EXECUTIVE ENGINEER
OFFICE OF THE EXECUTIVE ENGINEER, BRIDGES DIVISION,THIRUVNANTHAPURAM
construction of culvert, retaining wall and road concreting
2020_PWD_337170_1
PWD/2019-2020/9555/BDnT
Open Tender
Civil Works - Bridges
Item Rate
270 days
Mannayam
Please refer Tender documents.
7 documents required · 7 mandatory
₹2,760
Yes
online
₹50,000
Yes
28 Feb 2020
20 Jan 2020
30 Jan 2020
20 Jan 2020
28 Jan 2020
20 Jan 2020
Amount
App A - BRIDGE PROPER
12.1.B.1 : Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material. <br> Ordinary Soil - Depth upto 3m - Mechanical Means <br>Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material. Ordinary Soil - Depth upto 3m - Mechanical Means
2.3.1.B : Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, up to a lead of 1000 metres including removal and disposal of top organic soil not exceeding 150 mm in thickness<br> In area of thorny jungle -By Manual Means<br>Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, up to a lead of 1000 metres including removal and disposal of top organic soil not exceeding 150 mm in thickness In area of thorny jungle -By Manual Means
2.4.1.C : Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 metres <br> Prestressed / Reinforced cement concrete grade M-20 & above. - By Manual Means <br>Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 metres Prestressed / Reinforced cement concrete grade M-20 & above. - By Manual Means
2.4.4.B : Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 metres <br> Dismantling Stone Masonry - Rubble stone masonry in cement mortar.<br>Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 metres Dismantling Stone Masonry - Rubble stone masonry in cement mortar.
12.1.3.A : Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material.<br> Hard Rock ( requiring blasting) - Manual Means <br>Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material.Hard Rock ( requiring blasting) - Manual Means
12.8.A.1 : Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications. <br> PCC Grade M15 <br>Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications. PCC Grade M15
od26450/2019_2020 : Pumping or Bailing out water and removing slush etc by using pump set including cost of labour, oil hire charges of pumpset, etc complete DAR - 50.2.3.1
12.8.E.1.1 : Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications. <br> RCC Grade M25 - Using Concrete Mixer <br>Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications. RCC Grade M25 - Using Concrete Mixer
od26452/2019_2020 : Providing dowel bars of size 25 mm dia 3.00 m long at about 100 cm c/c at bottom of abutment keeping 1.50 m into rock and 1.50 m length within cement concrete after drilling holes in granite rock including all cost and conveyance of materials, cutting rods of required length and fixing in position with cement grout 1:2 etc as directed by the departmental officers
12.40 : Supply, Fitting and Placing un- coated HYSD bar Reinforcement in Foundation complete as per Drawing and Technical SpecificationsSupply, Fitting and Placing un- coated HYSD bar Reinforcement in Foundation complete as per Drawing and Technical Specifications
13.5.F.P.1 : Plain/Reinforced cement concrete in sub-structure complete as per drawing and Technical Specifications <br> RCC Grade M25 - Using concrete Mixer - Height upto 5m <br>Plain/Reinforced cement concrete in sub-structure complete as per drawing and Technical Specifications RCC Grade M25 - Using concrete Mixer - Height upto 5m
13.6 : Supplying, fitting and placing HYSD bar reinforcement in sub-structure complete as per drawing and Technical SpecificationsSupplying, fitting and placing HYSD bar reinforcement in sub-structure complete as per drawing and Technical Specifications
14.1.B.1 : Furnishing and Placing Reinforced Cement Concrete Grade M25 Using Concrete Mixer in super-structure as per drawing and Technical SpecificationFurnishing and Placing Reinforced Cement Concrete Grade M25 Using Concrete Mixer in super-structure as per drawing and Technical Specification
14.4 : Providing and laying Cement concrete wearing coat M-30 grade including reinforcement complete as per drawing and Technical Specifications.Providing and laying Cement concrete wearing coat M-30 grade including reinforcement complete as per drawing and Technical Specifications.
14.6 : Construction of precast RCC railing of M30 Grade, aggregate size not exceeding 12 mm, true to line and grade, tolerance of vertical RCC post not to exceed 1 in 500, centre to centre spacing between vertical post not to exceed 2000 mm, leaving adequate space between vertical post for expansion, complete as per approved drawings and technical specifications.Construction of precast RCC railing of M30 Grade, aggregate size not exceeding 12 mm, true to line and grade, tolerance of vertical RCC post not to exceed 1 in 500, centre to centre spacing between vertical post not to exceed 2000 mm, leaving adequate space between vertical post for expansion, complete as per approved drawings and technical specifications.
14.11 : Reinforced cement concrete approach slab including reinforcement and formwork complete as per drawing and Technical specification.Reinforced cement concrete approach slab including reinforcement and formwork complete as per drawing and Technical specification.
14.9 : Drainage Spouts complete as per drawing and Technical specificationDrainage Spouts complete as per drawing and Technical specification
14.10 : PCC M15 Grade leveling course below approach slab complete as per drawing and Technical specification.PCC M15 Grade leveling course below approach slab complete as per drawing and Technical specification.
14.2 : Supplying, fitting and placing HYSD bar reinforcement in super-structure complete as per drawing and technical specificationsSupplying, fitting and placing HYSD bar reinforcement in super-structure complete as per drawing and technical specifications
14.16 : Providing and applying 2 coats of water based cement paint to unplastered concrete surface after cleaning the surface of dirt, dust, oil, grease, efflorescence and applying paint @ of 1 litre for 2 sqm.Providing and applying 2 coats of water based cement paint to unplastered concrete surface after cleaning the surface of dirt, dust, oil, grease, efflorescence and applying paint @ of 1 litre for 2 sqm.
od26453/2019_2020 : Engraving letters in granite slab including painting etc. complete (Based on DSR-16.21)
od26454/2019_2020 : Providing and fixing 18mm thick gang saw cut black granite mirror polished premoulded and prepolished) machine cut of required size of approved shade, colour and texture laid over 20mm thick base cement mortar 1:4 (1 cement : 4 coarse sand) including rubbing, curing, moulding and polishing to edges to give high gloss finish etc. complete at all levels (Based on DSR 8.2.2.2. <br>
App -B -APPROACH ROAD
3.6 : Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and transporting to the embankment location within all lifts and lead upto 1000mExcavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and transporting to the embankment location within all lifts and lead upto 1000m
3.16 : Construction of embankment with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300-2.Construction of embankment with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300-2.
55.14 : Providing and fixing retro-reflectorised ceramic tiles<br>Providing and fixing retro-reflectorised ceramic tiles of size 10cmX20cm using High Intensity Micro Prismatic (Type IV) grade sheeting with 7 years warranty fixed over Ist quality ceramic glazed tiles including cost of glue, cutting charges, fixing with suitable adhisive on concrete or other surface etc complete.Providing and fixing retro-reflectorised ceramic tilesProviding and fixing retro-reflectorised ceramic tiles of size 10cmX20cm using High Intensity Micro Prismatic (Type IV) grade sheeting with 7 years warranty fixed over Ist quality ceramic glazed tiles including cost of glue, cutting charges, fixing with suitable adhisive on concrete or other surface etc complete.
12.4 : Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.
12.8.1.C : Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications <br> RCC Grade M20 - Using Concrete Mixer - (Without formwork) <br>Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications RCC Grade M20 - Using Concrete Mixer - (Without formwork)
8.8 : Painting two coats after filling the surface with synthetic enamel paint in all shades on new plastered concrete surfacesPainting two coats after filling the surface with synthetic enamel paint in all shades on new plastered concrete surfaces
Appendix C -Retaining wall
12.1.1 : Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material.<br> Ordinary soil - Depth upto 3 m - Manual MeansEarth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material.Ordinary soil - Depth upto 3 m - Manual Means
12.4 : Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.
13.5.A : Plain/Reinforced cement concrete in sub-structure complete as per drawing and Technical Specifications <br> PCC Grade M15 - Height upto 5m <br>Plain/Reinforced cement concrete in sub-structure complete as per drawing and Technical Specifications PCC Grade M15 - Height upto 5m
14.2 : Supplying, fitting and placing HYSD bar reinforcement in super-structure complete as per drawing and technical specificationsSupplying, fitting and placing HYSD bar reinforcement in super-structure complete as per drawing and technical specifications
15.10.B : Curtain wall complete as per drawing and Technical Specification :- Cement concrete Grade M15Curtain wall complete as per drawing and Technical Specification :- Cement concrete Grade M15
od26451/2019_2020 : Providing weep holes using 63mm dia. PVC pipes working pressure 4kg /sq.cm including cost of materials, conveyance, labour charges etc. complete
Bidder Name
Thumpara
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_470607.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .