| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹17.9 LAdmitted-Finance | -8.20% | ₹17.9 L | L1 | Admitted-Finance |
| 2 | L2₹18.5 L+₹58,525.98 (3.27%)Admitted-Finance NA | -5.20% | ₹18.5 L+₹58,525.98 (3.27%) | L2 | Admitted-Finance |
Tender Value
₹19.5 L
EMD Value
₹39,020
Closing Date
9 Sept 2026, 6:00 pmClosed
EE PWD DIV SULTANPUR
EE PWD DIV SULTANPUR
Kota development of sports ground of village Hanotia along with construction of boundary wall in village Panchayat Banethia Panchayat Samiti. Sultanpur
2026_CEPWD_592467_10
EE PWD DIV SULTANPUR NITNO-30/2026-27
Open Tender
Civil Works
Percentage
90 days
KOTA
Please refer Tender documents.
2 documents required · 2 mandatory
₹500
500 EE PWD DIV SULTANPUR
₹39,020
Yes
17 Sept 2026
27 Aug 2026
10 Sept 2026
27 Aug 2026
9 Sept 2026
27 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (Hydraulic excavator )/ manual means over areas (exceeding 30cm in depth. 1.5m in width as well as 10 sqm on plan) including disposal of excavated earth, lead upto 50m and lift upto 1.5 m , disposed earth to be levelled and neatly dressed : All kinds of soil | 202.5 | Cum | - | - |
| 2 | Providing and laying in position cement concrete including curing, compaction etc. complete in specified grade excluding the cost of centering and shuttering - All work up to plinth level. M10 grade Nominal Mix
1: 3: 6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20mm nominal size). | 22.5 | Cum | - | - |
| 3 | Random Rubble stone masonry for with hard stone in foundation and plinth in Cement Sand mortar above 30 CM thick wall in:
Cement Mortar 1:6 ( 1-Cement : 6-Sand). | 209.25 | Cum | - | - |
| 4 | Providing and laying in position specified grade of cement concrete for all RCC structural elements upto plinth level including curing, compaction, finishing with rendering in cement sand mortar 1:3 (1 cement: 3 coarse sand) and making good the joints and cost of plastizers( if required) excluding the cost of centering, shuttering and reinforcement. M20 grade Nominal Mix / Design Mix | 20.16 | Cum | - | - |
| 5 | Providing and fabricating reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding (including cost of binding wire) all complete up to floor five level. ('Original producers' who manufacture billet directly from iron ores and roll the bilets to produce steel conforming to IS:1786)Thermo-mechanically Treated bars (Conforming of relevent IS code) | 987.68 | kg | - | - |
| 6 | Centering & shuttering with plywood or steel sheets including strutting, propping bracing both ways with steel props and removal of formwork for upto floor five level for :
Suspended floors, roofs, landings, staircases, balconies, girders, cantilevers, bands, coping bed plates, anchor blocks, sills, chhajjas, lintel, beam, plinth beam etc. | 106.64 | Sqm | - | - |
| 7 | Random Rubble stone masonry with hard stone in superstructureabove plinth level anduptofive level above 30cm. thick walls in :Cement Mortar 1:6 ( 1-Cement : 6-Sand). | 171 | Cum | - | - |
| 8 | Pointing on stone masonry in cement sand mortar 1:3 (1 cement : 3 sand) : Flush / Ruled/ Struck or weathered pointing. | 900 | Sqm | - | - |
| 9 | Providing and laying cement concrete including curing, compaction etc. complete in retaining walls, return walls, walls (any thickness) including attached pilasters, columns, piers, abutments, pillars, posts, struts, buttresses, string or lacing courses, parapets, coping, bed blocks, anchor blocks, plain window sills, fillets, levelling course etc up to floor five level excluding the cost of centering and shuttering.M15 grade Nominal Mix 1: 2: 4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20mm nominal size). | 5.7 | Cum | - | - |
| 10 | Construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300-1 and 300-2 with a lead upto 50 m as per MoRTH Specification Clause 305.3 | 1,560 | Cum | - | - |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 5.45 MB
Tendernotice_2.pdf
PDF • 1.39 MB
Tendernotice_3.pdf
PDF • 11.56 MB
Tendernotice_4.pdf
PDF • 0.47 MB
BOQ_1052746.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .