| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹9.3 LAdmitted-Finance | -34.34% | ₹9.3 L | L1 | Admitted-Finance |
| 2 | L2₹9.7 LAdmitted-Finance | -32.00% | ₹9.7 L | L2 | Admitted-Finance |
| 3 | L3₹9.9 LAdmitted-Finance | -30.11% | ₹9.9 L | L3 | Admitted-Finance |
| 4 | L4₹10.4 LAdmitted-Finance | -26.88% | ₹10.4 L | L4 | Admitted-Finance |
| 5 | L5₹13.1 LAdmitted-Finance | -7.88% | ₹13.1 L | L5 | Admitted-Finance |
Tender Value
₹14.2 L
EMD Value
₹28,440
Closing Date
5 May 2026, 6:00 pmClosed
DCF BUNDI
DCF BUNDI
FALENDA WHS 044 RANGE HINDOLI
2026_FORES_554223_9
DCF BUNDI NIT - 01/2026-27
Open Tender
Civil Works
BUNDI
Please refer Tender documents.
2 documents required · 2 mandatory
₹500
AS PER NIT
₹28,440
Yes
18 May 2026
25 Apr 2026
6 May 2026
25 Apr 2026
5 May 2026
25 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1ITEMS | |||||
| 1.01 | Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth upto 30 cm measured at a height of 1 m above ground level and removal of rubbish upto a distance of 50 m outside the periphery of the area cleared. | 500 | Sqm | 5 | ₹2,500 |
| 1.02 | Earth work in excavation by mechanical means (Hydraulic excavator )/ manual means over areas (exceeding 30cm in depth. 1.5m in width as well as 10 sqm on plan) including disposal of excavated earth, lead upto 50m and lift upto 1.5 m , disposed earth to be levelled and neatly dressed : All kinds of soil | 184.38 | Cum | 175 | ₹32,266.5 |
| 1.03 | Providing and laying in position cement concrete including curing, compaction etc. complete in specified grade excluding the cost of centering and shuttering - All work up to plinth level. 1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) | 72.54 | Cum | 3,302 | ₹2,39,527.08 |
| 1.04 | Random Rubble stone masonry for with hard stone in foundation and plinth in Cement Sand mortar above 30 CM thick wall in. foundation ratio Cement Mortar 1:6 ( 1-Cement : 6-Sand) | 111.84 | Cum | 2,838 | ₹3,17,401.92 |
| 1.05 | Random Rubble stone masonry with hard stone in superstructure above plinth level and upto five level above 30cm. thick walls in. superstructure ratio Cement Mortar 1:6 ( 1-Cement : 6-Sand) | 1 | Cum | 3,479 | ₹3,475.52 |
| 1.06 | Providing & fixing precast cement concrete coping 1 : 2 : 4 mix 50mm thick complete as per specification : | 1 | Sqm | 367 | ₹366.63 |
| 1.07 | Providing and laying in position cement concrete including curing, compaction etc. complete in specified grade excluding the cost of centering and shuttering - All work up to plinth level.
"M15 grade Nominal Mix
1: 2: 4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20mm nominal size)." | 2.55 | Sqm | 4,624 | ₹11,791.2 |
| 1.08 | Plaster on new surface on walls in cement sand mortar 1:4 including racking of joints etc. complete fine finish : 25 mm thick. | - | Sqm | 227 | - |
| 1.09 | Filling available excavated earth (excluding rock) in trenches, plinth side of foundation etc. in layers not exceeding 20 cm. in depth, consolidating each deposited layer by ramming and watering including lead up to 50 meter and with all lift. | 210 | Cum | 64 | ₹13,440 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 12.83 MB
BOQ_987195.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid