Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
Tender Value
Refer Docs
EMD Value
₹30,000
Closing Date
14 Sept 2022, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
District Collector/Chairman
IInd Floor, DRDA, Collectorate, Karur
Infrastructure Development in Schools and Creating Public Utilities in Package No TN 07 35 of K.Paramathi Block under AGAMT II 2021-2022 of Karur District
2022_RDTN_248806_8
Karur District - K.Paramathi Block-AGAMT-II 21-22
Open Tender
Civil Works
Item Rate
90 days
IInd Floor, DRDA, Collectorate
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹30,000
Yes
IInd Floor, DRDA, Collectorate, Karur
16 Sept 2022
26 Aug 2022
14 Sept 2022
26 Aug 2022
14 Sept 2022
26 Aug 2022
2 Sept 2022
Amount
Name of the Work : Construction of Toilet at Palamapuram PUE School (Boys) H/O Punnam Panchayat.K.Paramathi Union Karur District.
Earth work excavation for foundation in all clauses of soils and sub soils to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and boiling out water whenever necessary et complete complying with standard specification
Cement concrete 1:4:8 [one cement four sand and eight jelly] using 40.m.m. H.B.G.Jelly for foundation including watering whereever necessary and laid in layers not more than 15.c.m. thick compacting etc. complete complying with standard specification and as directed.
Brick work in cm 1:5 mix(one cement and five sand )using fly ash bricks ground maded of size 23 x 11 x 7 cm including curing,finishing and cost & Conveyance of all materials etc., complete.
Refilling the basement with excavated earth other than sand including etc complete
supply and erecting centering
Fabricating
Rcc 1: 1/2 :3 mix using 20 mm ISS HBG metal for RCC items of work excluding items of works excluding centering,shuttering, and ost of reinforcement grill ,out including curing etc complete and also including fixing fan clamps and ixtures in rcc works wh
Plastering with cm 1:5 mix( one cement and five sand ) to 12 mm thick including cost and conveyance of all materials in all floors etc.,as directed by departmental officers etc, complete complying with standard specifications.
Plastering with cm 1:3 mix( one cement and three sand ) to 10 mm thick including cost and conveyance of all materials in all floors etc.,as directed by departmental officers etc, complete complying with standard specifications.
Plastering with cm 1:4mix( one cement and foure sand ) to 20 mm thick including cost and conveyance of all materials in all floors etc.,as directed by departmental officers etc, complete complying with standard specifications.
White wash two Coats using shell lime Including cost and conveyance off all materials and labour charges
Distembering two Coats using Approved distember Including cost and conveyance off all materials and labour charges
Exterior emulsion two Coats using Approved colour pigments Including cost and conveyance off all materials and labour charges
Painting two Coats of new iron works Including cost and conveyance off all materials and labour charges
Supply and FixingWhite glassed earthen ware wash hand basin of size 550x400mm Including all Charges
Supply and Fixing 1000 lit capacity pvc tank Including all Charges
Supply and Fixing in position of GI Pipe Hand Rail 40mm Including all Charges
Supply and Fixing in position pvc Ventilating shaft 110mm dia 3m lengthIncluding all Charges
Providing Granolithic floor finish with CC 1:2:4 using 10-12mm hbg jelly etc complete
Paving the Flooring with Anti Skid tiles 20mm tk Including all labour charges
Dadooing walls Plain Glazed tiles 150mmX150mmX6mm tk Including all labour charges
Cost and Supply of IWSC Including all Charges
Cost and Supply of EWC Including all Charges
Cost and Supply of Steel Door Size of 0.75mX1.80m Including all Charges
Cost and Supply of Steel Door Size o1.00mX1.8m Including all Charges
Water supply Arrangement
110 mm dia pvc pipe 4 ksc
63 mm dia pvc pipe 4 ksc
25 mm dia pvc pipe 10 ksc
Name of the Work : Construction of Toilet at sadaiyampalayam PUE School (Boys) H/O Punnam Panchayat.K.Paramathi Union Karur District.
Earth work excavation for foundation in all clauses of soils and sub soils to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and boiling out water whenever necessary et complete complying with standard specification
Cement concrete 1:4:8 [one cement four sand and eight jelly] using 40.m.m. H.B.G.Jelly for foundation including watering whereever necessary and laid in layers not more than 15.c.m. thick compacting etc. complete complying with standard specification and as directed.
Brick work in cm 1:5 mix(one cement and five sand )using fly ash bricks ground maded of size 23 x 11 x 7 cm including curing,finishing and cost & Conveyance of all materials etc., complete.
Refilling the basement with excavated earth other than sand including etc complete
supply and erecting centering
Fabricating
Rcc 1: 1/2 :3 mix using 20 mm ISS HBG metal for RCC items of work excluding items of works excluding centering,shuttering, and ost of reinforcement grill ,out including curing etc complete and also including fixing fan clamps and ixtures in rcc works wh
Plastering with cm 1:5 mix( one cement and five sand ) to 12 mm thick including cost and conveyance of all materials in all floors etc.,as directed by departmental officers etc, complete complying with standard specifications.
Plastering with cm 1:3 mix( one cement and three sand ) to 10 mm thick including cost and conveyance of all materials in all floors etc.,as directed by departmental officers etc, complete complying with standard specifications.
Plastering with cm 1:4mix( one cement and foure sand ) to 20 mm thick including cost and conveyance of all materials in all floors etc.,as directed by departmental officers etc, complete complying with standard specifications.
White wash two Coats using shell lime Including cost and conveyance off all materials and labour charges
Distembering two Coats using Approved distember Including cost and conveyance off all materials and labour charges
Exterior emulsion two Coats using Approved colour pigments Including cost and conveyance off all materials and labour charges
Painting two Coats of new iron works Including cost and conveyance off all materials and labour charges
Providing Granolithic floor finish with CC 1:2:4 using 10-12mm hbg jelly etc complete
Paving the Flooring with Anti Skid tiles 20mm tk Including all labour charges
Dadooing walls Plain Glazed tiles 150mmX150mmX6mm tk Including all labour charges
Cost and Supply of IWSC Including all Charges
Cost and Supply of EWC Including all Charges
Cost and Supply of Steel Door Size of 0.75mX1.80m Including all Charges
Cost and Supply of Steel Door Size of 1.00mX1.8m Including all Charges
Supply and FixingWhite glassed earthen ware wash hand basin of size 550x400mm Including all Charges
Supply and Fixing 1000 lit capacity pvc tank Including all Charges
Supply and Fixing in position of GI Pipe Hand Rail 40mm Including all Charges
Supply and Fixing in position pvc Ventilating shaft 110mm dia 3m lengthIncluding all Charges
Water supply Arrangement
110 mm dia pvc pipe 4 ksc
63 mm dia pvc pipe 4 ksc
25 mm dia pvc pipe 10 ksc
Name of the Work : Construction of School Toilet (girls) at Velayuthampalayam PUE School H/O Kuppam Panchayat.K.Paramathi Union Karur District.
Earth work excavation for foundation in all clauses of soils and sub soils to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and boiling out water whenever necessary et complete complying with standard specification
Cement concrete 1:4:8 [one cement four sand and eight jelly] using 40.m.m. H.B.G.Jelly for foundation including watering whereever necessary and laid in layers not more than 15.c.m. thick compacting etc. complete complying with standard specification and as directed.
Brick work in cm 1:5 mix(one cement and five sand )using fly ash bricks ground maded of size 23 x 11 x 7 cm including curing,finishing and cost & Conveyance of all materials etc., complete.
Refilling the basement with excavated earth other than sand including etc complete
supply and erecting centering
column
Fabricating
Rcc 1: 1/2 :3 mix using 20 mm ISS HBG metal for RCC items of work excluding items of works excluding centering,shuttering, and ost of reinforcement grill ,out including curing etc complete and also including fixing fan clamps and ixtures in rcc works wh
Plastering with cm 1:5 mix( one cement and five sand ) to 12 mm thick including cost and conveyance of all materials in all floors etc.,as directed by departmental officers etc, complete complying with standard specifications.
Plastering with cm 1:3 mix( one cement and three sand ) to 10 mm thick including cost and conveyance of all materials in all floors etc.,as directed by departmental officers etc, complete complying with standard specifications.
Plastering with cm 1:4mix( one cement and foure sand ) to 20 mm thick including cost and conveyance of all materials in all floors etc.,as directed by departmental officers etc, complete complying with standard specifications.
White wash two Coats using shell lime Including cost and conveyance off all materials and labour charges
Distembering two Coats using Approved distember Including cost and conveyance off all materials and labour charges
Exterior emulsion two Coats using Approved colour pigments Including cost and conveyance off all materials and labour charges
Painting two Coats of new iron works Including cost and conveyance off all materials and labour charges
Supply and FixingWhite glassed earthen ware wash hand basin of size 550x400mm Including all Charges
Supply and Fixing 1000 lit capacity pvc tank Including all Charges
Supply and Fixing in position of GI Pipe Hand Rail 40mm Including all Charges
Supply and Fixing in position pvc Ventilating shaft 110mm dia 3m lengthIncluding all Charges
Providing Granolithic floor finish with CC 1:2:4 using 10-12mm hbg jelly etc complete
Paving the Flooring with Anti Skid tiles 20mm tk Including all labour charges
Dadooing walls Plain Glazed tiles 150mmX150mmX6mm tk Including all labour charges
Cost and Supply of IWSC Including all Charges
Cost and Supply of EWC Including all Charges
Cost and Supply of Steel Door Size of 0.75mX1.80m Including all Charges
Cost and Supply of Steel Door Size of 1.00mX1.8m Including all Charges
Name of the Work : Construction of School Toilet (boys) at Kurumbapatti PUE School H/O Pavitiram Panchayat.K.Paramathi Union Karur District.
Earth work excavation for foundation in all clauses of soils and sub soils to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and boiling out water whenever necessary et complete complying with standard specification
Cement concrete 1:4:8 [one cement four sand and eight jelly] using 40.m.m. H.B.G.Jelly for foundation including watering whereever necessary and laid in layers not more than 15.c.m. thick compacting etc. complete complying with standard specification and as directed.
Brick work in cm 1:5 mix(one cement and five sand )using fly ash bricks ground maded of size 23 x 11 x 7 cm including curing,finishing and cost & Conveyance of all materials etc., complete.
Refilling the basement with excavated earth other than sand including etc complete
supply and erecting centering
Fabricating
Rcc 1: 1/2 :3 mix using 20 mm ISS HBG metal for RCC items of work excluding items of works excluding centering,shuttering, and ost of reinforcement grill ,out including curing etc complete and also including fixing fan clamps and ixtures in rcc works wh
Plastering with cm 1:5 mix( one cement and five sand ) to 12 mm thick including cost and conveyance of all materials in all floors etc.,as directed by departmental officers etc, complete complying with standard specifications.
Plastering with cm 1:3 mix( one cement and three sand ) to 10 mm thick including cost and conveyance of all materials in all floors etc.,as directed by departmental officers etc, complete complying with standard specifications.
Plastering with cm 1:4mix( one cement and foure sand ) to 20 mm thick including cost and conveyance of all materials in all floors etc.,as directed by departmental officers etc, complete complying with standard specifications.
Exterior emulsion two Coats using Approved colour pigments Including cost and conveyance off all materials and labour charges
Painting two Coats of new iron works Including cost and conveyance off all materials and labour charges
Supply and FixingWhite glassed earthen ware wash hand basin of size 550x400mm Including all Charges
Supply and Fixing 1000 lit capacity pvc tank Including all Charges
Supply and Fixing in position of GI Pipe Hand Rail 40mm Including all Charges
Supply and Fixing in position pvc Ventilating shaft 110mm dia 3m lengthIncluding all Charges
Providing Granolithic floor finish with CC 1:2:4 using 10-12mm hbg jelly etc complete
Paving the Flooring with Anti Skid tiles 20mm tk Including all labour charges
Dadooing walls Plain Glazed tiles 150mmX150mmX6mm tk Including all labour charges
Cost and Supply of IWSC Including all Charges
Cost and Supply of EWC Including all Charges
Cost and Supply of Steel Door Size of 0.75mX1.80m Including all Charges
Cost and Supply of Steel Door Size o1.00mX1.8m Including all Charges
Water supply Arrangement
110 mm dia pvc pipe 4 ksc
63 mm dia pvc pipe 4 ksc
25 mm dia pvc pipe 10 ksc
Name of the Work : Construction of School Toilet (boys) at Kulathupalayam PUE School H/O Pavitiram Panchayat.K.Paramathi Union Karur District.
Earth work excavation for foundation in all clauses of soils and sub soils to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and boiling out water whenever necessary et complete complying with standard specification
Cement concrete 1:4:8 [one cement four sand and eight jelly] using 40.m.m. H.B.G.Jelly for foundation including watering whereever necessary and laid in layers not more than 15.c.m. thick compacting etc. complete complying with standard specification and as directed.
Brick work in cm 1:5 mix(one cement and five sand )using fly ash bricks ground maded of size 23 x 11 x 7 cm including curing,finishing and cost & Conveyance of all materials etc., complete.
Refilling the basement with excavated earth other than sand including etc complete
supply and erecting centering
Fabricating
Rcc 1: 1/2 :3 mix using 20 mm ISS HBG metal for RCC items of work excluding items of works excluding centering,shuttering, and ost of reinforcement grill ,out including curing etc complete and also including fixing fan clamps and ixtures in rcc works wh
Plastering with cm 1:5 mix( one cement and five sand ) to 12 mm thick including cost and conveyance of all materials in all floors etc.,as directed by departmental officers etc, complete complying with standard specifications.
Plastering with cm 1:3 mix( one cement and three sand ) to 10 mm thick including cost and conveyance of all materials in all floors etc.,as directed by departmental officers etc, complete complying with standard specifications.
Plastering with cm 1:4mix( one cement and foure sand ) to 20 mm thick including cost and conveyance of all materials in all floors etc.,as directed by departmental officers etc, complete complying with standard specifications.
Exterior emulsion two Coats using Approved colour pigments Including cost and conveyance off all materials and labour charges
Painting two Coats of new iron works Including cost and conveyance off all materials and labour charges
Supply and FixingWhite glassed earthen ware wash hand basin of size 550x400mm Including all Charges
Supply and Fixing 1000 lit capacity pvc tank Including all Charges
Supply and Fixing in position of GI Pipe Hand Rail 40mm Including all Charges
Supply and Fixing in position pvc Ventilating shaft 110mm dia 3m lengthIncluding all Charges
Providing Granolithic floor finish with CC 1:2:4 using 10-12mm hbg jelly etc complete
Paving the Flooring with Anti Skid tiles 20mm tk Including all labour charges
Dadooing walls Plain Glazed tiles 150mmX150mmX6mm tk Including all labour charges
Cost and Supply of IWSC Including all Charges
Cost and Supply of EWC Including all Charges
Cost and Supply of Steel Door Size of 0.75mX1.80m Including all Charges
Cost and Supply of Steel Door Size o1.00mX1.8m Including all Charges
Water supply Arrangement
110 mm dia pvc pipe 4 ksc
63 mm dia pvc pipe 4 ksc
25 mm dia pvc pipe 10 ksc
Name of the Work : Construction of Teacher Toilet at Thottampatti PUM School H/O Monjanur Panchayat .K.Paramathi Union Karur District.
Earth work excavation for foundation in all clauses of soils and sub soils to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and boiling out water whenever necessary et complete complying with standard specification
Cement concrete 1:4:8 [one cement four sand and eight jelly] using 40.m.m. H.B.G.Jelly for foundation including watering whereever necessary and laid in layers not more than 15.c.m. thick compacting etc. complete complying with standard specification and as directed.
Brick work in cm 1:5 mix(one cement and five sand )using fly ash bricks ground maded of size 23 x 11 x 7 cm including curing,finishing and cost & Conveyance of all materials etc., complete.
Brick work in cm 1:5 mix(one cement and five sand )using fly ash bricks ground maded of size 23 x 11 x 7 cm including curing,finishing and cost & Conveyance of all materials etc., complete.
supply and erecting centering
Fabricating
Rcc 1: 1/2 :3 mix using 20 mm ISS HBG metal for RCC items of work excluding items of works excluding centering,shuttering, and ost of reinforcement grill ,out including curing etc complete and also including fixing fan clamps and ixtures in rcc works wh
Plastering with cm 1:5 mix( one cement and five sand ) to 12 mm thick including cost and conveyance of all materials in all floors etc.,as directed by departmental officers etc, complete complying with standard specifications.
Exterior emulsion two Coats using Approved colour pigments Including cost and conveyance off all materials and labour charges
Supply and Fixing 1000 lit capacity pvc tank Including all Charges
Providing Granolithic floor finish with CC 1:2:4 using 10-12mm hbg jelly etc complete
Paving the Flooring with Anti Skid tiles 20mm tk Including all labour charges
Dadooing walls Plain Glazed tiles 150mmX150mmX6mm tk Including all labour charges
Cost and Supply of EWC Including all Charges
Cost and Supply of Steel Door Size of 0.9mX2.00m Including all Charges
Name of the Work : Construction of School Toilet (girls) at Thottampatti PUM School H/O Monjanur Panchayat.K.Paramathi Union Karur District.
Earth work excavation for foundation in all clauses of soils and sub soils to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and boiling out water whenever necessary et complete complying with standard specification
Cement concrete 1:4:8 [one cement four sand and eight jelly] using 40.m.m. H.B.G.Jelly for foundation including watering whereever necessary and laid in layers not more than 15.c.m. thick compacting etc. complete complying with standard specification and as directed.
Brick work in cm 1:5 mix(one cement and five sand )using fly ash bricks ground maded of size 23 x 11 x 7 cm including curing,finishing and cost & Conveyance of all materials etc., complete.
Refilling the basement with excavated earth other than sand including etc complete
supply and erecting centering
column
Fabricating
Rcc 1: 1/2 :3 mix using 20 mm ISS HBG metal for RCC items of work excluding items of works excluding centering,shuttering, and ost of reinforcement grill ,out including curing etc complete and also including fixing fan clamps and ixtures in rcc works wh
Plastering with cm 1:5 mix( one cement and five sand ) to 12 mm thick including cost and conveyance of all materials in all floors etc.,as directed by departmental officers etc, complete complying with standard specifications.
Plastering with cm 1:3 mix( one cement and three sand ) to 10 mm thick including cost and conveyance of all materials in all floors etc.,as directed by departmental officers etc, complete complying with standard specifications.
Plastering with cm 1:4mix( one cement and foure sand ) to 20 mm thick including cost and conveyance of all materials in all floors etc.,as directed by departmental officers etc, complete complying with standard specifications.
White wash two Coats using shell lime Including cost and conveyance off all materials and labour charges
Distembering two Coats using Approved distember Including cost and conveyance off all materials and labour charges
Exterior emulsion two Coats using Approved colour pigments Including cost and conveyance off all materials and labour charges
Painting two Coats of new iron works Including cost and conveyance off all materials and labour charges
Supply and FixingWhite glassed earthen ware wash hand basin of size 550x400mm Including all Charges
Supply and Fixing 1000 lit capacity pvc tank Including all Charges
Supply and Fixing in position of GI Pipe Hand Rail 40mm Including all Charges
Supply and Fixing in position pvc Ventilating shaft 110mm dia 3m lengthIncluding all Charges
Providing Granolithic floor finish with CC 1:2:4 using 10-12mm hbg jelly etc complete
Paving the Flooring with Anti Skid tiles 20mm tk Including all labour charges
Dadooing walls Plain Glazed tiles 150mmX150mmX6mm tk Including all labour charges
Cost and Supply of IWSC Including all Charges
Cost and Supply of EWC Including all Charges
Cost and Supply of Steel Door Size of 0.75mX1.80m Including all Charges
Cost and Supply of Steel Door Size of 1.00mX1.8m Including all Charges
GST Amount for providing Service to Government Contract Works for the above ConstructionWorks. GST Amount is the Total GST Amount for overall quoted amount above this row in column "BB" for all works in this package} (Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD)
APPU CONSTRUCTION
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .