Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Tender Value
₹9.0 L
EMD Value
₹10,000
Closing Date
21 Oct 2026, 6:00 pm
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Executive Engineer, Panchayat R & B Division, Vadodara
Construction of at Prahmik School Compound wall Ghanshyampura Primary School Village Nimeta under New Gujarat Pattern 2025-26
354270
10 of 2026-2027
Open
Civil - All
Works
Vadodara
5 documents required · 5 mandatory
₹900
Executive Engineer, Panchayat (R and B) Division, Vadodara
₹10,000
9 Oct 2026
9 Oct 2026
9 Oct 2026
21 Oct 2026
9 Oct 2026
BILL OF QUANTITIES
Item Description Quantities Unit Item Rates Amount
Excavation for foundation upto 1.5 m depth including sorting out and
1 stacking of useful materials and disposing off the excavated stuff upto 50 119.34 Cum 262.52
Meter lead.(C) Hard Murrum
Providing and Laying Cement Concrete 1:3:6 (1 cement :3 Coarse Sand :6
2 Hand Broken Stone Aggregates 40 mm nominal size) and curing etc. 12.12 Cum 3080.91
complete excluding cost of form work in (A) foundation and Plinth
Providing and laying controlled cement concrete M.250 and curing
3 complete including the cost of formwork and excluding reinforcement for 17.75 Cum 4799.28
reinforced concrete work in (A) Foundations, footings, and Mass concrete.
Providing and laying controlled cement concrete M-250 and curing
complete including the cost of form work but excluding the cost of
reinforcement for reinforced concrete work in (D) Columns up to Plinth
Providing and laying controlled cement concrete M-250 and curing
complete including the cost of form work but excluding the cost of
reinforcement for reinforced concrete work in (C) Ground Beam and Plinth
Providing TMT Bar FE 500D reinforcement for R.C.C. work including
bending, binding and placing in position complete upto floor two level
Filling available excavated earth (excluding rock) in trenches ,plinth, sides
7 of foundations etc.in layers not exceeding 20cm in depth consolidating each 77.09 Cum 133.66
deposited layer by ramming & watering.
Providing and laying controlled cement concrete M-200 and curing
complete including the cost of form work but excluding the cost of
reinforcement for reinforced concrete work in (D) Columns on Ground
Providing and laying controlled cement concrete M-200 and curing
9 complete including the cost of form work but excluding the cost of 3.18 Cum 835.84
reinforcement for reinforced concrete work in (C) Coping
Brick Work using Common Burnt Clay Building Bricks having crushing
strength not less than 35 kg / Sq. cm. in foundation and plinth. In Cement
Mortar 1:6 (1 Cement : 6 Fine Sand) (B) Conventional Extra for brick work
in superstructure above plinth level upto floor two level
Providing 15 mm. thick cement plaster in single coat on brick/concrete wall
11 for interior plastering upto floor two level finished even and smooth in (CM 328.30 Sqmt 220.62
1:3) finishing with a floating coat of neat cement slurry
Finishing wall with weather proof exterior emulsion paint on wall surface
(two coats) to give an required shape even shade after thoroughly brushing
the surface to remove all dirt, and remains of loose powdered materials etc.
Steel work, welded in built up sections framed work including cutting,
hoisting, fixing in position and applying a priming coat of red lead paint.
13 (A)In beams and joists, channels angles Tees, flats, with connecting plates 2.93 q 9108.49
or angle cleats as in main and cross beams. Hip and jack rafters, purlins
conneted to common rafters and the like
Painting two coats (excluding priming coat) on new steel and other metal
surface with enamel paint, brushing, interior to give an even shade
including cleaning the surface an even shade including cleanicn the surface
of all dirt, dust and other foreign matter.
Nine Lakh Four Thousund Nine Houndred Eighty Seven & Fifty Six Paisa Only
(A) Total Tendered Amount Rs. _________________________
(B) Rebate on Tendered Amount (if any) _______% (in Figures) Rs. _________________________
(C) Net Tendered Amount (A – B) Rs. _________________________
(* Please strike out whichever is not applicable).
Construction of at Prahmik School Compound wall Ghanshyampura Primary School Village Nimeta under
New Gujarat Pattern 2025-26
BILL OF QUANTITIES
Item Description Quantities Unit Item Rates Amount
1. All work shall be carried out as per public works Department Handbook and other specifications of Division or as
2. All the columns is Schedule should be filled in ink and the total of the entries in the last column should be struck by the
3. Rates quoted include clearance of site (Prior commencement of work and as its close) in all respects and hold good for
4. To be Continued on additional sheets, if found necessary.
5. 1.00 % of Construction cost shall be deducted form Bill. Amount of Contract as per the Building and other Construction
6. Credit of dismantled materials of amount of Rs.0.00 must be recovered from Contractor's first R.A Bill.
7. For abnormal high or law rates payment of such items shall be regulated as per Govt. circular No. PARACH / 102008 /
8 The contractor shall exhibit a board as per Government Circular No. Vernacular TNC/1090/24/S dated 05.03.2011 with
9 Testing of material shall be done as per statement attached with specification. The material should be tested in GERI or
10 In all R.C.C. items in rate analysis, standard cement consumption has been taken as per Govt. GR. PRC- 10/ 2017/
11 The Contractor is solely responsible to bare all applicable taxes i.e. GST etc. & department will not entertain any
Sr.Divisional Account Officer Deputy Executive Engineer
Panchayat (R&B) Division R&B (Panchayat) Sub-Division
Vadodara Vadodara
Executive Engineer
Dated Signature of R&B (Panchayat) Division
the Contractor. Vadodara
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
0.NIT Compound wall.pdf
1.SBD Compound wall.pdf
2.Schedule B (BOQ).pdf
2B.Compound Wall Model.pdf
6.Specification Index.pdf
7.Specification Aganwadi Compound wall.pdf
10.Testing Schedule.pdf
GR 1.pdf
GR 2.pdf
GR 03 New added 25-26.pdf
Performance Bond and Bitumen date.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .