Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
| 3 | Rejected-Technical NA | Rejected-Technical Technical Specification not found OK |
Tender Value
Refer Docs
EMD Value
₹1,950
Closing Date
26 Dec 2023, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
se edc bhadohi
office of SE edc Bhadohi
work of line shifting and electrifcation for STW under deposit scheme 2023-24 in juridiction of EE EDD I Bhadohi
2023_PVVNV_871877_1
72/EDC(Bh)/2023-24
Open Tender
Electrical Works
Lump-sum
60 days
bhadohi
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,180
EE EDD I BHADOHI
₹1,950
28 Dec 2023
18 Dec 2023
27 Dec 2023
18 Dec 2023
26 Dec 2023
18 Dec 2023
Amount
Work of Line Shifting and Electrification for STW under Deposit Scheme 2023-24 under EE EDD I Bhadohi.
Carriage of 8.5 Mtr Long PPC Pole from Store to Site (Accroding to Estimate) with Lodding and unlodding.
Errection of 8.5 Mtr Long PPC Pole (Accroding to Estimate) with All Fitting As per Respo Norms.
Carriage of ACSR Weasol Conductor From Store to Site (Accroding to Estimate) with Lodding and unlodding And Laying of its Cable with All Fitting as per Respo Norms.
Carriage of AB Conductor (3x120+1x95+1x16 sq mm 600 MTR and 3x95+1x35+1x16 sqmm 230 MTR) From Store to Site (Accroding to Estimate) with Lodding and unlodding And Laying of its Cable with All Fitting as per Respo Norms.
Carriage of 25 Kva Distribution TF From Store to Site (Accroding to Estimate) with Lodding and unlodding.
Installation of 25 Kva Distribution TF with All Fitting As per Respo.
Carriage of all Centralised materials from store to site (as per estimate) with lodding and unlodding, Errection/installation/laying with all fitting as per requirement. 27 No of KV Disk Insulator, 51 No. of 11 kv Pin insulator with Pin, 15 No of Stay Set Complete, 05 No of T-off channel with clamp and Nut&Bolt, 04 No of Sub-Station Base, 28 No of Earthing Complete, 2 No of Top Channel, 04 No of Dropper Channel, 10 No of 11 Kv Cross Arm MS Angel, 1 No of Distribution box ETC.
Carriage of all DeCentralised materials from store to site (as per estimate) with lodding and unlodding, Errection/installation/laying with all fitting as per requirement. 1- Suspension Clamp 16 No 2- Claimp for Channel 14 No. 3- Nut and Bolt 04 Kg. 4- cross arm holding clamp with nut and bolt 15 No 5- Danger Board 10 No. 06- I Hook with clamp 18 No. 07- F-Breacket with nut&Bolt 10 No. 08- Three Phase Distribution box 12 No. 09- Clamp for Distribution box 14 No. 10- LT Clamp with nut&Bolt 12 No. 11- Shackle Insulator 12 No. 12- Dead and Clamp 3 No. 13- U Clamp 7 No.
Concreting/Grouting of Pole with All Fitting as per respo norms.
Concreting/Grouting of Stay with All Fitting as per respo norms.
M/S HARI OM ASSOCIATE
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .