard PPEs
(j) Unsafe lifting and handling of gas cylinders
(k) Cylinder handling without safety cap
(l) Temporary connection without ELCB. etc
During plants visit/supervision of concern JE/DE/EE,SE. Safety officer/Dy. safety officer. Electrical safety
officer , factory manager, if they will observed any safety violations as per CO circular/statutory requirements
EW- 246 PUR-F-006 RFQ-73782
then they must imposed safety penalty through office note directly against contract workers/contract agency
and Office Note process through proper channel to concern sectional head and Account head for recovery
purpose. Photograph/CCTV Footage is to be put a with penalty note by imposing officer.
(43) Party will damage any fire equipments or property or machinery in factory during execution of work, total
damage cost will be recovered from party RA bill and recovery Office note put up by concern HOD.
(44) All the relevant labour and industrial laws shall also be followed compulsorily.
(45) After completion of work, cotton waste, grease, oil, unused material, welding rod pieces, scrap etc. are to be
removed by contractor and scrap shall be deposited to scrap yard of Main Store.
(46) For performance evaluation of contractor, safety factors of work accident, fire incident & near miss accident
will be considered. Steps can be taken to review the job assignment up to cancellation for negligence.
(47) Over & above these, contractor shall have to follow all the safety requirements /rules & regulations / norms
and legal provisions laid down in various statutes. Particularly the provisions of The Factories Act-1948 & the
Gujarat State Factories Rules-1963 (Amended up to date), The Electricity Act-2003 & rules, BOCW Act/Rules
shall be followed strictly. The contractor shall also obey the rules / regulations / instructions of the local
Competent Authority for safety & health requirements.
(48) The above rules shall be scrupulously followed and where required, Contractor /contractor workers may
contact to the Dy.Safety Officer/Safety Officer/Electrical Safety Officer in case of any ambiguity or needs
further guidance in this regard.
Chief Engineer (Gen)
Signature Of Contractor GSECL: GTPS
EW- 246 PUR-F-006 RFQ-73782
PERFORMA FOR BANK GUARANTEE
INTEGRITY PACT
CERTIFICATE – A
EW- 246 PUR-F-006 RFQ-73782
ON STAMP PAPER OF Rs.300/-
FORM OF BANKER’S UNERTAKING
(For Security Deposit for work period as per Terms and Conditions of Tender)
We, Bank of ______________________________________________ hereby agree unequivocally and
unconditionally to pay immediately on demand in writing from the Gujarat State Electricity Corporation
Limited, or any Officer authorized by it in this behalf any amount up to and not exceeding
Rs.__________ (in words) Rupees
to the said Gujarat State Electricity Corporation Limited on behalf of
M/s.___________________________________________________ who have entered into a contract for
the supply / works specified below :
This agreement shall be valid and binding on this Bank up to and inclusive of________________ and
shall not be terminable by notice or by change in the constitution of the Bank or the firm of Contractors
/ Suppliers or by any other reason whatsoever and our liability hereunder shall not be impaired or
discharged by any extension of time or variations or alterations made, given conceded or agreed, with
or without our knowledge or consent, by or between parties to the said within written contract.
Notwithstanding anything contrary contained in any law for the time being in force or banking practice
this Guarantee shall not be assignable, transferable by the beneficiary (i.e. GSECL or Subsidiaries).
Notice or invocation by any person such as assignee, transferee or agent of beneficiary shall not be
entertained by the Bank. Any invocation of the Guarantee can be made only by the beneficiary directly
“NOT WITHSTANDING” anything contained herein before, our liability under this guarantee is restricted
only). Our guarantee shall remain in force until _______________ (date of validity of the Guarantee).
[Unless demands or claims under this Bank Guarantee are made to us in writing on or before
_____________ (date of validity of the Guarantee), all rights of Beneficiary under this Bank Guarantee
shall be forfeited and we shall be released and discharged from all liabilities there under]:
Please Mention here Complete Postal Signature of
Address of the Bank with Branch Code, Bank‟s Authorized Signatory
Telephone and Fax Nos. with Official Round Seal
EW- 246 PUR-F-006 RFQ-73782
List of Banks for acceptance of Bank Guarantee as security deposit(SD)/ EMD :
As per Finance department GR No: FD/MSM/e-file/4/2024/2589/DMO dt: 01.05.2025
2. A U Small Finance Bank
3. Bandhan Bank
4. Barclays Bank
5. City Union Bank
7. DBS Bank India Limited
9. Equitas Small Finance Bank
10. ESAF Small Finance Bank
11. Federal Bank
16. IDFC First Bank
17. Jammu and Kashmir Bank
18. Jana Small Finance Bank
19. Karnataka Bank
20. Karur Vysya Bank
21. Kotak Mahindra Bank
22. South Indian Bank
23. Standard Chartered Bank
24. Tamilnadu Mercantile Bank
25. Utkarsh Small Finance Bank
27. Ahmedabad Mercantile Co-Operative Bank
28. Nutan Nagrik Sahakari Bank Ltd.
29. Rajkot Nagrik Sahakari Bank Limited.
30. Sarswat Co-Operative Bank Ltd.
31. SBPP Co-operative Bank LTD
32. SVC Co-Operative Bank Ltd.
33. The Cosmos Co-op Bank Ltd.
34. The Gujarat State Co-Operative Bank
35. The Mehsana Urban Co-Operative Bank Ltd.
36. The Surat District Co-operative Bank
37. The Surat Peoples Co-operative Bank Ltd.
38. The Kalupur Commercial Co-operative Bank
39. The Panchmahal District Co-operative Bank
40. The Baroda District Co-operative Bank
41. Baroda Gujarat Gramin Bank
42. Saurashtra Gramin Bank
EW- 246 PUR-F-006 RFQ-73782
EMD BANK GUARANTEE FORMAT
(BANK GUARANTEE ON NON-JUDICIAL STAMP PAPER OF Rs.300)
(Name and Address of the Firm) having their registered Office at
_________________________________________________(Address of the Firm‟s registered Office)
(hereinafter called the Tenderer) wish to participate in the Tender No.__________________________
for______________________________________ of (supply / Erection / Supply & Erection / Work) of
__________________________________ (Name of the material / equipment / work) for
_________________________ Gujarat State Electricity Corporation Limited and WHEREAS a Bank
Guarantee for (hereinafter called the “Beneficiary”) Rs. _____________ (Amount of EMD) valid till
____________ (mention here date of validity of this Guarantee which will be 4 (FOUR) months beyond
initial validity of Tender‟s offer) which is required to be submitted by the Tenderer along with the
(Name of the Bank and address of the Branch giving the Bank Guarantee) having our registered Office
at _____________________ (Address of Bank‟s registered Office) hereby give this Bank Guarantee No.
_________________dated ____________ and hereby agree unequivocally and unconditionally to pay
immediately on demand in writing from the Gujarat State Electricity Corporation Limited or any Officer
authorized by it in this behalf any amount not exceeding Rs.____________ (amount of EMD) (Rupees
______________________________________________________) (in words) to the said Gujarat State
Electricity Corporation Limited on behalf of the Tenderer.
We, ____________________________________________ (Name of the Bank) also agree that
withdrawal of the tender or part thereof by the Tenderer within its validity or non-submission of Security
Deposit by the Tenderer within one month from the date of tender or a part thereof has been accepted
by the Gujarat State Electricity Corporation Limited would constitute a default on the part of the
Tenderer and that this Bank Guarantee is liable to be invoked and encased within its validity by the
Beneficiary in case of any occurrence of a default on the part of the Tenderer and that the encased
amount is liable to be forfeited by the Beneficiary.
This agreement shall be valid and binding on this Bank up to and inclusive of____________________
(mention here the date of validity of Bank Guarantee) and shall not be terminated by notice or by
Guarantor change in the constitution of the Bank or the Firm of Tenderer or by any reason whatsoever
and our liability hereunder shall not be impaired or discharged by any extension of time or variations or
alterations made, given, conceded with or without our knowledge or consent by or between the
EW- 246 PUR-F-006 RFQ-73782
Tenderer and the Gujarat State Electricity Corporation Limited.
Notwithstanding anything contrary contained in any law for the time being in force or banking practice
this Guarantee shall not be assignable, transferable by the beneficiary (i.e. GSECL or Subsidiaries).
Notice or invocation by any person such as assignee, transferee or agent of beneficiary shall not be
entertained by the Bank. Any invocation of the Guarantee can be made only by the beneficiary directly.
NOTWITHSTANDING anything contained hereinbefore our liability under this Guarantee is restricted to
Our Guarantee shall remain in force till _____________ (date of validity of the Guarantee). Unless
demands or claims under this Bank Guarantee are made to us in writing on or before ___________
(date of validity of the Guarantee), all rights of Beneficiary under this Bank Guarantee shall be forfeited
and we shall be released and discharged from all liabilities there under.
Please mention here complete Postal Signature of the
Address of the Bank with Branch Code, Bank‟s authorized
Telephone and Fax Nos. Signatory with Official Seal.
EW- 246 PUR-F-006 RFQ-73782
GUJARAT STATE ELECTRICITY CORPORATION LIMITED- GTPS
To create an environment where Business Confidence is built through Best Business Practices and is
fostered in an atmosphere of trust and respect between providers of goods and services and their users
for the ultimate benefit of society and the nation.
GSECL’S COMMITMENT PARTY’S COMMITMENT
To maintain the highest ethical Not to bring pressure recommendations
standards in business and professions. from outside GSECL to influence its
Ensure maximum transparency to the Not to use intimidation, threat, inducement
satisfaction of stakeholders. or pressure of any kind on GSECL OR ANY
OF it‟s employees under any circumstances.
To ensure to fulfill the terms of To be prompt and reasonable in fulfilling
agreement/contract and to consider the contract, agreement, legal obligations.
objectively the view point.
To ensure regular and timely release of To provide goods and / or services timely
payments on due dates for work done. as per agreed quality and specifications at
minimum cost to GSECL.
To ensure that no improper demand is To abide by the general discipline to be
made by employees or by anyone on maintained in our dealings.
To give maximum possible assistance to To be true and honest in furnishing
all the Vendors/Suppliers/Service information.
Provider and other to enable them to
complete the contract in time
To provide all information to Not to divulge any information, business
suppliers/contractors relating to details available during the course of
contract / job which facilitate him to business relationship to others without the
complete the contract / job successfully written consent to GSECL.
To ensure minimum hurdles to vendors Not to enter into carter / syndicate
/ suppliers / contractors in completion /understanding whether formal / non
of agreement / contract / work order. formal so as to influence the price.
Seal & Signature Seal & Signature
(GSECL‟s Authorized Signatory) (Party‟s Authorized Person)
EW- 246 PUR-F-006 RFQ-73782
On Firm’s Letter Head
CERTIFICATE - A
I / We ________________________________________________ authorized signatory of
M/s. _____________________________________________ is not related with other firms who have
submitted tenders for the same items under this inquiry / Tender.
Signature of the Tenderer
With Designation
Seal of the Firm
EW- 246 PUR-F-006 RFQ-73782
GENERAL GUIDELINES RELEVANT TO I.S.
SPECIAL CONDITIONS FOR USE OF CEMENT
APPROVED NAME OF MANUFACTURERS OF
EW- 246 PUR-F-006 RFQ-73782
GENERAL GUIDELINES RELEVANT TO IS
Please refer latest edition of relevant Indian Standard Specification of Code i.e. B.I.S.
General relevant I.S. of B.I.S. shall prevail for all items including materials, measurements
The Item wise detailed specifications are intended for full description of items covered by
Schedule “B”. The specifications are not however intended to cover every detail and the
works shall be executed according to the spirit of the specifications below and the best
prevailing P.W.D. practice. The clarification to any clause in detailed specifications shall be
sought from the latest edition of relevant I.S. specification and codes. Where these
specifications are at variance with the specification laid down in the I.S. Books stated
above, the former will be applicable. As regarded matters not covered by any of the above
specification, the decision of the Engineer-in-charge shall be treated as final and shall be
binding upon the contractor. The contractor is expected to get clarified any doubt about
specification, etc. before tendering by discussing with Engineer-in-charge.
For detail technical specification, the item wise description along with above general
specifications shall hold good.
Chief Engineer (Gen)
Signature Of Contractor GSECL: GTPS
EW- 246 PUR-F-006 RFQ-73782
SPECIAL CONDITIONS FOR USE OF CEMENT IN WORK
1 The rates in Schedule – „B‟ is inclusive of cement cost. Contractor has to purchase
fresh 43 grade cement confirming to as per IS 8112 Or PPC IS 1489 (Part-I) or as per
tender condition.
2 Contractor has to construct pucca Go down at site of work so that cement bags can be
properly preserved to avoid damage due to any kind of water/Humidity.
3 Contractor has to bring sufficient quantities of cement bags to maintain progress of
work. The work should not suffer for want of cement.
4 Cement should be used to achieve required strength in cement concrete or as per item
5 To bring sufficient & timely cement at site is full responsibility of contractor. Nothing
extra will be paid on account of any reason to maintain progress of work and to
complete the work in schedule time.
6 Contractor has to submit material A/c. For consumption of cement used with every bills.
In case of not submitting the same, bill will not be passed. Party has to submit the copy
of cement purchased bill and Challan/invoice along with each RA Bill/Final Bill.
7 No negative variation will be allowed for consumption in cement less then prescribed as
per R & B SoROR Corporation/mix design and nothing will be paid extra for over
8 Contractor is fully responsible for safety of cement at site; nothing will be paid extra on
account of safety.
9 If Corporation‟s authorized representative wants to check cement stock at site,
contractor has to allow for the same at any time.
10 Contractor has to maintain day to day cement consumption / balance account at site.
11 As far as possible, contractor has to maintain supply of cement of only one brand &
grade throughout the work and on account of closer/shortage of approved brand,
cement of other brand in accordance of condition No. (1) Will be allowed by Engineer –
12 Minimum cement consumption considered for cement concrete having grade of M–15 /
M – 20 / M – 25 is 320 Kgs. / 375 Kgs / 400 Kgs. respectively. Contractor has to use
minimum cement as above. Contractor should not use less than the prescribed
quantities of cement even in the case of mix design recommends lower quantity. For
other items cement consumption shall be as per provisions of SoR without any negative
variation. Nothing will be paid extra for over consumption.
13 Contractor will be allowed to carry out work only after physical verification of cement
brought at site.
14 Full cement bags brought by contractor shall be entered at IN GATE of
Gayatri/Control/Sangol of Wanakbori, TPS.
EW- 246 PUR-F-006 RFQ-73782
Approved Name of Firms of Manufactures of Civil Items Allowed to use being
supplied by contractors in civil works
Sr. Name of approved Vendor List of Company & their Brand Name in Market
01 A.C.C. Cement A.C.C
02 Ambuja Cement Ambuja
03 Binani Cement Binani
04 Birla Cement Birla A-1
05 Gujarat Sidhee Cement Sidhee
06 J.K. Cement J.K.
07 J.K. Laxmi Cement J.K.Laxmi
08 Sanghi Cement Sanghi
09 Saurastra Cement Hathi
10 Shree Digvijay Cement (SDCC) Kamal
11 India Cement Corromandal King
12 Ultratech Cement (L&T) Ultra-tech
13 HI-BOND Cement Hi-Bond
14 Shree Cement Limited Shree/Bangur/Rock
Strong/Roofon/Bangur Power
15 Midland Concrete Pvt. Ltd., Rajkot S O L ID
CONSTRUCTION CHEMICALS
01 RedWop Chemicals Rajkot
02 Samrock Chemicals Ahmedabad
Water Proofing &Wrapping Coating
01 Bitumag Industries Vadodara
02 A.R. Industries Vadodara
03 Tiki Tar Danosa (India) Pvt. Ltd. Halol
04 STP Ltd., Ankleshwar
01 Asian Granito Sabarkantha
02 Somany Kaloal
03 Simpolo Morbi
04 Varmora Morbi
05 Sunheart Morbi
07 Cengres Ahmedabad
EW- 246 PUR-F-006 RFQ-73782
01 Tata Iron & Steel Co. Ltd TATA
02 Jindal Jindal
03 Lloyds Llyods
04 Essar Steel Ltd. Essar
05 Steel Authority of India. SAIL
06 Parmeshwar Steel Pvt ltd. God TMT
07 Gallant Ispat Ltd. Gallant TMX
08 Aditya Ultra Steel Pvt. Ltd. KAMDHENU NXT & Kay 2 TMT
09 Mono steel India Ltd. MONO TMT
10 Aashiana Rolling Mills Ltd. Friends Steel
11 Electro Therm (I) Ltd. ET TMT
12 H.K. Ispat .Pvt. Ltd. Kothi
13 SRJ peety steel Pvt. Ltd. SHREE OM TMT/SRJ TMT/KAPILA
14 NilkanthConcast Private Limited Nilkanth
15 Shreeyam Power & Steel Industries Limited National
16 Utkarsh Bars Private Limited Utkarsh
17 Bhagyalaxmi Rolling Mill Pvt. Ltd Polad
18 ShriKhatuShyam Alloys Pvt. Ltd., Khatu TMT
19 Steefo Steels LLP, Ahmedabad STEEFO TMT
20 Haq Steel &MetaliksLtd.,Kutch GERMAN TMX
21 K.B. Ispat Private Ltd., Bhavnagar KB TMT
22 VMS TMT Private Ltd., Ahmedabad KAMDHENU NXT & Kay 2 TMT
23 BriskonMultimetals LLP
24 Kalika Steel Alloys Pvt. Ltd., Jalna KALIKA 500 TMT
25 Anjar TMT Steel Pvt.Ltd.,Anjar Welspun Shield
26 ShriBajrang Power &Ispat Ltd. Goel TMT & Pipes
27 Rajuri Steels &TMT Bars Pvt. Ltd. Rajuri Steel
28 SMW Steel Sangam
29 Rathi Steel & Metal Pvt. Ltd. Icon Steel
30 MetarollsIspat Pvt. Ltd. Metarolls TMT
31 SaiBandhanInfinium Pvt. Ltd., BANDHAN TMX
32 Gajkesari Steels & Alloys Pvt. Ltd GAJKESARI TMX
33 Rudra Global Infra Product Ltd., RUDRA TMX
34 Varrsana Ispat Ltd.,Gandhidham VARRSANA TMT
35 Jay Bharat Steel Corporation, Kutch JAY BHARAT TMX &
36 Jideep Ispat & Alloys Pvt Ltd, Indore MOIRA CRS &TMT
37 N.N. Ispat Pvt. Ltd., West Bengal U L T R AMAX TMT
38 R S VIRLA Pvt Ltd, Rajkot R S VIRLA TMT & R STMT
In addition to the above Approved Vendor List of GSECL, the approved vendor list of GUVNL
and its subsidiary company i.e. GSECL/GETCO/MGVCL /PGVCL/DGVCL & UGVCL which are
available on their website- in tender head including above mention various manufacturers are
also to be treated as Approved Vendors.
Chief Engineer (Gen)
Signature Of Contractor GSECL: GTPS
EW- 246 PUR-F-006 RFQ-73782
GUJARAT STATE ELECTRICITY CORPORATION LTD
GANDHINAGAR THERMAL POWER STATION
GANDHINAGAR-388239
Name of Work The works of Providing and Fixing of tap connection in
bathroom of C-type quarter from direct water supply and
Misc. Civil Work ( As and when required ) at GTPS.
DEVIATION FROM BIDDER (IF ANY)
1. GSECL does not bind to accept the deviation offered by bidder for evaluation of tender.
2. If there is any deviation from bidder, it should be clearly mentioned on this page.
3. Deviation mentioned on other page should not be considered and order will be placed according to
the tender documents.
4. If there is no any deviation from bidder, than it must be clearly mentioned in this page “NO
DEVIATION OFFERRED”
Signature of the Contractor
EW- 246 PUR-F-006 RFQ-73782
GUJARAT STATE ELECTRICITY CORPORATION LTD
WANAKBORI THERMAL POWER STATION
PO :THERMAL, TA:GALTESHWAR,
DI:KHEDA-388239
Name of Work The works of Providing and Fixing of tap connection in
bathroom of C-type quarter from direct water supply and Misc.
Civil Work ( As and when required ) at GTPS.
(UNDERTAKING IN REGARD TO STOP DEAL / BLACK LIST
All Bidders will have to furnish the following Undertaking duly filled in, signed and stamped for
each quoted item of the Tender along with the Technical Bid.
Sub:- Undertaking in regard to Stop Seal / Banned for Business Dealing / Black List Thereof.
Ref:- Tender No:
And their proprietor / any partner / any directors of the firm is not stop deal and/or banned for
business dealing and/or black listed by GUVNL and/or their any subsidiary company viz. GSECL /
GETCO / DGVCL / MGVCL / UGVCL / PGVCL”.
Seal of the Firm.
Signature of the Tenderer.
EW- 246 PUR-F-006 RFQ-73782
GENERAL SPECIFICATIONS
TECHNICAL SPECIFICATION
EW- 246 PUR-F-006 RFQ-73782
GENERAL SPECIFICATIONS
01. In the specifications, “as directed”/”Approved” shall be taken to mean “as directed”/”approved”
by the Engineer-in-charge.
02. Wherever a reference to any Indian Standard appears in the specifications, it shall be taken to
mean as a reference to the latest edition of the same in force on the date of agreement.
03. In “Mode of Measurement” in the specification wherever a dispute arises in the absence of
specific mention of a particular point or aspect, the provisions on these particular points or
aspects in the relevant Indian Standards shall be referred to.
04. All measurements and computations, unless otherwise specified, shall be carried out as per
05. The distance which constitutes lead shall be determined along the shortest practical route and
not necessarily the route actually taken. The decision of the Engineer-in-charge in this regard
shall be taken as final.
06. Where no lead is specified, it shall mean “all leads”.
07. Lift shall be measured from plinth level.
08. Up to “floor two levels” means actual height of floor up to 6.5 Mt. Above plinth level.
09. Definite particulars covered in the items of work, though not mentioned or elucidated in it,
specification shall be deemed to be included therein.
10. Reference to specifications of materials as made in the detailed specification of the items of work
is in the form of a designation containing the number of the specification of the material and
prefix „M‟ e.g. „M-5‟.
11. Approval to the samples of various materials given by the Engineer-in-charge shall not absolve
the contractor from the responsibility of replacing defective material brought on site or materials
used in the work found defective at a later date. The contractor shall have no claim to any
payment or compensation whatsoever on account of any such materials being rejected by the
Engineer-in-charge.
12. The contract rate of the item of work shall be for the work completed in all respects.
13. No collection of materials shall be made before it is got approved from the Engineer-in-charge.
14. Collection of approved materials shall be done at site of work in a systematic manner. Materials
shall be stored in such a manner as to prevent damage, deterioration or intrusion of foreign
matter and to ensure the preservation of their quality and fitness for the work.
15. Cement, reinforcements bars & all other materials to be used shall be got approved from EIC
before starting of work. The cement, reinforcement steel & other materials to be brought at site
shall be entered at GANDHINAGAR, TPS main entry gate.
16. Materials, if and when rejected by the Engineer-in-charge, shall be immediately removed from
the site of work.
17. No materials shall be stored prior to, during and after execution of a structure in such a way as
to cause or lead to damage or overloading of the various components of the structure.
18. All works shall be carried out in a workmanlike manner as per the best techniques for the
particular item.
19. All tools, templates, machinery and equipment for correct execution of the work as well as for
checking lines, levels, alignment of the works during execution shall be kept in sufficient
numbers and in good working condition on the site of the work.
20. The mode, procedure and manner of execution shall be such that it does not cause damage or
over loading of the various components of the structure during execution or after completion of
21. Special modes of construction not adopted in general Engineering practice, if proposed to be
adopted by the Contractor, shall be considered only if the contractor provides satisfactory
evidence that such special mode of construction is safe, sound and helps in speedy construction
and completion of work to the required strength and quality. Acceptance of the same by the
Engineer-in-charge shall not, however, absolve the contractor of the responsibility of any adverse
effects and consequences of adopting the same in the course of execution of completion of the
EW- 246 PUR-F-006 RFQ-73782
22. All installations pertaining to water supply and fixtures thereof as well as drainage lines and
sanitary fittings shall be deemed to be completed only after giving satisfactory tests by the
23. The contractor shall be responsible for observing the rules and regulations imposed under „Minor
Minerals Act‟ and such other laws and rules prescribed by Government from time to time.
24. All necessary safety measures and precaution [including those laid down in the various relevant
Indian Standards shall be taken to ensure the safety of men, materials and machinery on the
works as also of the work itself.
25. The testing charge of all materials shall be borne by the Contractor unless recovery at one
percent towards using charges is separately made.
26. Approval to any of the executed items for the work does not in any way relieves the contractor
of his responsibility for the correctness, soundness and strength of the structure as the drawings
and specification.
Chief Engineer (Gen)
Signature Of Contractor GSECL: GTPS
EW- 246 PUR-F-006 RFQ-73782
TECHNICAL SPECIFICATIONS
NAME OF WORK: The works of Providing and Fixing of tap connection in bathroom of
C-type quarter from direct water supply and Misc. Civil Work ( As and when
required ) at GTPS.
01. In the specifications, “as directed”/”Approved” shall be taken to mean “as directed”/”approved” by the
Engineer-in-charge.
02. In “Mode of Measurement” in the specification wherever a dispute arises in the absence of specific mention of
a particular point or aspect, the provisions on these particular points, or aspects - the relevant Indian Standards
shall be referred to.
03. All measurements and computations, unless otherwise specified, shall be carried out nearest to the following
a. Length, width and depth (height) -----------0.01 Meter.
04. The distance which constitutes lead shall be determined along the shortest practical route and not
necessarily the route actually taken. The decision of the Engineer-in-charge in this regard shall be
taken as final.
05. Where no lead is specified, it shall mean “all leads”.
06. Lift shall be measured from plinth level.
07. Reference to specifications of materials as made in the detailed specification of the items of work is in the
form of a designation containing the number of the specification of the material and prefix „M‟ e.g. „M5‟.
08. Approval to the samples of various materials given by the Engineer-in-charge shall not absolve the contractor
from the responsibility of replacing defective material brought on site or materials used in the work found defective
at a later date. The contractor shall have no claim to any payment or compensation whatsoever on account of any
such materials being rejected by the Engineer-in-charge.
09. The contract rate of the item of work shall be for the work completed in all respects.
10. No collection of materials shall be made before it is got approved from the Engineer-in-charge.
11. Collection of approved materials shall be done at site of work in a systematic & sequantial manner. Materials
shall be stored in such a manner as to prevent damage, deterioration or intrusion of foreign matter and to ensure
the preservation of their quality and fitness for the work.
12. Materials, if and when rejected by the Engineer-in-charge, shall be immediately removed from the site of
13. All tools, templates, machinery and equipment for correct execution of the work as well as for checking lines,
levels, alignment of the works during execution shall be kept in sufficient numbers and in good working condition
on the site of the work.
14. Special modes of construction not adopted in general Engineering practice, if proposed to be adopted by the
Contractor, shall be considered only if the contractor provides satisfactory evidence that such special mode of
construction is safe, sound and helps in speedy construction and completion of work to the required strength and
quality. Acceptance of the same by the Engineer-in-charge shall not, however, absolve the contractor of the
responsibility of any adverse effects and consequences of adopting the same in the course of execution of
completion of the work.
15. All installations pertaining to water supply and fixtures thereof as well as drainage lines and sanitary fittings
shall be deemed to be completed only after giving satisfactory tests by the Contractor.
16. The contractor shall be responsible for observing the rules and regulations imposed under „Minor Minerals Act‟
and such other laws and rules prescribed by Government from time to time.
17. The testing charge of all materials shall be borne by the Contractor & reports of authorize laboratory shall be
submitted timely.
18. Approval to any of the executed items for the work does not in any way relieves the contractor of his
responsibility for the correctness, soundness and strength of the structure as per the drawings and specification.
19. Due care at all the items shall be taken to see that no damage is caused to the existing setup of GSECL. In
case of any such damage is caused, it shall be restored by the agency at his own cost.
20. Schedule of working shall be so arranged that maximum outcome is achieved in working hours.
DETAILED TECHNICAL SPECIFICATIONS
NOTE: BOOKLET FOR “GENERAL TECHNICAL SPECIFICATIONS FOR BUILDING WORKS” OF R. & B.
DEPARTMENT, GOG, GUJARAT AND BOOKLET OF “GENERAL SPECIFICATION FOR CIVIL WORKS” OF
GSECL WILL BE AVAILABLE IN CIVIL OFFICE AT GANDHINAGAR TPS FOR REFERNCE OF RELEVANT
DETAIL SPECIFICATIONS OF ITEMS. SHALL BE CONSIDERED & ADOPTED IN WORK.
EW- 246 PUR-F-006 RFQ-73782
DETAIL SPECIFICATION
Demolition & Disposal of unserviceable materials with all lead & lift (i) Unreinforced cement
1.0. Workmanship: The relevant specifications of item No. 1 shall be followed except that demolition of
R.C.C. work is to be done.
2.0. Mode of measurements & payment :
2.1. The relevant specification of item No. 1 shall be followed except that the demolition of reinforced
concrete structure. The unserviceable materials shall be disposed of at all leads and lifts. The rate
excludes scraping straightening of reinforcement but includes cutting of reinforcement.
2.2. The rate shall be for a unit of one cubic meter
Item no.2 Providing, laying & jointing in true line and level 15 mm dia U.P.V.C. pipe ( SCH -
40) for cold water including fitting make PRINCE/SUPREME/ASTRAL/FINOLEX or
equivalent as approved by Engineer in charge. Pipe shall be fixed on the wall with help of
clamp at every two meter C/C or shall be concealed as directed including necessary fitting
etc. including testing of pipe and joints and fixing the same with adhesive solvent including
cost of all material .
Materials : U.P.V.C. Pipe of PRINCE / SUPRIME / ASTRAL / FINOLEX make or ASTM-1785 equivalent
ISI approved brand pipe dia. 15 mm specified dia. Nominal bore shall confirm to (SCH-40).The U.P.V.C.
fittings, clamps etc. Required for specified dia. UPVC pipes and fittings shall be of best quality and make
as approved by the Engineer-in-charge.
2.1 The width and depth of the trenches for different diameters of the tubes shall be as under: For 15 to
80 mm. Dia. Tube width of trenches shall be 30 cm and depth of trenches 60 cm. If necessary depth
after 750 mm, extra depth and width will be paid under separate item.
2.2. At joints, the trench width shall be widened where necessary without extra payment. The work of
excavation and refilling shall be done true to line and gradient in accordance with general specifications
of earth work in trenches.
2.3. The remaining portion of trench shall be then filled with excavated earth. The surplus earth shall be
disposed of as directed.
2.4. When the excavation is done in rock, the bottom shall be cut deep enough to permit the pipe to be
laid and cushion of sand 75 mm. In case of bigger diameter of tube where the pressure is very high,
thrust bock of cement concrete 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate of 20 mm.
Nominal size) shall be constructed on all bends to transmit the hydraulic thrust without impairing the
ground and spreading it over a sufficient area if so specified
2.1. Cutting, Laying and Jointing :
2.1.1. When the pipes are to be cut or rethreaded, the end shall be carefully filed out so that no
obstruction to bore in offered. The ends of the tubes shall then be threaded conforming to the
requirements of I.S. 554-1955 with pipe dies and taps carefully in such a manner as will not result in
slackness of joints when the two pieces are screwed together.
2.1.2 The taps and dies shall be used only for straightening screw threads which have become bent or
damaged and dies shall not be used for turning of the threads so as to make them slacks as the latter
procedure may not result in watertight joints. The screw threads for tube and fittings shall be protected
from edge unit they are fitted.
2.1.3. In jointing the pipes, the inside of the socket and the screwed end of the tubes shall be oiled and
smeared with white or red lead and whole tight material / taflon tap wrapping around with a few turns
of fine spun yarn round the screwed end of the tube. The end shall then be tightly screwed in the
socket, tees etc. with a pipe wrench. Care shall be taken that all pipes and fittings are properly jointed
so as to make the joints completely water tight and pipes are kept at all times free from dust and dirt
during fixing. Burr joints shall be removed after screwing. After laying, the open ends of the pipes shall
be temporarily plugged to prevent access of water, soil or any other foreign matter.
2.2. Testing of joints :
2.2.1.After laying and jointing, pipes and fittings shall be inspected under working conditions of pressure
EW- 246 PUR-F-006 RFQ-73782
and flow. Any Joints found leaking shall be redone, and all leaking pipes removed and replaced without
2.2.2. The pipes and fittings as they are laid shall be tested to hydraulic pressure of 6Kg./sq. Cm. The
pipe shall be slowly and carefully charged with water allowing all air to escape and avoiding all stock and
water hammer. The draw off takes and Stop cock shall then be closed and specified hydraulic pressure
shall be applied gradually. The pressure gauge must be accurate.
The pipes and fittings shall be tested section as the work of laying proceeds keeping the joints exposed
for inspection during the testing.
Testing of pipe lines fittings and joints include for providing all plant and appliances necessary for
obtaining access to the work to be tested and carrying out the tests.
The item includes UPVC pipe with screwed socket joints, together with all fittings (such as bends,
sockets, springs, elbows, tees, crosses short pieces, clamps and plugs unions etc.) And fixing complete
with clamping wall-hooks, wooden plugs etc. And also cutting, screwing and waste and for making
forged (or handmade) bends on piping as required. Connector shall be inserted, where required or
directed. The rate also includes cutting through walls, floors etc.
3.0 Mode of measurements & payment:
The rate includes cost of all labor, materials tools, and plants, etc. required for satisfactory completion
The rate shall be for unit of running meter of actual work done.
Item no.3 Providing, laying & jointing in true line and level 25 mm dia U.P.V.C. pipe ( SCH -
40) for cold water including fitting make PRINCE/SUPREME/ASTRAL/FINOLEX or
equivalent as approved by Engineer in charge. Pipe shall be fixed on the wall with help of
clamp at every two meter C/C or shall be concealed as directed including necessary fitting
etc. including testing of pipe and joints and fixing the same with adhesive solvent including
cost of all material
Item No.4 Dismantling G.I/C.I. pipes, G.S.W. Pipes and A.C. rain water pipes with fittings
and clamps including stacking the materials with all lead and lift. (For any dia. of pipes) &
the same should be credited in Main store.
As per above item no.2 specifications same.
The rate shall be for unit of running meter of actual work done.
Item No.4 Providing and fixing Brass chromium plated Bib cock make crown / sonata /
Prince size 15 mm heavy duty with flange with necessary reducer U P V C pipe connection.
1.0. Materials : 1.1. 15 mm. Dia. Brass screw down with bright polished finish shall conform to I.S.
781-1977. The bib cock shall be best Indian make and quality and as per approved by EIC.
2.0 Workmanship :
2.1 The screw down bib cock 15 mm. Dia as specified above shall be fixed as directed. The
threaded portion shall be smeared with white or red lead and around with a few turns of fine
spun yarn round the screwed end of the pipe. The bib cock shall be than screwed and fixed to
water tight position.
3.0 Mode of measurements & payment :
3.1 The rate includes cost of all labor, materials, tools and plant etc. Required for satisfactory
completion of this item.
3.2 The rate shall be for a unit of one Number
Item No.5 providing & fixing concealed cock of make crown / sonata / Prince of 15 mm dia
heavy duty with flange duly fitting of U P V C Pipes.
2.0. Materials:- The structured steel work shall conform to M:22. Red lead paint primer shall
conform to I.S.: 102-1962.and as per approved by EIC.
2.1. The steel sections „as specified or required shall be cut, square and to correct lengths, as per
drawings and design. The cut ends exposed to view shall be finished smooth; No. two pieces shall be
welded or other wise jointed to make up the required length of member, except as indicated in the
drawing or as directed. All straightening and shaping to form shall be done by application of pressure
EW- 246 PUR-F-006 RFQ-73782
and not by hammering. Any bending or cutting shall be carried out in such a manner as not to impair
the strength of the metal. All operations shall be done in cold state unless otherwise directed/permitted.
1.1. The relevant specifications shall be done by welding.
1.2. Welding shall generally be done by electric process. Gas welding shall be resorted to using
oxyacetylene flame with specific approval. Gas welding shall not be permitted for structural steel work.
1.3. The work shall be done as shown in the drawings which should clearly indicate various details of
the joints to be welded and site weldes as well as type of electrodes to be used. Symbol for welding
drawing shall be according to I.S. 813-1961. As far as possible every effort shall be made to limit the
welding that must be done after improper welding that is likely to be done due to heights and difficult
position on scaffoldings etc. The welding work shall conform to I.S. 816-1969.
1.4. Preparation of surfaces : Surfaces which are to be welded together shall be free from loose mill
scale, rust, paint, grease or other foreign matter. A coating of boiled linseed oil shall be permitted.
1.5. Assembly for welding : Before welding is commenced, the plates shall first be brought together and
firmly clamped or spot welded at specified distance. The temporary connection has to be strong enough
to hold the plates accurately in place without displacement.
1.6 Precautions : All operations connected with welding and cutting equipment shall confirm to safety
requirement given in I.S. 818-1968.
The following points shall be borne in mind during the process of welding :
(a) Welds shall be made in flat position wherever practicable.
(b) Are length, voltage and smperage shall be suited to the thickness of material, type of groove and
other circumstances of the work.
(c) The segments of welding shall be such that where possible, the members which offer the greatest
resistance to compression are welded first.
1.7. The defective welds which shall be considered harmful to the strength shall cut out and rewelded.
1.8. Finished welds and adjacent parts shall be protected with clean boiled linseed oil and after all stag
has been removed welds and adjacent parts shall be painted after the same are approved.
1.9.All the members shall be thoroughly cleaned of rust, scales, dust etc. and given a priming coat of
red lead paint before fixing them in position, ting of welding to be added in the specification I.N.
3.0. Mode of measurements & payment:
3.1. The steel work shall be measured in general as under.
(a) All work shall be measured in the basis of finished dimensions as fixed at site and measured net
unless specified otherwise.
(b) The weight of steel sections, steel strips in finished work shall be calculated from standard weight on
the same basis on which steel is supplied to the Contractor by department or those given in relevant I.S.
if steel is arranged by the contractor.
(c) The weight of steel plates and strips shall be taken from relevant I.S. based on 7.85 Kg/sq. metre for
every milimetre Sheet thickness if steel is supplied by the contractor, otherwise, the weight shall .be
calculated on the basis on which steel is supplied to the contractor by department.
(d) Unless otherwise specified weight of clearest, brackets, packing pieces, bolts, nuts, washwers,
distance pieces, separators, diaphragm gusset (taking over all square dimensions) fish plates etc. shall
be added to the weight of respective items.
(e) In riveted work allowance to be made of weight of rivet hands. No deductions shall be made for rivet
or bolt holes excluding holes for anchor or holding down bolts.
(f) For forged steel and steel castings, weight shall be calculated on the basis of 7850 kg/cum.
(g) Unless otherwise specified an addition of 2.5 percent of the weight of structure shall be made for
shop and site rivet heads in riveted steel structure.
(h) Unless otherwise specified, no allowance shall be made for the weld metal in case of welded steel
(i) Dimensions other than cross sections and thickness of plates shall be measured to nearest 0.001 m.
(j) Mill tolerance shall be ignored when weight is determined by calculation.
3.2. The rate includes cost of all material, labour, erection, hoisting, scaffolding protective measure,
required for proper completion of the item of work. This shall also included conveyance and delivery
handling, loading, unloading and storing etc. required for completing the item described above including
necessary wastage involved.
3.3. The rate shall be for a unit of one quintal.
EW- 246 PUR-F-006 RFQ-73782
Item No.6 Providing and Fixing Brass chromium plated stop cock of make LMC / sonata /
Prince of size 15 mm heavy duty with flange due fitting for G I or C P V C pipes
1. Materials: The brass screw down stop cock of specified dia. Shall conform to I.S. : 781-1977. The
stop cock shall be tested quality.\ and as per approved by EIC.
2. Workmanship : The stop cock shall be fixed in position by means of Jam nut and socket. The stop
cock shall be fixed near the inlet of the water meter or as directed. The joints shall be done with white
zinc and spun yarn. The joint shall be tested for leak proofing.
3. Mode of measurements & payment :
3.1 The rate includes cost of all labor, materials, tolls and plant etc. Required for satisfactory
completion of this item.
3.2 The rate shall be for a unit of one number
Item no.07 providing and fixing 25 mm diameter chromium plated brass half turn flush
cock of make crown / sonata / Prince including fixing in pipe line etc. complete
3.0. Materials: Chromium plated brass half turn flush cock shall conform to M-67. . It shall be having
minimum weight shall lie between 650 to 700 gm and as per approved by EIC.
Workmanship: The half turn flush cock of Prince, Crown, Sonata I.S.I. approved quality specified
diameter shall be fixed as directed. The flush cock shall be fixed in G. I. Pipe line with necessary fittings.
The joints shall be made leak proof by using spun yarn and white zinc. In case of fixing of tubes and
fittings to the walls or ceilings, these shall run on the surface of the wall or ceiling (not in chase) unless
otherwise specified. The fixing shall be done by means of standard pattern, holder clamps keepings the
pipes about 15 mm. Clear of the wall. When it is found necessary to conceal the pipes and when
specified so, chasing may be adopted or pipe fixed inducts or recesses etc. provided that there is
sufficient space to work on the pipe with usual tools. The pipe shall not ordinarily be buried in walls or
solid floors, where unavoidable, pipes may be buried for short distances provided the adequate
protection is given against damage and where so required joints are not buried. Where required M.S.
tube sleeve shall be fixed at a place a pipe is passing through a wall or floor for expansion and
contraction and other movements. In case the pipe is embedded in walls or floors, it should be painted
with anti-corrosive bitumastic paint of approved quality. The pipe should not come in contact with lime
mortar or lime concrete as the pipe is affected by lime. Under the floors, the pipe shall be laid in layer of
2.2.2. All pipes and fittings shall be fixed truly vertical and horizontal unless unavoidable. The pipes shall
be fixed to walls with standard pattern clamps of required size and shape, one end of which shall be
properly plugged or cemented into walls with cement mortar 1:3 (1 cement : 3 coarse sand) and the
other tightened round the pipes to hold it securely. These clamps shall be spaced at regular intervals in
straight length at 2 M.C./C interval in horizontal run and 2.5 M interval in vertical run. For pipe of
mm. Dia. Up to 25 mm. Dia. The holes in the walls and floors shall be made by drilling with chisel or
jumper and not by dismantling the brick or concrete. However for bigger diameter pipes, the holes shall
be carefully made of the smallest required size. After fixing the pipe the holes shall be made good with
cement mortar 1:3 (1 cement: 3 coarse sand) and properly finished to match the adjacent surface.
Mode of measurements & payment:
2.1 The rate includes cost of all materials and labor required for satisfactory completion of this item
including fittings.
2.2 The rate shall be for a unit of one number
Item no.8 providing & fixing 100 mm dia.C.P.Brass shower rose with 20 mm inlet. (
mm dia Each ) with due fitting for G I or U P V C pipes .
1.0. Materials: 1.1. The 100 mm. Dia. C.P. brass shower rose shall conform to I.S. 2556-1972 part XI
and of be of best quality and make as approved by the Engineer-in-charge. The inlet of shower rose
shall be 15 mm. Or 20 mm. As directed.
2.0. Workmanship: 2.1. The C.P. brass shower rose shall be fixed as directed 15 mm. Or 20 mm. Dia.
G.I. inlet pipe as the case may be.
3.0. Mode of measurements & payment :
3.1. The rate includes the cost of all labour, material tools and plant etc. Required for satisfactory
completion of this item.
EW- 246 PUR-F-006 RFQ-73782
3.2. The rate shall be for a unit of one number
Item no.9 Providing & fixing C.P.Brass towel rail complete with C.P.brass brackets fixed to
wooden plugs with C.P. Brass screws size 600 mm x 20 mm.
1.0. Materials: 1.1. The C.P. brass towel rail shall be 600 mm. X 20 mm. Of best quality as approved
by the Engineer-in-charge. The brackets shall be of C.P. brass. The rail shall conform to I.S. 1068-1958.
2.0. Workmanship: 2.1. The brackets of the towel rail shall be fixed by means of C.P. brass to screws
wooden plugs firmly embedded in the wall with C.M. 1:3 (1 cement : 3 coarse sand). The towel rail
shall be fixed as and where directed.
3.0. Mode of measurements & payment :
3.1. The rate includes the cost of all labour, material tools and plant etc. Required for
Satisfactory completion of this item.
3.2. The rate shall be for a unit of one number
Item no.10 Providing & fixing Gate valve/ Gun metal wheel valve 25 mm with due fitting
for G I or U P V C pipes
1. Materials: 1.1 The gun metal check or non-return full way wheel valve of specified dia. Shall
conform to I.S. 778-1964. The non-return valve shall be of tested quality and as per approved by EIC.
2. Workmanship: 2.1 The gun metal check or non-return valve shall be fully cleared of all foreign
matter before fixing. The fixing of valve shall be done by means of bolts nuts and 3 mm. Rubber
insertions with flanges of spigot and socketed tail pieces, drilled to the same specification as in case of
socket and spigot and with flanges in case of flanged pipes. The jointing shall be done leak proof.
3. Mode of measurements & payment:
3.1 The rate includes all labors, materials, tolls and plant etc. Required for satisfactory completion of
3.2 The rate shall be for a unit of one number.
Item no.11 providing & fixing Gate valve/ Gun metal wheel valve 15 mm with due fitting
for G I or C P V C pipes.
The relevant specification of above item no: 23 but for 15 mm dia. shall be followed, but . It shall be
having minimum weight shall lie between 300 to 350 Grams .
The rate shall be for a unit of one number
Item no.12 Providing & fixing 600mm x 450mm x 6mm thick glass beveled edge mirror
superior glass mounted on back side hard board, PVC frame with shelves standard quality
1.0. Materials:
1.1. The 600 mm. x 450 mm. size mirror shall be of superior glass with edge rounded offer bevelled as
specified. It shall be free from flaws specks, or bubbles and its thickness shall riot be less than 6 mm.
The glass for the mirror shall be uniformly silver plated at the back and shall be free from silvering
defects Silvering shall have a protective uniform covering of red load paint. The 6 mm thick ply wood
shall conform to relevant IS. The 6 mm. thick A.C. sheets shall conform to relevant IS specification and
And best quality and make as approved by the Engineer-in-charge.
2.0. Workmanship:-
2.1. The mirror of 600 mm. x 450 mm. size mounted on A.C. Sheet or water proof plywood 6 mm thick
with C.P. brass clips shall be fixed as directed, by fixing wooden plugs in wall and C.P brass screws and
washers. The work shall be carried out in best workman like manner.
3.0. Mode of measurements & payment
3.1. The rate includes cost of all labour and materials, tools and plant etc. required for satisfactory
completion of this item. The rate shall be for a .unit of one number.
Item No.13 Providing and fixing 100mm sand cast iron grating for gully, floor or Nahni trap.
1.0. Materials: 1.1. The cast iron (spun) Nahni trap shall be conforming to M-69. The C.I. hinged of
screwed down cover shall be of best quality and best quality and make as approved by the Engineer-in-
EW- 246 PUR-F-006 RFQ-73782
2.0. Workmanship :
2.1. The Nahni trap shall be jointed with C.I. pipe, 75 mm. Dia. With lead joints. The lead joints shall be
done in conformation with I.S. 782-1976.
3.0. Mode of measurements & payment :
3.1. The rate includes all labour, and materials, tools and plant etc. Required for satisfactory completion
of this item including lead jointing and testing.
3.2. The rate shall be for a unit of one number.
Item no. 14 Providing & fixing Health faucet with 1.0 mtr flexible PVC tube , wall hook, CP
wall bracket for hinging the health faucet connection CP Angular stop cock with wall flange
For hinging the health faucet connection CP Angular stop cock with wall flange etc. Complete. Health
faucets make. Make JAQUAR: CAT NO: CON-573 OR EQ.
The specification of related item is applicable & payment shall be made in respective Item as per item
description. Payment is to be made in per No set.
Item no. 15 Providing & fixing pillar Tap ,capstan head screw down high pressure with
screw & back nut of make crown / sonata / Prince of 15 mm dia heavy duty with flange
duly fitting of U P V C Pipes.
1.0. Materials: 1.1. The capstan head pillar tap of specified dia. of C.P. over brass shall be of best
quality and shall conform to I.S.: 1795-1961. The pillar taps shall be tested quality. It should be 300 to
400 Gram in weight. And best quality and make as approved by the Engineer-in-charge.
2.0. Workmanship: The capstan head pillar tap of specified dia. shall be fixed as directed with
required washer of selected leather or rubber asbestos composition or of plastic as directed. The cock
shall fixed with pipe line with white zink end spun yarn to make joint Water tight. The work shall be
carried out in best workman like manner.
3.0. Mode of measurements & payment:
3.1. The rate includes cost of all labour, materials lolls and plant etc. required for satisfaction
completion of this item.
3.2. The rate shall be for a unit of one number
Item no. 16 providing & fixing 32 mm dia waste coupling including waste pipe for wash
1.0. Materials: 1.1. The C.P. brass waste trap and unions shall be of 32 mm. Dia. And best quality
and make as approved by the Engineer-in-charge.
2.0. Workmanship :
2.1. C.P. brass waste trap and union shall be connected to 32 mm. Dia. Waste pipe which shall be
suitably bent towards the wall and which shall discharge into drain through a floor trap. The C.P. brass
waste trap shall be provided for wash basin or sink as the case may be.
3.0. Mode of measurements & payment :
3.1. The rate includes of all labor and providing C.P. brass waste trap and union including waste
coupling of 32 mm. Dia. The rate excludes the cost of waste pipe of 32 mm.dia.
3.2. The rate shall be for a unit of one number.
Item No.17 Providing and fixing plastic seat and cover for wash down water closer with
C.P. brass hinges and rubber buffers. (B) Black plastic seal and cover.
1.0. Materials: 1.1. Providing and fixing plastic seat and cover for wash down water closer with C.P.
brass hinges and rubber buffers. (B) Black plastic seal and cover shall be as per Indian standard size
And best quality and make as approved by the Engineer-in-charge.
2.0. Workmanship :
2.1. seat cover shall be fixed on existing W.C of good quality bolts and nuts embedded on existing WC
using rubber or fiber washers so as not to allow any lateral displacement.
3.0. Mode of measurements & payment:
EW- 246 PUR-F-006 RFQ-73782
3.1. The rate includes of all labor and providing and fixing plastic seat and cover for wash down water
closer with C.P. brass hinges and rubber buffers. (B) Black plastic seal and cover.
3.2. The rate shall be for a unit of one number.
Providing and laying ceramic tiles 8 mm thick Nitco / Simpolo / Johson / Kajaria / Asian /
Varmora make glazed tiles of size as per approved sample in dado on bed of 10mm thick
cement mortar 1:3 (1:cement;3:coarse sand) finished with flush pointing in white cement
and jointed with white slurry. Minimum size tiles of 300mm x300mm.
Water shall conform to M-1. Cement mortar shall conform to M-11. Ceramic flooring Tiles shall be of
approved brand by EIC from brands given in Item description.
2.0 Workmanship:
2.1.1 The sub-grade shall be cleaned, wetted and mopped. The bedding shall then be laid evenly over
the surface tamped and corrected to desired level and allowed to harden enough to offer a rigid cushion
to tiles and to enable the mason to place wooden planks across and squat on it.
2.1.2 The Ceramic flooring tiles of approved size and brand by EIC shall be laid on cement mortar
bedding of 12 mm or required thick in C.M. 1 : 3 The mortar shall have sufficient plasticity for laying and
there shall be no hard lumps that would interfere with the evenness of bedding. The base shall be
cleared and well wetted. The mortar shall then be spread in thickness not less than 10 mm. at any
2.2 Fixing tiles :
2.2.2 The tiles shall be soaked in water before laying for at least two hours. Neat gray cement grout at
3.3 Kg/Cement/Sq. Mt. of honey like consistency shall be spread over the mortar bedding as directed.
The edges of the tiles shall be smeared with neat cement slurry. The tiles shall be well pressed and
gently tapped with a wooden mallet till they are properly bedded and in level with the adjoining tiles.
There shall be no hollows in bed or joints. The joints between the tiles shall be as thin as possible in
straight line or as per pattern.
2.2.2 The tiles shall not have staggered joints. The joints shall be true to center line both ways. The
Nahni trap coming in the flooring shall be so positioned that its grating shall replace only one tile as far
as possible. Where full size tiles cannot be fixed, they shall be cut (Swan) to the required size and the
edges rubbed smooth to ensure straight and true joints. The joints shall be filled with white Birla or
equivalent brand cement grout after cleaning the joint with wire brush and filling with trowel to a depth
of 8 mm. All loose material shall be removed. After fixing the tile finally in an even plane, the flooring
shall be kept wet and allowed to nature undisturbed for 7 days.
2.3.1 The surplus cement grout that may have come out of the joints shall be cleared off before it sets.
Once the floor has set, it shall be carefully washed, cleared by dilute acid and dried. Proper precaution
and measures shall be taken to ensure that the tiles are not damaged in any way till the completion of
the construction.
1.0 Mode of measurements & Payment:
3.1The work done shall be measured in sq. Mt. For visible area of work done. The length and width of
the flooring shall be measured not-between the faces of skirting or dados or plastered face of wall as
the case may be. The paving under dado or skirting shall not be measured. No deduction shall be made
nor extra paid for any opening in the floor of area up to 0.1 sq. Mt. Nothing extra shall be paid for laying
the floors at different levels in the same rooms.
3.2 The rate shall be for a unit of one sq. Meter.
Item No.19 any item of GOG SOR/any Existing PO item (GOG SOR F Y 2023-24 & corporate
office painting and tiles circular)
The rate shall be for a unit of one Job.
EW- 246 PUR-F-006 RFQ-73782
Booklet for „General Technical specifications for building works‟ of R & B department, GoG & booklet of
„General specification for Civil works‟ of GSECL will be applicable for relevant detail specifications of
items shall be considered & adopted in work.
Chief Engineer (Gen)
Signature Of Contractor GSECL: GTPS
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
GTPS_Tender _ EW-246_13_10_2025.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .