Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.9 CrAdmitted-Finance | ₹5.9 Cr | L1 | Admitted-Finance |
| 2 | L2₹6.0 Cr+₹16.6 L (2.84%)Admitted-Finance | ₹6.0 Cr+₹16.6 L (2.84%) | L2 | Admitted-Finance |
| 3 | Rejected-Technical | - | - | Rejected-Technical Refer BOO |
| 4 | Rejected-Technical | - | - | Rejected-Technical Refer BOO |
| 5 | Rejected-Technical | - | - | Rejected-Technical Refer BOO |
| Sl No | Description | Qty | Unit | M/S T N T ENTERPRISES L1 | Mr. Sankatha Prasad Jaiswal L2 |
|---|---|---|---|---|---|
| 1.00Km 2.170 to Km 48.000 on Lumla-Btk-Zimithang Road | |||||
| 1.01 | Providing, laying and compacting Bituminous concrete (BC) to a consolidated thickness of 30 mm including application of tack coat of bitumen emulsion complying with IS 8887 @ 0.25 Kg per square meter area on existing bituminous surface as preparatory to the super imposition of BC mix for carrying out resurfacing works with pre-coated aggregate conforming to table 500-16 and satisfying the requirement of table 500-17 mixed with minimum 5.4% binder asphalt in accordance to Table 500-1 by weight of total mix and 2% cement by weight of mix (for filler) all as specified as per MoRT&H specification for Road and Bridge (Fifth Revision) | 1,00,079.64 | Sqm | - | - |
| 1.02 | Providing, laying and compacting Bituminous Macadam layer (BM) to a consolidated thickness of 30 mm including preparation of surface and application of a tack coat of bitumen emulsion complying with IS 8887 @ 0.25 Kg per square meter area on existing bituminous road surface as preparatory to the super imposition of BM mix with pre-coated aggregate graded as per table No.500-7 and satisfying the physical requirement as per table No.500-6 of MoRT&H specification (Fifth Revision) mixed with minimum 3.4% by weight of total mix as binder in accordance to Table 500-1 as per MoRT&H specification for Road and Bridge works (Fifth Revision) | 10,007.96 | Sqm | - | - |
Tender Value
₹5.4 Cr
EMD Value
₹5.9 L
Closing Date
24 Mar 2020, 1:00 pmClosed
CHIEF ENGINEER P VARTAK
Chief HQ Project Vartak Tezpur Assam 784001
Providing Laying And Compacting of 03 cm thick Bituminous Carpet and Correction Work with 03 cm Bituminous Macadam at different locations Bet Km 2pt170 to Km 48pt000 on road Lumla Btk Zimithang for Resurfacing Works 2020 21 under 117 RCC 763 BRTF
2020_BRO_547852_1
CE(P)/VTK/31/2019-20
Open Tender
Civil Works - Roads
Works
180 days
Bet Km 2pt170 to Km 48pt000 on L-B-Z Road
16 documents required · 16 mandatory
₹0
₹5.9 L
Yes
HQ CE PROJECT VARTAK
5 May 2020
26 Feb 2020
25 Mar 2020
27 Feb 2020
24 Mar 2020
4 Mar 2020
27 Feb 2020 - 2 Mar 2020
3 Mar 2020
Km 2.170 to Km 48.000 on Lumla-Btk-Zimithang Road
Providing, laying and compacting Bituminous concrete (BC) to a consolidated thickness of 30 mm including application of tack coat of bitumen emulsion complying with IS 8887 @ 0.25 Kg per square meter area on existing bituminous surface as preparatory to the super imposition of BC mix for carrying out resurfacing works with pre-coated aggregate conforming to table 500-16 and satisfying the requirement of table 500-17 mixed with minimum 5.4% binder asphalt in accordance to Table 500-1 by weight of total mix and 2% cement by weight of mix (for filler) all as specified as per MoRT&H specification for Road and Bridge (Fifth Revision)
Providing, laying and compacting Bituminous Macadam layer (BM) to a consolidated thickness of 30 mm including preparation of surface and application of a tack coat of bitumen emulsion complying with IS 8887 @ 0.25 Kg per square meter area on existing bituminous road surface as preparatory to the super imposition of BM mix with pre-coated aggregate graded as per table No.500-7 and satisfying the physical requirement as per table No.500-6 of MoRT&H specification (Fifth Revision) mixed with minimum 3.4% by weight of total mix as binder in accordance to Table 500-1 as per MoRT&H specification for Road and Bridge works (Fifth Revision)
Mr. Sankatha Prasad Jaiswal
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.10 MB
TenderdocumentNIT31.pdf
Tender Documents • 1.76 MB
BOQ_574115.xls
BOQ • 0.28 MB
IP31.pdf
Additional Documents • 2.84 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .