Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.7 LAccepted-Finance | L1 | Accepted-Finance L1 | |
| 2 | L2₹1.7 L+₹2,600 (1.57%)Rejected-Finance | L2 | Rejected-Finance L2 | |
| 3 | L3₹1.7 L+₹6,877 (4.15%)Rejected-Finance | L3 | Rejected-Finance L3 | |
| 4 | L4₹1.7 L+₹7,100 (4.28%)Rejected-Finance | L4 | Rejected-Finance L4 |
Tender Value
Refer Docs
Closing Date
11 Sept 2021, 9:00 amClosed
Yogendra Kumar
GARRISON ENGINEER HISAR, HISAR MIL STN
REPAIR/CLEANIG OF 3 NOS X 12 HP SEWAGE NON CLOG SUBMERSIBLE PUMP MOTOR AND STARTERS AT BANA SINGH VIHAR
2021_MES_472909_1
3008/Job/04/E3
Limited
Miscellaneous Services
Item Rate
30 days
Garrison Engineer Hisar Mil Stn
Pl refer tender documents
3 documents required · 3 mandatory
₹0
Exempted
17 Sept 2021
4 Sept 2021
13 Sept 2021
5 Sept 2021
11 Sept 2021
5 Sept 2021
Amount
1. Pumping out raw sewage water using pump sets of diesel engine driven from sewage well Installation to facilitate removal and installation of submersible pump set and connected accessories including blocking flow of sewage from nearby manhole and pumping the same till the job is completed for 08 (Eight) hours per dayminimum and disposal of the same through proper pipelines to a distance not less than 150 meter from the under ground sewage well of size internal dia 05.70 m and depth 05.2m bana singh vihar installation all as directed. 2. Taking out by raising/fllowering of non clog submersible pump set of make:-KSB Model-KRTU PK 100-260-74 type AC 50 C/S three phase 415 V with the help of chain pully block or any suitable means from sewage well/sump after diaconnecting electric and sewage coupling connections,openig of pump and motor for carrying out repairs/replecment of defective parts,cleaning of impeller and volutc casing,clogged discharge line Reassemoling,painting the pump set and reinstallation into sewage sump connecting,testing complete to running parameters all as direted by Engr-in-Charge. 3. M&L for rewinding 3 phase, 415 volt electric motor cap-12 HP Srl.no (9973373100-400-01)of non clog submersible pumps, Make : KSB, model KRTU 100-260-74, after dismantling the stator and rotor, removing burnt windings, cleaning the slots, rewinding the motor with super enamelled quality hermatic grade copper winding wire of proper gauge and number of turns as per the existing windings including Class 'F' insulation, Dr. Back Elmo-50 Varnish, pre-heating to remove moisture and vaccum pressure impregnated for air bubble free varnishing with slot liners and seperators, fibre - glass sleeves, baking to 150° C for 12 hrs in special baking oven to suit the motor for IP-68 protection of the 9.5KW/12 HP motor, reassembling fixing in position and testing complete all as specified and directed. (Renewal of defective parts as supply only and dewatering will be paid separately ). 4. Cleaning of raw sewage sump well of size internal dia 5.7 mtr and 5.2 mtr deep including inlet box, Bar screen, oil & grease trap by removing sludge and slit completely with suitable pumps from the bottom of sewage sump (app deposit of sludge 0.95 mtr ht) by scrapping out deposit, sludge etc from the side walls of sewage sump with the help of scraper, wire brush etc removing and cleaning with clear water.Removing and depositing the sludge and slit to a distance not exceeding 08 Kms from the sewage well by tractor trolley ensuring that sludge does not spoil the roads. cleaning the area around the sewage sump not exceeding 5 mtr on either side including bushes etc and cleaning the site all as directed by Engineer-in-Charge. 5. Renewals of following parts for making theNon clog pump 9.5 KW/12 HP ,model KRTU 100 -260-74,make:- KSB in fully serviceable condition during the process of repair as per existing complete all as specified and directed (a) Suppy only Mechanical seal (out side) lower (b) Suppy only Mechanical seal (in side) upper (c) Suppy only Lower ball bearing. (c) Suppy only Upper ball bearing (d) Suppy only Key for shaft (e) Suppy only O ring set (f) Suppy only Thermister (Top) (g) Suppy only Oil (IOC Oil-15W-40). 6. Repair to LT panel board at sewage pump house by disconnecting the electric connection and carrying out following repairs / replacement (a) Replacement of power contactor MNX-32.Make- L&T (b) Replacement of MCB,TP ,63 Amp. 240/415 volts 50 Hz 'C' curve . Make L&T.02 Nos. (c) Replacement of change over switch 125 Amp.,415 volts 50 Hz rated current 80 KA rms. Make Havells 01 No. 7. S&F in replacement of Sluice valve of 100mm size/dia pressure Rating :P-1.0 seat Nitrile,flange Std,as per existing complete
fauji electric works
SAINI ELECTRIC STORE
KUNAL ENTERPRISES
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
finance_527509.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .