| # | Company | Status |
|---|---|---|
| 1 | Accepted-Technical 735 R N TAGORE ROAD DUM DUM KOLKATA 700077 | 24 PARAGANAS NORTH | WEST BENGAL | 700077 | Accepted-Technical OK |
| 2 | Accepted-Technical | Accepted-Technical OK |
| 3 | Accepted-Technical BIDHAN MARKET BARASAT | BARASAT | Accepted-Technical OK |
| 4 | Rejected-Technical | Rejected-Technical Non-submission of credential of similar nature and License to Electrical Contractor. |
| 5 | Rejected-Technical 00 DEY ENTERPRISE SODEPUR 9 10 PITS COLLIERY ASANSOL BARDHAMAN WEST BENGAL 713372 | PASCHIM BARDHAMAN | WEST BENGAL | 713372 | Rejected-Technical Non-submission of credential of similar nature and License to Electrical Contractor. |
Tender Value
₹6.0 L
EMD Value
₹11,967
Closing Date
22 Aug 2026, 10:00 amClosed
Executive Engineer
Araksha Bhawan 3rd Floor Block DJ Sector II Salt Lake City
Day to day operation and maintenance work of pump motor set and allied job for Barasat PS asnd Housing, Banamalipore Housing, Doltala Police Line, Under Barasat Police District for FY 2026-2027. (1st Call)
2026_WBPHI_5018362_1
WBPHIDCL/EE-(HQ-I)/NIT- 22(e)/2026-2027
Open Tender
ELECTRICAL WORKS M/R
Percentage
Refer to NIT
Please refer Tender documents.
6 documents required · 6 mandatory
₹0
₹11,967
Yes
13 Oct 2026
11 Aug 2026
24 Aug 2026
11 Aug 2026
22 Aug 2026
13 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Electrical (maintenance works) and operation of pump- motor sets.
Note:All the item of SOR of PWD Electrical works w.e.f 1.11.2017 including up to date addenda , corrigenda and the approved non schedule item of works (including 18% GST & 1% labour cess)
( The work shall continue of the entire contract period as per the requirement & as directed by the Engineer in charge .The payment of the executed work shall be made on the basis of - (A) PWD schedule of rates (B) As per the ANNEXURE - 2023/2 for non-schedule items (C) List of rates proposed by PWD (Sub Committee) on 27/02/2026 for different electrical works.) | - | LOT | 80,000 | - |
| 2 | Day to day Operation of pump- motor sets Supply of manpower for operation of pump-motor sets and controlling valves in water supply line to provide uniterrupted water supply with minor electromechanical works ,if required for a period of 274 days as per direction of EIC. at given locations-.
1. Barasat PS & Housing 2. Doltala Police Line 3. Banamalipore Housing Shift Duration:- I) 10.00A.M to 6:00 P.M ( Three Number of Skilled Electrician Cum Pump Operators per shift ) is to be provided by the agency (minimum tools and tackles should be provided by the agency) - As and where required.
Electrician Cum Pump Operators (Skilled) =(1x274x3)** { Shift x Days x Man Power}
( RATES ARE INCLUDING 10 % AGENCY PROFIT ,18% GST & 1% LABOUR CESS ) | - | PerShiftPerElectricianCumPumpOperator | 630.58 | - |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.18 MB
Tendernotice_2.pdf
PDF • 0.41 MB
Tendernotice_3.pdf
PDF • 0.91 MB
BOQ_5089331.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .