| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹9.3 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹9.9 L+₹62,721.93 (6.73%)Rejected-AOC KOOLETTU HOUSE NEERIKKADU P O KOTTAYAM 686564 | KOTTAYAM | KOTTAYAM | KERALA | 686564 | L2 | Rejected-AOC L2 | |
| 3 | Rejected-Technical | - | Rejected-Technical L3 |
Tender Value
₹11.4 L
EMD Value
₹28,455
Closing Date
23 Dec 2023, 6:00 pmClosed
Asst. Executive Engineer
o/o the Asst. Executive Engineer, MI Sub Division Kottayam
Thodu side protection work using rubble retaining wall
2023_Irrig_631612_1
IRR/IA/TR/306/2023_5_1_1/2
Open Tender
Civil Works - Others
Item Rate
300 days
Kottayam
Please refer Tender documents.
9 documents required · 9 mandatory
₹2,760
Yes
₹28,455
Yes
2 Mar 2024
14 Dec 2023
26 Dec 2023
14 Dec 2023
23 Dec 2023
14 Dec 2023
Amount
Arathooty Puthen Thodu
60.7.3:DISMANTLING DR - Dismanling , clearing away and carefully stacking materials useful for reuse for any thickness of walls in DR masonry including disposal of debris within a distance of 150m.
2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil
60.64.2:Coconut Pile - Supplying and stacking well matured 1/2 split and straight coconut post for driving down throug various strata bellow bed level including cost coveyance labour charges etc complete.
60.64.3:Coconut pile -Supplying 1/4 split well matured and straight coconut wailing pieces and tied to the post with iron wires etc complete as per standard specification.
OD28974/2023-2024:Driving down coconut pile half split to lines and levels through soft to medium clay soil strata including all hire charges and labour and all other appliances necessary for pile driving down after pointing the bottom end.
60.7.8:DR with Departmental. Stone - DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course using departmental rubble including packing to compactness to lines and levels, labour charges etc. complete as per direction of Departmental officers at site
60.7.1:DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course masonry with good quality blasted rubble including packing to compactness to lines and levels cost and conveyance of all materials labour charges etc. complete as per direction of Departmental officers at site
7.1.1:Random rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) up to plinth level with:Cement mortar 1:6 (1 cement : 6 coarse sand)
4.1.3:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III) : 4 graded stone aggregate 20 mm nominal size)
kjthomas
SAJI A KURUVILLA
Bidder Name
kjthomas
SAJI A KURUVILLA
Joseph Thomas
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_956132.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .