Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical | Admitted-Fee/PreQual/Technical |
| 2 | Admitted-Fee/PreQual/Technical STATION ROAD DEOGHAR | Admitted-Fee/PreQual/Technical |
| 3 | Admitted-Fee/PreQual/Technical AT PO KESHAWE PS BARAUNI BEHIND SRIYAM PETROL PUMP KESHAWE BEGUSARAI BIHAR 851134 INDIA | BEGUSARAI | BIHAR | 851134 | Admitted-Fee/PreQual/Technical |
| 4 | Admitted-Fee/PreQual/Technical | Admitted-Fee/PreQual/Technical |
| 5 | Admitted-Fee/PreQual/Technical 316 TO 319 SUVAS SCALA NR SUVAS CASPIA OPP NIKOL POLICE STATION NIKOL AHMEDABAD 382350 GUJARAT | AHMEDABAD | AHMEDABAD | GUJARAT | 382350 | Admitted-Fee/PreQual/Technical |
Tender Value
₹123.4 Cr
EMD Value
₹67.7 L
Closing Date
17 Sept 2026, 3:00 pmClosed
ED/Projects
C-4, District Centre, Saket, New Delhi
Construction of Formation, Blanketing,Minor Bridges,Major Bridges and other ancillary works from Ch Km 52.300(Bijalpura, Nepal) to 68.610 (Bardibas, Nepal) in construction of new BG Rail Line from Jaynagar (India) to Bardibas (Nepal) Railway project
2026_IRCON_284402_1
IRCON/e Tender/JBRLP/2050/Civil Works 52.300 68.610
Open Tender
Civil Works
Percentage
900 days
Bardibas, Nepal
Please refer Tender documents.
8 documents required · 8 mandatory
₹50,000
IRCON INTERNATIONAL LIMITED
₹67.7 L
18 Sept 2026
16 Jul 2026
18 Sept 2026
16 Jul 2026
17 Sept 2026
28 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Item Description | |||||
| 1.01 | Schedule-A Earthwork and Formation | 1 | Lumpsum | 50,56,81,228.67 | ₹50,56,81,228.67 |
| 1.02 | Schedule-B Minor Bridges | 1 | Lumpsum | 7,43,91,297.43 | ₹7,43,91,297.43 |
| 1.03 | Schedule-C Major Bridge Well Foundations Superstructure 30.5 Mtr open web girders | 1 | Lumpsum | 23,38,21,683.94 | ₹23,38,21,683.94 |
| 1.04 | Schedule-D Reinforcement Steel | 1 | Lumpsum | 14,04,94,773.44 | ₹14,04,94,773.44 |
| 1.05 | Schedule-E Supplying Cement | 1 | Lumpsum | 7,47,29,169.04 | ₹7,47,29,169.04 |
| 1.06 | Schedule-F Guide bond | 1 | Lumpsum | 46,55,899 | ₹46,55,899 |
| 1.07 | Schedule-G1 Other ancillary items | 1 | Lumpsum | 1,20,16,000 | ₹1,20,16,000 |
stage.html
html • 0.03 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 1.04 MB
Tender_Document.pdf
Tender Documents • 2.19 MB
BOQ_332004.xls
BOQ • 0.31 MB
Technical_Specifications.pdf
Additional Documents • 19.01 MB
IRGCC_ACS_11_to_IRGCC.pdf
Additional Documents • 7.56 MB
IRGCC_IRGCC.pdf
Additional Documents • 5.97 MB
BOQ.pdf
Additional Documents • 0.86 MB
SHE.pdf
Additional Documents • 2.36 MB
Corrigendum_5.pdf
PDF • 0.15 MB
Corrigendum_4.pdf
PDF • 0.15 MB
Corrigendum_4.pdf
PDF • 0.15 MB
Corrigendum_3.pdf
PDF • 0.13 MB
Corrigendum_2.pdf
PDF • 0.40 MB
Corrigendum_1.pdf
PDF • 0.33 MB
Corrigendum_1.pdf
PDF • 0.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .