Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹81.1 LAccepted-AOC | ₹81.1 L | L1 | Accepted-AOC L1 |
| Sl No | Description | Qty | Unit | ROBINZEN JOSE L1 |
|---|---|---|---|---|
| 1.00Dredging and Reclamation | ||||
| 1.00 | 65.82:Deepening the harbour basin and mouth by using dredger having a flow rate of 700 to 1000m3 slurry per hour with a solid output of not less than 127.5 m3/hour and dumping the spoil at location already pointed out by the departmental officers with a lead up to a radial distance of 500m, including hire charges of dredger, all tools and plants and accesories , fuel charges, idling and mobilisation charges, providing and shifting the pipe lines including all labour charges, incidental charges etc. and drtvice taxes complete for a depth upto (-) 4.50m bedlevel with a tolerance of +/- 20cm. Unexpected Error occured Please Login again!! Click here to Login | 25,600.13 | cum | 186.44 ₹47.7 L |
| 1.00 | OD3576/2025-2026:(Based on CTE approved observed data on 2023)Putting up reclamation bund of top width 2.0m, bottom width 2.75m.and average height of 2.50m
with 1:1/4 side slope and protect the sides with coconut post of 4.50m long driving down
2.00m below bed level at 75cm c/c, providing 3 rows of weiling pieces 1/4 split coconut post
on both sides and 1/4 split cross ties to alternate posts at top, bottom and middle portion
and screening the sides of bund with Seperation memebrane of impermeable plastic sheet
125 micron thick fixed properly using coconut post and weiling pieces using reeper and nails
in full height including tying properly using iron wire and coir altogether and supply and
filling inside with hard clay/cut earth up to 2.50m, levell and conveyed with all leads and
lifts including consolidating properly and maintaing the bund till the work is completed and
dismantling the bund after completion of work etc. as per the directions of departmental
officers at site.
Bottom width 2.75m, Height 2.5m Side slope 1:1/4 Length of coconut pile 4.50m
Spacing 0.75m No. of leyers 2
Length of full coconut pile required for 10m = ((10/0.75)+1)x2x4.5 = 126m
Length of (1/4 split) coconut cross ties for 10m = 3x2.5 av. x 7 Nos. = 52.50 m
Length of 1/4 split weiling pieces for 10m = 3x2x10 = 60m
cost of full coconut post (Details vide 60.64.1), Coconut post required for 1m
=126/10 = 12.6m (average length of coconut pile is 6 m and dia 25cm) Assuming
cocunut post can be used 2 times
No. of coconut pile required for 1m = 12.6/6 = 2.1 nos.
Carriage of timber = 2.1x6x3.14x0.125x0.125 = 0.618cum
Assume 3 rows wailing pieces in both sides and 3 cross ties, Total 52.60+60 -
112.50m Hence for 1.0m = 112.50/10 = 11.25m
6m long coconut tree equals 24m 1/4 split coconut piles ,
coconut post required = 11.25/24 = 0.469nos.
Carriage required = 6x3.14x0.125x0.125 = 0.294cum
Sawing area for 1m = 0.375x6x2x0.25 = 1.406sq.m
Carpenter II class required = (4.3/10)x1.125 = 0.4838nos.
Totla no.of coconut pile for 10m length @ 0.75m c/c = 10/0.75+1 = 14 nos on both
sides = 14x2 = 28 nos. for 1m length = 28/10 = 2.8 nos Pile driving down length =
2.0m total length 2.0x2.8 = 5.6m
Screening the frame with polythene sheet nailed to wailing pieces and coconut post,
Plythene sheet require =10.3x2x2.50 = 51.50sqm For 1m = 51.5/10 = 5.15sqm
Quantity of clay = (2.0+2.75)/2x2.50 = 5.94cum | 180 | metre | 4,444.57 ₹8.0 L |
| 1.00 | 2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil | 203 | cum | 344.83 ₹70,000.49 |
| 1.00 | 60.7.2:DR PACKING Under foundation - Dry stone packing under foundation with good quality blasted rubble including conveyance of material and labour charges etc. complete as per direction of departmental officers at site. | 56 | cum | 2,844.35 ₹1.6 L |
| 2.00Drain | ||||
| 2.00 | 11.4.1.1:Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 I. P.C.C grade M 10 (i) Nominal mix 1:3:6 | 19 | cum | 8,628.8 ₹1.6 L |
| 2.00 | 12.5.4:Plain/reinforced cement concrete in substructure complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 ans 1204 For height upto 5 m IV. R.C.C. grade M 25 | 114.5 | cum | 10,536.62 ₹12.1 L |
| 2.00 | 12.7:Supplying, fitting and placing TMT bar reinforcement (Fe 415) in substructure complete as per drawings and technical specification Clauses 1002, 1005, 1010 & 1202 | 9.68 | tonne | 96,747.78 ₹9.4 L |
Tender Value
₹84.6 L
EMD Value
₹50,000
Closing Date
10 Nov 2025, 6:00 pmClosed
EXECUTIVE ENGINEER
HARBOUR ENGINEERING DIVISHION ERNAKULAM PALLIPORT PO MUNAMBAM 683515
GENERAL_Capital repairs and maintenance Capital Dredging and reclamation of Vypin Fish Landing Centre_Work_General Civil Work
2025_HED_793002_4
HED/CEHED/212/2025-2026
Open Tender
Civil Works - Others
180 days
VYPIN
Please refer Tender documents.
9 documents required · 9 mandatory
₹2,760
Yes
₹50,000
Yes
8 Jun 2026
1 Nov 2025
12 Nov 2025
1 Nov 2025
10 Nov 2025
1 Nov 2025
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1370689.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.55 MB
sbd.pdf
Tender Documents • 4.79 MB
FORMATofFORMS.pdf
Tender Documents • 0.55 MB
BOQ_1370689.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid