Loading…
Loading…
Tender Value
₹16.8 L
EMD Value
₹17,000
Closing Date
19 Jun 2026, 6:00 pm
Executive Engineer R and B Division Modasa
SR To Various Govt. Office Building At Malpur & Megharaj, (Providing Annual Repairing & Maintenance work & Other Misc. work)
311142
Nivida No.01 of 2026-27
Open
Civil Works - Others
Arvalli
9 documents required · 5 mandatory · 4 optional
₹900
Executive Engineer, R and B Division, Modasa
₹17,000
4 Jun 2026
4 Jun 2026
4 Jun 2026
19 Jun 2026
4 Jun 2026
Item Rate In
(with brief specification and reference to book of Quantity Unit Amount
No. figures
specifications)
1 Dismentaling tiled of stone floors laid in mortar 95.00 49.18 Smt
including stacking of serviceable materilas and
disposal of unserviceable materials with all lead
2 Dismentling doors, windows, ventilators etc. (wood 10.00 191.85 Smt
or steel) shutters including chowkhats architraves,
holdfasts and other attachment etc. complete and
stacking them within all lead and lift. (i) Not
exceeding 3 Sq.M. in area.
3 Providing and laying white glazed tiles 6mm thick 14.30 950.55 Smt
in flooring treads of steps and landing laid on a
bed of 12mm thick cement mortar 1:3 (1-cement :
3-coarse sand ) finishing with flush pointing in
white cement.
4 Providing and laying coloured glazed tiles of the 79.70 1487.88 Smt
size 300 mm x 200 mm x 8 mm / 300 mm x
mm x 8 mm in skirting, risers of steps and dedo on
10 mm. thick cement plaster 1:3 (1 cement :
coarse sand) & jointed with white cement slurry.
5 Providing and fixing FRP frame size 100x50 mm 16.05 2377.76 Smt
and 28mm thick FRP depress panel shutter having
extra reinforcement on sides & edges in Gel coat
finish. The core of the shutter & frame is to be filed
up with injected fire retardant grade polyurethene
foam done in situ alongwith embedded wooden
pieces for stiffening & also taking hinges &
fintures. The whole FRP frame & shutter is to be
water proof weather proof, termite proof &
resistance to mild acid/alkali. Rates are to be
inclusive of S.S hinges with necessary screws &
alluminium fixtures & fastenings & fastener sleeve.
6 Providing and fixing wash down water closet 10.00 1356.81 Nos
(European type, W.C. Pan) with integral P or S
trap including jointing the trap with soil pipe in
Cement Mortar 1:1 (1-Cement : 1-fine sand) (Seal
and cover to be measured and paid for separately)
(A) vitreous China Pattern : (i) in white colour
Description of Item
Item Rate In
(with brief specification and reference to book of Quantity Unit Amount
No. figures
specifications)
7 Providing and fixing screw down bib taps of 12.00 186.83 Nos
following size.(B) Brass chromium plated screws
down Bib Tap. (i) 15mm dia.
8 Providing laying and jointing in true line and level 50.00 72.65 Rmt
15mm dia. U.P.V.C. Pipe ( SCH- 40) for cold water
including fittings as approved by Engineer In
Charge. Pipe shall be fixed on the wall with the
help of clamp at every two metre C/C or shall be
concealed as directed including necessary fittings
etc. including testing of pipe and joints and fixing
the same with adhesive solvent, including cost of
all materials.
9 Providing laying and jointing in true line and level 30.00 91.84 Rmt
25mm dia. U.P.V.C. Pipe ( SCH- 40) for cold water
including fittings as approved by Engineer In
Charge. Pipe shall be fixed on the wall with the
help of clamp at every two metre C/C or shall be
concealed as directed including necessary fittings
etc. including testing of pipe and joints and fixing
the same with adhesive solvent, including cost of
all materials.
10 Scraping oil paint from steel and other metal 7840.00 51.78 Smt
surfaces and making the surface even (with hand
11 Applying two coats of primer of approved brand 3230.00 95.92 Smt
and manufacture on new wall surface to give an
even shade including thoroughly brushing the
surface free from mortar dropping and other
foreign matter and sand papered smooth and
Finishing wall with weather proof exterior emulsion
paint on wall surface (two coats) to give an
required shape even shade after thoroughly
brushing the surface to remove all dirt, and
remains of loose powdered materials.etc
12 Applying two coats of Birla or Asian acrylic lappy 4609.50 40.59 Smt
(putty) and two coats of primer of approved brand
and manufacture on new wall surface to give an
even shade including thoroughly brushing the
surface free from mortar dropping and other
foreign matter and sand papered smooth.
Description of Item
Item Rate In
(with brief specification and reference to book of Quantity Unit Amount
No. figures
specifications)
13 Wall painting (three coats) including priming coat 4609.50 125.52 Smt
with plastic emulsion paint of approved brand and
manufacture on undecorated wall surfaces to give
an even shade including thoroughly brushing the
surface free from mortar droppings and other
foreign matter and sand papered smooth including
applying priming coat etc. complete.
Total Rs.
Rupees Sixteen Lakh Eighty Thousand Five Hundred EightyNine and Paisa Thirteen Only
I / We am / are willing to carry out the work at ________________________________% above / below
percent (should be written in figure and words) of the estimated rate mentioned above. Amount of my / our
tender works out as under.
Estimated amount put to tender Estimated amount put to tender
Deduct_________% Below Add_________% Above
Net Rs.__________________ Net Rs.__________________
In words __________________ In words __________________
1 The Contractor shall exhibit a board with detailed specification and details of work as directed by the
Engineer-In-Charge for which no extra payment shall be made.
2 The labour cess will be deducted as per prevailing rules i.e. 1% of the work done.
3 GST and Income tax TDS will be deducted at a source while making payments of bills.
4 In all R.C.C. Items in Rate Analysis Standard Cement Consumption has been taken as per Govt. G.R.:
PRC-10/2017 Cement Consumption/16/C Date:11/05/2017 as stated in S.O.R. therefore in R.C.C.
items where there is a change as per actual mix design the cost of difference of cement consumption
have been deducted from the rate of original item at the rate of input rate mentioned in all the tender.
Signature of Contractor
Deputy Executive Engineer Executive Engineer
R.& B. Sub Division R.& B. Division
Malpur Modasa
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
SBD Book SR To Various Govt. Office Building.pdf
BOQ - SR To Various Govt. Office Building At Malpur and Megharaj.pdf
Specification Index -SR To Various Govt. Office Building At Malpur.pdf
BUILDING WORK BOOKLET.pdf
Details Spe.-SR To Various Govt. Office Building At Malpur.pdf
GR - 1.pdf
General Specification.pdf
GR - 2.pdf
GR - 3.pdf
GR - 4.pdf
GR - 5.pdf
GR - 6 - SBD Change.pdf
Work Details - SR To Various Govt. Office Building At Malpur.pdf
Download all tender documents and submit your bid