Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹46,634.98Accepted-AOC DAKSHIN KASHI KHONKAR BAZAR MAGRAHAT SOUTH 24 PARGANAS | MAGRAHAT | SOUTH 24 PARGANAS | WEST BENGAL | ₹46,634.98 | L1 | Accepted-AOC L1 |
| 2 | L2₹48,538.43Rejected-AOC | ₹48,538.43 | L2 | Rejected-AOC L2 |
| 3 | L3₹49,509.22Rejected-AOC | ₹49,509.22 | L3 | Rejected-AOC L3 |
| Sl No | Description | Qty | Unit | AHMED ENTERPRISE L1 | SABNAM CONSTRUCTION L3 | RABIUL HOQUE MOLLA L2 |
|---|---|---|---|---|---|---|
| 1.00 | Hire and labour charges for erecting temporary shed covered with waterproof tarpaulin over roof with strong bamboo/sal bullah frame resting on strong salbullah posts as per direction including maintenance as required (upto 10'0" min. ht.) roof should be projected upto 2'0" from all walling. (Payment will be made as per floor area). | 1 | Sq. ft. | 29.09 ₹29.09 | 30.88 ₹30.88 | 30.27 ₹30.27 |
| 2.00 | Hire and labour charges for erecting temporary shed covered with waterproof tarpaulin over roof with strong bamboo/salbullah frame resting on strong salbullah posts including walling with water proof tarpaulin as per requirement and direction including maintenance as required (upto 10'0" min. ht.) Roof should be projected upto 2'0" from all walling. (Payment will be made as per Поог агea) | 1 | Sq. ft. | 37.24 ₹37.24 | 39.54 ₹39.54 | 38.76 ₹38.76 |
| 3.00 | Hire and labour charges for erecting temporary shed covered with G.C.I. Tin roofing over strong salbullahpost and bamboo framing including fitting complete and walling with water proof tarpaulin (upto 10'0" ht. Min.) as per direction. Roof should be projected upto 2'0" from all walling (Payment will be made as per floor area). | 1 | Sq. ft. | 41.55 ₹41.55 | 44.11 ₹44.11 | 43.25 ₹43.25 |
| 4.00 | Hire and labour charges for erecting temporary shed covered with G.C.I. Tin roofing over strong salbullahpost and bamboo framing as per direction. Roof should be projected upto 2'0" from all walling (Payment will be made as per floor area). | 1 | Sq. ft. | 43.63 ₹43.63 | 46.32 ₹46.32 | 45.41 ₹45.41 |
| 5.00 | Hire and labour charges for erecting temporary shed covered with G.C.I. Tin roofing and walling with strong bamboo salbullah frame resting on strong salbullah as per requirement and direction including maintenance as required (upto 100 min. ht.) roof should be projected upto 2'0" from all walling. (Payment will be made as per flooг area). | 1 | Sq. ft. | 47.78 ₹47.78 | 50.73 ₹50.73 | 49.74 ₹49.74 |
| 6.10 | Walling with water proof tarpaulin/hessian with bamboo/sal framing and post complete. | 1 | Sq. ft. | 14.54 ₹14.54 | 15.44 ₹15.44 | 15.14 ₹15.14 |
| 6.20 | Walling with water proof tarpaulin/hessian without bamboo/sal framing and post complete. | 1 | Sq. ft. | 11.43 ₹11.43 | 12.13 ₹12.13 | 11.89 ₹11.89 |
| 7.10 | Inside walling and ceiling with clean white or colour washed cloth with bamboo/ sal framing and post complete (Restricted item). | 1 | Sq. ft. | 12.47 ₹12.47 | 13.23 ₹13.23 | 12.97 ₹12.97 |
| 7.20 | Inside walling and ceiling with clean white or colour washed cloth without bamboo/ sal framing and post complete (Restricted item). | 1 | Sq. ft. | 11.95 ₹11.95 | 12.68 ₹12.68 | 12.43 ₹12.43 |
| 8.10 | Walling with clean G.C.I. Sheets with bamboo/sal frame and post complete as per direction (8'0" to 10'0" ht.). | 1 | R. ft. | 47.78 ₹47.78 | 50.73 ₹50.73 | 49.74 ₹49.74 |
Tender Value
₹20 L
EMD Value
₹40,000
Closing Date
8 Apr 2026, 2:00 pmClosed
ARO AND BLOCK DEVELOPMENT OFFICER
MAGRAHAT - II DEVELOPMENT BLOCK, MAGRAHAT, SOUTH 24 PARGANAS, 743355
Temporary structure work hiring materials temporary toilet and other repairing and construction for Strong Room Commissioning Room and DC and RC or CC Venue at Magrahat Govt I.T.I. ,Vill Mamudpur, P.O. Magrahat, P.S. Magrahat, District South 24 P
2026_ZPHD_1023452_1
WBLA2026/MGT-II/01(02)/MGT-II/ BDO of 2025-26 DT 28-03-2026
Open Tender
CIVIL WORKS
15 days
MAGRAHAT GOVERNMENT ITI COLLEGE
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,000
₹40,000
16 Apr 2026
30 Mar 2026
10 Apr 2026
30 Mar 2026
8 Apr 2026
30 Mar 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Hire and labour charges for erecting temporary shed covered with waterproof tarpaulin over roof with strong bamboo/sal bullah frame resting on strong salbullah posts as per direction including maintenance as required (upto 10'0" min. ht.) roof should be projected upto 2'0" from all walling. (Payment will be made as per floor area). | |||||
| 2Hire and labour charges for erecting temporary shed covered with waterproof tarpaulin over roof with strong bamboo/salbullah frame resting on strong salbullah posts including walling with water proof tarpaulin as per requirement and direction including maintenance as required (upto 10'0" min. ht.) Roof should be projected upto 2'0" from all walling. (Payment will be made as per Поог агea) | |||||
| 3Hire and labour charges for erecting temporary shed covered with G.C.I. Tin roofing over strong salbullahpost and bamboo framing including fitting complete and walling with water proof tarpaulin (upto 10'0" ht. Min.) as per direction. Roof should be projected upto 2'0" from all walling (Payment will be made as per floor area). | |||||
| 4Hire and labour charges for erecting temporary shed covered with G.C.I. Tin roofing over strong salbullahpost and bamboo framing as per direction. Roof should be projected upto 2'0" from all walling (Payment will be made as per floor area). | |||||
| 5Hire and labour charges for erecting temporary shed covered with G.C.I. Tin roofing and walling with strong bamboo salbullah frame resting on strong salbullah as per requirement and direction including maintenance as required (upto 100 min. ht.) roof should be projected upto 2'0" from all walling. (Payment will be made as per flooг area). | |||||
| 6.1 | Walling with water proof tarpaulin/hessian with bamboo/sal framing and post complete. | - | Sq. ft. | - | - |
| 6.2 | Walling with water proof tarpaulin/hessian without bamboo/sal framing and post complete. | - | Sq. ft. | - | - |
| 7.1 | Inside walling and ceiling with clean white or colour washed cloth with bamboo/ sal framing and post complete (Restricted item). | - | Sq. ft. | - | - |
| 7.2 | Inside walling and ceiling with clean white or colour washed cloth without bamboo/ sal framing and post complete (Restricted item). | - | Sq. ft. | - | - |
| 8.1 | Walling with clean G.C.I. Sheets with bamboo/sal frame and post complete as per direction (8'0" to 10'0" ht.). | - | R. ft. | - | - |
stage.html
html • 0.05 MB
technical_2515474.pdf
techsummary_2515474.pdf
finance_2515474.pdf
BOQ Comparative Chart
xlsx
finsummary_2515474.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 13.78 MB
BOQ_2515474.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid